[{"Asset ID":"AG-L-0001","Project / plant":"Ambuklao Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Ambuklao","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Reservoir / impounding","Turbine technology":"Not established","Developer / operator":"SN Aboitiz Power - Benguet, Inc.","River / basin":"Ambuklao River / Upper Agno","Storage epoch and level basis":"Original327/258/69;2012 survey121.01/54.77/66.24 is separate","Water-level / area basis":"Crest758; max/FSL752. Crest excluded from max water field.","Mean inflow basis":"Calculated from historical annual runoff. Averaging years unspecified. Historical catchment inflow, not current monthly series.","Peak inflow period and basis":"May1976. Historical recorded peak reported by NPC; no claim to2026 all-time maximum.","Shared reservoir ID":null,"Source IDs":"V6S01; V6S07","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V6S07","tech_family":"Reservoir / impounding","installed_mw_source_vintage":104.55,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":758.0,"fields":{"Q":{"evidence":105.0},"R":{"evidence":129.0},"S":{"evidence":452.0},"T":{"evidence":327.0},"U":{"evidence":258.0},"V":{"evidence":69.0},"W":{"evidence":327.0},"X":{"evidence":752.0},"Y":{"evidence":740.0},"Z":{"evidence":752.0},"AA":{"evidence":7.5},"AB":{"evidence":690.0},"AC":{"evidence":40.52906431414303},"AD":{"evidence":3000.0}},"missing_evidence_fields":0,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":120.7403,"lat":16.465}},{"Asset ID":"AG-L-0014","Project / plant":"Binga Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Itogon","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Reservoir / impounding","Turbine technology":"Francis (four vertical shaft units)","Developer / operator":"SN Aboitiz Power - Benguet, Inc.","River / basin":"Agno River","Storage epoch and level basis":"NPC undated22.83/17.56/5.27; dead cutoff563 differs from modern minimum566;2015 total21 separate","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger | V10 AA: Reservoir area (reference level not stated); 2008 description of existing 1960 dam; Reference water level not stated; pre-2008 value; reservoir heavily silted (IFC expects run-of-river condition by 2027)","Mean inflow basis":"Reported historical recorded mean flow. Reproduced from2011 PSALM study in2020 EIS. Record years and naturalization not established. Includes upstream regulated contributions where relevant.","Peak inflow period and basis":"October2009. Extreme flood-event peak, not a certified all-record maximum.","Shared reservoir ID":null,"Source IDs":"V6S01; V6S08; V6S09; V7S06; V6S28","Record scope":"Awarded contract list, Aug2026","Warnings":"V10 new: AA=4.26 reported historical (V6S28)","Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V6S08; V6S09; V7S06; V6S28","tech_family":"Reservoir / impounding","installed_mw_source_vintage":140.08,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":138.0},"R":{"evidence":107.4},"S":{"evidence":215.0},"T":{"evidence":22.83},"U":{"evidence":17.56},"V":{"evidence":5.27},"W":{"evidence":22.83},"X":{"evidence":575.0},"Y":{"evidence":566.0},"Z":{"evidence":575.0},"AA":{"evidence":4.26},"AB":{"evidence":936.0},"AC":{"evidence":56.0},"AD":{"evidence":4000.0}},"missing_evidence_fields":0,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":120.6811,"lat":16.3881}},{"Asset ID":"AG-L-0120","Project / plant":"Magat Hydroelectric Power Plant","Island":"Luzon","DOE region":"II","Province":"Isabela","Municipality":"Ramon","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Reservoir / impounding","Turbine technology":"Not established","Developer / operator":"SN Aboitiz Power - Magat, Inc.","River / basin":"Magat River / Cagayan River Basin","Storage epoch and level basis":"NIA1080/810/270 retained. WB/NIA manual1250/933/317 separate, no mixing","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":"Calculated from historical annual runoff. Pre-/design hydrology. Includes upstream basin. Not a contemporary naturalized monthly series.","Peak inflow period and basis":"November9-14,2020 TyphoonUlysses. Post-dam event maximum.1971 river29480 is pre-dam and kept separately.","Shared reservoir ID":"MAGAT","Source IDs":"V6S01; V6S10; V7S04; V7S09","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V6S10; V7S04; V7S09","tech_family":"Reservoir / impounding","installed_mw_source_vintage":360.0,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":345.6},"R":{"evidence":114.0},"S":{"evidence":4160.0},"T":{"evidence":1080.0},"U":{"evidence":810.0},"V":{"evidence":270.0},"W":{"evidence":1080.0},"X":{"evidence":197.6},"Y":{"evidence":160.0},"Z":{"evidence":193.0},"AA":{"evidence":45.0},"AB":{"evidence":4143.0},"AC":{"evidence":212.2468121783659},"AD":{"evidence":7128.0}},"missing_evidence_fields":0,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.453,"lat":16.829}},{"Asset ID":"AG-L-0159","Project / plant":"Angat Hydroelectric Power Plant","Island":"Luzon","DOE region":"III","Province":"Bulacan","Municipality":"Norzagaray","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Reservoir / impounding","Turbine technology":"Not established","Developer / operator":"Angat Hydropower Corporation","River / basin":"Angat River","Storage epoch and level basis":"1967 design1075/850/225 atFSL217; current normal210 differs","Water-level / area basis":"Normal210=NIA operating context. Max219/min180, area23 at217 and storage tuple are historical1967 design.","Mean inflow basis":"Reported historical recorded mean flow. Reproduced from2011 PSALM study in2020 EIS. Record years and naturalization not established. Includes upstream regulated contributions where relevant.","Peak inflow period and basis":"5650 in1978.1983-1987 instantaneous peak cells blank; not zero. Not a2026 all-time record.","Shared reservoir ID":"ANGAT","Source IDs":"V6S12; V7S01; V7S02; V7S06","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S12; V7S01; V7S02; V7S06","tech_family":"Reservoir / impounding","installed_mw_source_vintage":254.58,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":223.5,"fields":{"Q":{"evidence":null},"R":{"evidence":131.0},"S":{"evidence":568.0},"T":{"evidence":1075.0},"U":{"evidence":850.0},"V":{"evidence":225.0},"W":{"evidence":1075.0},"X":{"evidence":219.0},"Y":{"evidence":180.0},"Z":{"evidence":210.0},"AA":{"evidence":23.0},"AB":{"evidence":568.0},"AC":{"evidence":65.0},"AD":{"evidence":5650.0}},"missing_evidence_fields":1,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.1417,"lat":14.8708}},{"Asset ID":"AG-L-0169","Project / plant":"Caliraya Hydrolectric Power Plant","Island":"Luzon","DOE region":"IV-A","Province":"Laguna","Municipality":"Lumban","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Reservoir / impounding","Turbine technology":"Not established","Developer / operator":"Cleanergy 9 Power Inc.","River / basin":null,"Storage epoch and level basis":"Historic86/78/8 at288/276.1990 PSH79.01/22.09 between288/286 separate","Water-level / area basis":"Historical min276; max289.15 dry/288 wet from1990; not a current rule curve.","Mean inflow basis":"Water-balance reconstructed annual inflow. Caliraya plus Lumot transferred runoff. Back-calculated from levels, generation and pumping. Shared with Kalayaan; do not count twice.","Peak inflow period and basis":null,"Shared reservoir ID":"CALIRAYA-UPPER","Source IDs":"V6S01; V7S01; V7S03","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S01; V7S01; V7S03","tech_family":"Reservoir / impounding","installed_mw_source_vintage":35.02,"potential_mw_awarded_list":0.0,"dam_crest_elevation_masl":292.0,"fields":{"Q":{"evidence":35.0},"R":{"evidence":42.0},"S":{"evidence":500.0},"T":{"evidence":86.0},"U":{"evidence":78.0},"V":{"evidence":8.0},"W":{"evidence":86.0},"X":{"evidence":289.15},"Y":{"evidence":276.0},"Z":{"evidence":288.0},"AA":{"evidence":null},"AB":{"evidence":129.0},"AC":{"evidence":6.33761756280579},"AD":{"evidence":null}},"missing_evidence_fields":2,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Lumban","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0167","Project / plant":"Kalayaan Pumped Storage Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-A","Province":"Laguna","Municipality":"Kalayaan and Lumban","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"Cleanergy 9 Power Inc.","River / basin":null,"Storage epoch and level basis":"Shared Caliraya reservoir values are held onCaliraya row; do not add another storage volume","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":"CALIRAYA-UPPER","Source IDs":"V6S01","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S01","tech_family":"Pumped storage","installed_mw_source_vintage":661.3,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":720.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kalayaan,Lumban","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0002","Project / plant":"Cabulig Hydroelectric Power Plant","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Claveria","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis (two units)","Developer / operator":"Mindanao Energy Systems, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V7S07","Record scope":"Awarded contract list, Aug2026","Warnings":"Dam height15m from revisedPDD conflicts with contractor38m; retain design qualifier.","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02; V7S07","tech_family":"Run-of-river","installed_mw_source_vintage":9.214,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":8.3},"R":{"evidence":15.0},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":0.067},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":11,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Claveria","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0138","Project / plant":"Commonal-Uddiawan Hydroelectric Power Plant","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Solano","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river without reservoir","Turbine technology":"Francis (two horizontal units)","Developer / operator":"Smith Bell Mini-Hydro Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V7S08","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V7S08","tech_family":"Reservoir / impounding","installed_mw_source_vintage":1.8,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.8},"R":{"evidence":4.0},"S":{"evidence":20.0},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":11,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.1806,"lat":16.5181}},{"Asset ID":"AG-L-0031","Project / plant":"Irisan 1 Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tuba","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river without reservoir","Turbine technology":"Pelton (vertical four-jet)","Developer / operator":"Hedcor, Inc.","River / basin":"Elew River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V7S12; V10S023","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V7S12; V10S023","tech_family":"Reservoir / impounding","installed_mw_source_vintage":3.897,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":3.3},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":120.5258,"lat":16.4289}},{"Asset ID":"AG-L-0002","Project / plant":"Cattubo I Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Atok","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Green Indigenous Environment Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Atok","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0003","Project / plant":"Cattubo II Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Atok","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Green Indigenous Environment Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Atok","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0004","Project / plant":"Naguey Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Atok","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"ZAK Green Energy, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Atok","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0005","Project / plant":"Camp John Hay Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Baguio City and Tuba","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"River Flow Ventures & Power Energy Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.7,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Baguio City,Tuba","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0006","Project / plant":"Ampohaw Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Bakun","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Hedcor, Inc.","River / basin":"Balili River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S030","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S030","tech_family":"Run-of-river","installed_mw_source_vintage":8.0,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":7.5},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":120.5268,"lat":16.4559}},{"Asset ID":"AG-L-0007","Project / plant":"Lon-oy Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Bakun","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Hedcor, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01","tech_family":"Run-of-river","installed_mw_source_vintage":3.6,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":3.3},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":120.4916,"lat":16.6963}},{"Asset ID":"AG-L-0008","Project / plant":"Lower Labay Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Bakun","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Hedcor, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01","tech_family":"Run-of-river","installed_mw_source_vintage":2.4,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":2.3},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":120.3955,"lat":16.7922}},{"Asset ID":"AG-L-0009","Project / plant":"F. L. Singit Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Bakun","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"2 x vertical Pelton (replaced 7 Francis units in 2014-15 expansion)","Developer / operator":"Hedcor, Inc.","River / basin":"Bakun River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S023; V10S029","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S01; V10S023; V10S029","tech_family":"Run-of-river","installed_mw_source_vintage":5.9,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":6.0},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":4.35,"low":4.35,"high":4.35,"new_cell":true,"limitation":"[\"News report; 'improved to' interpreted as raised weir height; reference (riverbed vs foundation) not stated | V10 independent review: Ferdinand Singit: 4.35 m and 3.6 m are reported as after/before improvement, not necessarily simultaneous physical disagreement. Only secondary news linked; no primary structural datum/current design verified. Leave R unresolved under requested height-conflict rule; retain dated history separately.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0027"}},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Bakun","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0010","Project / plant":"Man-asok Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Buguias","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"3 turbine-generator units of ~1 MW each (type not stated); plant up to 3.2-3.24 MW","Developer / operator":"Benguet Electric Cooperative, Inc.","River / basin":"Upper Agno River headwaters; weir ('mini dam') at Sitio Alapang, Sebang, Buguias","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S052","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S052","tech_family":"Run-of-river","installed_mw_source_vintage":3.24,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":3.2},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":120.8594,"lat":16.7433}},{"Asset ID":"AG-L-0011","Project / plant":"Sal-angan Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Itogon","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Hedcor, Inc.","River / basin":"Sal-angan River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S023","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S023","tech_family":"Run-of-river","installed_mw_source_vintage":2.4,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.8},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.4,"lat":16.4}},{"Asset ID":"AG-L-0012","Project / plant":"San Roque Upper East Pumped Storage Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Itogon","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"San Roque Hydropower Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":600.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Itogon","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0013","Project / plant":"San Roque West Pumped Storage Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Itogon","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"San Roque Hydropower Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":800.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Itogon","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0015","Project / plant":"San Roque Lower East Pumped-Storage Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Itogon","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"San Roque Hydropower Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":800.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Itogon","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0016","Project / plant":"Kabayan 2 (formerly Natalang B) Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Kabayan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Hedcor Kabayan, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":52.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kabayan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0017","Project / plant":"Eddet 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Kabayan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Tagel Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kabayan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0018","Project / plant":"Eddet 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Kabayan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Tagel Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kabayan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0019","Project / plant":"Kabayan 4 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Kabayan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Tagel Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":20.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kabayan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0020","Project / plant":"Pacso Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Kabayan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Tagel Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":7.2,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kabayan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0021","Project / plant":"Kabayan 3 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Kabayan and Buguias","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Tagel Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":14.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kabayan,Buguias","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0022","Project / plant":"Pudong I Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Kapangan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Green Indigenous Environment Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kapangan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0023","Project / plant":"Pudong II Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Kapangan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Green Indigenous Environment Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kapangan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0024","Project / plant":"Kapangan Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Kapangan and Kibungan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river (no reservoir per owner's engineer); weir diversion + ~8-9 km tunnel + surge tank + powerhouse","Turbine technology":"3 x 20 MW (type not stated)","Developer / operator":"Cordillera Hydro Electric Power Corporation","River / basin":"Amburayan River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S039; V10S040; V10S041","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S039; V10S040; V10S041","tech_family":"Reservoir / impounding","installed_mw_source_vintage":0.0,"potential_mw_awarded_list":60.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kapangan,Kibungan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0025","Project / plant":"Kibungan Pumped-Storage Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Kibungan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"Coheco Badeo Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":500.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kibungan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0026","Project / plant":"Bineng 3 Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"La Trinidad","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Hedcor, Inc.","River / basin":"Balili River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S028","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S028","tech_family":"Run-of-river","installed_mw_source_vintage":4.5,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":3.6},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":120.576,"lat":16.491}},{"Asset ID":"AG-L-0027","Project / plant":"La Trinidad Hydroelectric Plant","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"La Trinidad","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Pelton, vertical 6-nozzle, 2 x 10 MW (GUGLER Water Turbines; commissioned June 2019)","Developer / operator":"Hedcor, Inc.","River / basin":"Balili River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S024; V10S025","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S024; V10S025","tech_family":"Run-of-river","installed_mw_source_vintage":20.4,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":8.5},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":120.581,"lat":16.458}},{"Asset ID":"AG-L-0028","Project / plant":"Payeo Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Mankayan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Polaris Power Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.2,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Mankayan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0029","Project / plant":"Abdao Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tuba","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"AV Garcia Power Systems Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tuba","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0030","Project / plant":"Irisan 3 Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tuba","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Hedcor, Inc.","River / basin":"Elew River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S023","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S023","tech_family":"Run-of-river","installed_mw_source_vintage":1.2,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.1},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":120.5258,"lat":16.4289}},{"Asset ID":"AG-L-0032","Project / plant":"Tadiangan Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tuba","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Goldlink Global Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.7,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tuba","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0033","Project / plant":"Abdao 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tuba","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"AV Garcia Power Systems Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tuba","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0034","Project / plant":"Kennon Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tuba","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"J3S Hydro Power Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tuba","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0035","Project / plant":"Tuba Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tuba","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"AQA Green Renewable Energy Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.1,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tuba","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0036","Project / plant":"Asin 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tuba","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Baguio Asin Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tuba","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0037","Project / plant":"Asin 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tuba","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Baguio Asin Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tuba","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0038","Project / plant":"Asin 3 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tuba","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Baguio Asin Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tuba","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0039","Project / plant":"Tublay 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tublay","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"AT Dinum Company","River / basin":"Payay and Dug-ong Rivers, Brgy Tuel, Tublay","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S054","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S054","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tublay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0040","Project / plant":"Tublay 3 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tublay","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"AT Dinum Company","River / basin":"Ambongdolan, Tublay (river not named in source)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S054","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S054","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tublay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0041","Project / plant":"Alanod 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tublay","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Tagel Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.9,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tublay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0042","Project / plant":"Alanod 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tublay","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Tagel Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tublay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0043","Project / plant":"Tublay 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Benguet","Municipality":"Tublay & La Trinidad","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"AT Dinum Company","River / basin":"Payong River, Brgy Basil, Tublay","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S054","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S054","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.9,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tublay,La Trinidad","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0044","Project / plant":"Biyao Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Kalinga","Municipality":"Balbalan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Biyao Hydro Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Balbalan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0045","Project / plant":"Mabaca 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Kalinga","Municipality":"Balbalan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"JBD Water Power (JWPI) Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":45.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Balbalan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0046","Project / plant":"Buaya Hydroelectric Power Project (formerly Mabaca HPP)","Island":"Luzon","DOE region":"CAR","Province":"Kalinga","Municipality":"Balbalan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"JBD Water Power (JWPI) Inc.","River / basin":"Cal-oan River (locally called Mabaca River), Saltan tributary system","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S044","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S044","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":40.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Balbalan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0047","Project / plant":"Saltan D River Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Kalinga","Municipality":"Balbalan and Pinukpuk","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"JBD Water Power (JWPI) Inc.","River / basin":"Saltan River (Chico tributary); dam site Gawaan (Salogsog domain), powerhouse on Poswoy lands","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S043","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S043","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":49.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Balbalan,Pinukpuk","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0048","Project / plant":"Saltan River Site E Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Kalinga","Municipality":"Balbalan and Pinukpuk,","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"JBD Water Power (JWPI) Inc.","River / basin":"Saltan River; powerhouse at Brgys Apatan and Allaguia (Pinukpuk)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S043","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S043","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":45.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Balbalan,Pinukpuk","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0049","Project / plant":"Pasil C Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Kalinga","Municipality":"Pasil","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"I-Magat Renewable Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.75,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Pasil","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0050","Project / plant":"Pasil B Hydrolectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Kalinga","Municipality":"Pasil","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"I-Magat Renewable Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":15.68,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Pasil","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0051","Project / plant":"Bulanao Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Kalinga","Municipality":"Tabuk","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"DPJ Engineers and Consultants","River / basin":"Chico River via NIA UCRIS main canal / Tabuk Supply Canal 1 (Bulanao Irrigation Canal)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S037","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S037","tech_family":"Run-of-river","installed_mw_source_vintage":1.014,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.44,"lat":17.417}},{"Asset ID":"AG-L-0052","Project / plant":"Chico Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Kalinga","Municipality":"Tabuk","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"San Lorenzo Ruiz Builders & Developers Group, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":150.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=City of Tabuk","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0053","Project / plant":"Upper Tabuk Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Kalinga","Municipality":"Tabuk City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Reservoir/storage dam with sluice gates for sediment flushing; also intended for irrigation","Turbine technology":"2 turbines (10-17 MW total; type not stated)","Developer / operator":"DPJ Engineers and Consultants","River / basin":"Tanudan River (tributary of Chico), dam at Brgy Dupag a short distance above Chico confluence","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S034; V10S035","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S034; V10S035","tech_family":"Reservoir / impounding","installed_mw_source_vintage":null,"potential_mw_awarded_list":15.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=City of Tabuk","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0055","Project / plant":"Calanan Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Kalinga","Municipality":"Tabuk City","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Violago Gold Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":60.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=City of Tabuk","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0056","Project / plant":"Dalimuno Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Kalinga","Municipality":"Tabuk City","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Violago Gold Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":58.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=City of Tabuk","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0057","Project / plant":"Tinglayan Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Kalinga","Municipality":"Tinglayan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Pan Pacific Renewable Power Phils. Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":22.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tinglayan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0058","Project / plant":"Boga Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Mt. Province","Municipality":"Bauko","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Kadipo Bauko Hydropower Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Bauko","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0059","Project / plant":"Upper Chico Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Mt. Province","Municipality":"Bauko","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Kadipo Bauko Hydropower Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Bauko","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0060","Project / plant":"Lower Chico Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Mt. Province","Municipality":"Bauko","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Kadipo Bauko Hydropower Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.1,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Bauko","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0061","Project / plant":"Besao 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Mt. Province","Municipality":"Besao","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"BIMAKA Renewable Energy Development Corporation (BREDCO)","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Besao","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0062","Project / plant":"Besao 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Mt. Province","Municipality":"Besao","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"BIMAKA Renewable Energy Development Corporation (BREDCO)","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":7.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Besao","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0063","Project / plant":"Besao 3 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Mt. Province","Municipality":"Besao","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"BIMAKA Renewable Energy Development Corporation (BREDCO)","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Besao","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0064","Project / plant":"Besao 1B Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Mt. Province","Municipality":"Besao","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"BIMAKA Renewable Energy Development Corporation (BREDCO)","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.7,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Besao","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0065","Project / plant":"Sabangan Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Mt. Province","Municipality":"Sabangan","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Pelton (vertical six-jet)","Developer / operator":"Hedcor Sabangan, Inc.","River / basin":"Chico River (intake weir/tapping point at Otucan Norte, Bauko; powerhouse Napua/Namatec, Sabangan)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S021","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S021","tech_family":"Run-of-river","installed_mw_source_vintage":14.139,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":15.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":120.909,"lat":16.947}},{"Asset ID":"AG-L-0066","Project / plant":"Lamut Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Asipulo","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Electro-mechanical supply by GUGLER (turbine type/units not stated)","Developer / operator":"Lamut-Asipulo Mini Hydro Corporation","River / basin":"Cawayan River (Brgys Pula & Panubtuban, Asipulo; straddling Asipulo-Lamut)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S051","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S051","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Asipulo","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0067","Project / plant":"Likud 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Asipulo","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"First Ifugao Renewable Energy Corporation","River / basin":"Guihingon River (boundary of Asipulo and Kiangan ancestral domains)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S046; V10S047","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S046; V10S047","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.56,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Asipulo","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0068","Project / plant":"Likud Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Asipulo & Kiangan","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Horizontal-shaft Francis x 2, 420 kW each, 1,200 rpm (max output 820 kW)","Developer / operator":"Provincial Government of Ifugao","River / basin":"Lamut River (tributary of Magat), intake at Brgy Haliap (16°44'24.70\"N, 121°05'30.61\"E)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger | V10 Z: Intake water level (headpond normal level at weir); design; ROR intake water level; labelled","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S001","Record scope":"Awarded contract list, Aug2026","Warnings":"V10 new: R=4.5 reported design (V10S001); S=22 reported design (V10S001); Z=600 reported design (V10S001); AB=44 reported design (V10S001)","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S01; V10S001","tech_family":"Run-of-river","installed_mw_source_vintage":0.9,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.0},"R":{"evidence":4.5},"S":{"evidence":22.0},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":600.0},"AA":{"evidence":null},"AB":{"evidence":44.0},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":9,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Asipulo,Kiangan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0069","Project / plant":"Anaba Hydroelectric Power Project.","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Banaue","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Ifugao Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Banaue","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0070","Project / plant":"Olilicon Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Ilagan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Diversion hydro with pondage (design inference)","Turbine technology":"Not established","Developer / operator":"SN Aboitiz Power - Ifugao, Inc.","River / basin":"Ibulao River (weir at Sitio Nammug, Bimpal, Lamut); water diverted by tunnel to Alimit River reservoir","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S33; V10S031","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S33; V10S031","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":20.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":14.0},"S":{"evidence":null},"T":{"evidence":0.25},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":0.25},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":303.4},"AA":{"evidence":0.16},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":9,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-L-0072","Project / plant":"Ambangal Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Kiangan","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Provincial Government of Ifugao","River / basin":"Ambangal River (intake Sitio Ba-ay, between Ambabag and Pindungan)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S042","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S01; V10S042","tech_family":"Run-of-river","installed_mw_source_vintage":0.2,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":13.8,"low":13.8,"high":13.8,"new_cell":true,"limitation":"[\"Map-reported area, no independent GIS delineation; singleton is a fixed source case.\"]","record_id":"V12-HYDRO-0033"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kiangan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0073","Project / plant":"Ibulao 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Kiangan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Francis, 2 units: 4.6 MW + 3 MW (GUGLER)","Developer / operator":"Kiangan Mini Hydro Corporation","River / basin":"Ibulao River (Kiangan)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S048; V10S049","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S048; V10S049","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":7.6,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kiangan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0074","Project / plant":"Asin-Hungduan Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Kiangan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Francis, 2 x 5 MW (GUGLER)","Developer / operator":"Kiangan Mini Hydro Corporation","River / basin":"Asin River and Hungduan River (combined), powerhouse on Ibulao River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S048; V10S049","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S048; V10S049","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kiangan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0075","Project / plant":"Ibulao Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Lagawe","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Hydrocore Corporation","River / basin":"Ibulao River (tributary of Magat reservoir); powerhouse/site Sitio Bayucan, Brgy Tunggod, Lagawe","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S045","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S01; V10S045","tech_family":"Run-of-river","installed_mw_source_vintage":4.5,"potential_mw_awarded_list":0.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":4.5},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Lagawe","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0076","Project / plant":"Alimit Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Lagawe","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Reservoir / impounding","Turbine technology":"Not established","Developer / operator":"SN Aboitiz Power - Ifugao, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S33","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S33","tech_family":"Reservoir / impounding","installed_mw_source_vintage":null,"potential_mw_awarded_list":120.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":80.0},"S":{"evidence":null},"T":{"evidence":181.0},"U":{"evidence":134.0},"V":{"evidence":47.0},"W":{"evidence":181.0},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":265.0},"AA":{"evidence":6.5148},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":7,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Lagawe","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0077","Project / plant":"Alimit-Pumped Storage Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Lagawe & Mayoyao","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"SN Aboitiz Power - Ifugao, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":250.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Lagawe,Mayoyao","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0078","Project / plant":"Tinoc 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Tinoc","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"QuadRiver Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tinoc","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0079","Project / plant":"Tinoc 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Tinoc","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"QuadRiver Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tinoc","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0080","Project / plant":"Tinoc 3 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Ifugao","Municipality":"Tinoc","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"QuadRiver Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tinoc","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0081","Project / plant":"Gened 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Apayao","Municipality":"Apayao","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Reservoir / impounding","Turbine technology":"Not established","Developer / operator":"Pan Pacific Renewable Power Phils. Corp.","River / basin":"Apayao-Abulug River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S34; V9S06","Record scope":"Awarded contract list, Aug2026","Warnings":"Older feasibility height, not present as-built data. 2023 EIS El110m wording is an elevation and not used as dam height.","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S34; V9S06","tech_family":"Reservoir / impounding","installed_mw_source_vintage":null,"potential_mw_awarded_list":150.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":105.0},"S":{"evidence":null},"T":{"evidence":158.3},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":158.3},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":105.0},"AA":{"evidence":9.36},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":9,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-L-0082","Project / plant":"Calanasan 1 (formerly Aoan) Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Apayao","Municipality":"Calanasan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Pan Pacific Renewable Power Phils. Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":30.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Calanasan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0083","Project / plant":"Calanasan 2 (formerly Calanasan) Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Apayao","Municipality":"Calanasan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Pan Pacific Renewable Power Phils. Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":220.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Calanasan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0084","Project / plant":"Tabayagan Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Apayao","Municipality":"Calanasan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Pan Pacific Renewable Power Phils. Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":50.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Calanasan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0085","Project / plant":"Nabuangan River Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Apayao","Municipality":"Conner","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"San Roque Hydropower Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":10.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Conner","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0086","Project / plant":"Gened 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Apayao","Municipality":"Kabugao","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Reservoir / impounding","Turbine technology":"Francis (vertical; 3 main + 1 auxiliary)","Developer / operator":"Pan Pacific Renewable Power Phils. Corp.","River / basin":"Apayao-Abulug River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":"Prospective design. Not an existing operating facility. Gened2 head is design net; Pakil levels/storage refer ONLY to upper reservoir. Unit conversions explicit in field definitions.","Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S34","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"SITE_APPROXIMATE","Coordinate qualification":"250 MW Gened-2, HSC 2018-02-774; Pan Pacific; Apayao-Abulug River, Kabugao. Table ES-4 PDF p.16 disagrees for both components; selected explicit WGS84 Table 1-3 repeated in Table 1-1; retain conflict in review, not structural verification.","Coordinate source ID":"V6S34","tech_family":"Reservoir / impounding","installed_mw_source_vintage":null,"potential_mw_awarded_list":250.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":94.0},"S":{"evidence":209.0},"T":{"evidence":128.0},"U":{"evidence":76.0},"V":{"evidence":52.0},"W":{"evidence":128.0},"X":{"evidence":202.5},"Y":{"evidence":170.0},"Z":{"evidence":190.0},"AA":{"evidence":4.9},"AB":{"evidence":870.0},"AC":{"evidence":127.0},"AD":{"evidence":null}},"missing_evidence_fields":2,"location":{"kind":"point","status":"SITE_APPROXIMATE","lon":121.128,"lat":18.059}},{"Asset ID":"AG-L-0087","Project / plant":"Madduang Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Apayao","Municipality":"Kabugao","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Pan Pacific Renewable Power Phils. Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":55.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kabugao","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0088","Project / plant":"Sicapo Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Apayao","Municipality":"Kabugao","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Pan Pacific Renewable Power Phils. Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":40.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kabugao","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0089","Project / plant":"Maton Pumped Storage ( formerly Maton Hydroelectric Power Project)","Island":"Luzon","DOE region":"CAR","Province":"Apayao","Municipality":"Pudtol","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"Pan Pacific Renewable Power Phils. Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":2000.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Pudtol","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0091","Project / plant":"Suyo 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Apayao","Municipality":"Suyo","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Satrap Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-L-0092","Project / plant":"Bagulin I Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Apayao","Municipality":"Bagulin","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Green Indigenous Environment Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-L-0093","Project / plant":"Naguilian Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Apayao","Municipality":"Naguilian","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Naguilian Mini-Hydro Electric Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":8.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-L-0094","Project / plant":"Tubao Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Apayao","Municipality":"Tubao","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Tubao Mini Hydro-Electric Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-L-0095","Project / plant":"New Batchelor Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Pangasinan","Municipality":"Natividad","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Shan-Shine Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Natividad","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0096","Project / plant":"Upper Batchelor Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Pangasinan","Municipality":"Natividad","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Shan-Shine Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Natividad","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0097","Project / plant":"ARIIS 2 (NIA Stn 5+437.50) Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Pangasinan","Municipality":"San Manuel","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"C Squared Prime Commodities Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.75,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Manuel","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0098","Project / plant":"ARIIS 3 (NIA Stn 5+898.50) Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Pangasinan","Municipality":"San Manuel","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"C Squared Prime Commodities Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Manuel","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0099","Project / plant":"Butao Irrigation Drop Hydroelectric Power Plant","Island":"Luzon","DOE region":"CAR","Province":"Pangasinan","Municipality":"San Manuel","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Canal / irrigation-drop run-of-river","Turbine technology":"Not established","Developer / operator":"Mindoro Grid Corporation","River / basin":"Agno River via NIA ARIS (Agno River Integrated System) main canal","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S057","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S057","tech_family":"Canal / irrigation drop","installed_mw_source_vintage":1.197,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.2},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":120.668,"lat":16.064}},{"Asset ID":"AG-L-0100","Project / plant":"ARIIS 1 (NIA Station 4+283) Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Pangasinan","Municipality":"San Manuel","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"C Squared Prime Commodities Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.9,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Manuel","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0101","Project / plant":"ARIIS 4 (Stn 4+808) Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Pangasinan","Municipality":"San Manuel","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"C Squared Prime Commodities Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.67,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Manuel","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0102","Project / plant":"ARIS 3 + 611 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Pangasinan","Municipality":"San Manuel","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"PNOC-Renewables Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Manuel","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0103","Project / plant":"Cabalisian Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Pangasinan","Municipality":"San Nicolas","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"KOLENA17 Power Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Nicolas","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0104","Project / plant":"Dipalo Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Pangasinan","Municipality":"San Quintin","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river with diversion weir","Turbine technology":"Pelton, 2 vertical units (Global Hydro Energy GmbH), total 4.15 MW","Developer / operator":"Power Beacon Renewable Solutions, Inc.","River / basin":"Dipalo River (weir high in mountains; tailwater to Dipalo River Park and NIA irrigation facility)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S058; V10S060; V10S059","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S058; V10S060; V10S059","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.15,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Quintin","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0105","Project / plant":"Bulu 3 Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Ilocos Norte","Municipality":"Adams and Pagudpud","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Listrik Technology Resource Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Adams,Pagudpud","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0106","Project / plant":"Tamdagan Hydroelectric Power Project","Island":"Luzon","DOE region":"CAR","Province":"Ilocos Norte","Municipality":"Vintar","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"ZAK Green Energy, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Vintar","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0108","Project / plant":"Tamdagan 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"I","Province":"Ilocos Norte","Municipality":"Vintar","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"ZAK Green Energy, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Vintar","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0109","Project / plant":"Iguig Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Cagayan","Municipality":"Iguig and Peñablanca","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Polaris Power Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":16.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Iguig,Peñablanca","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0110","Project / plant":"Ganano River Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Isabela","Municipality":"Alicia","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Ganano Energy & Environment Electric Cooperative","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":50.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Alicia","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0111","Project / plant":"Ilaguen 3A Hydroelectric Power Project (formerly Ilaguen 3 Hydrolectric Power Project)","Island":"Luzon","DOE region":"II","Province":"Isabela","Municipality":"Echague","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river with limited impoundment","Turbine technology":"Francis (two units)","Developer / operator":"Rio Norte Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"2021 reservoir design 3 MCM at control pool349 masl; no live/dead split located","Water-level / area basis":"Maximum control pool349 masl; dam crest357.2 masl; area29 ha at inundation pool","Mean inflow basis":"25.9 m3/s reconstructed tender-design average using donor records1985-2012, not measured/naturalized series at intake","Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V9S03; V9S04","Record scope":"Awarded contract list, Aug2026","Warnings":"2021 revised / updated filing. Older 2019 PDR differs in weir height, full-supply elevation and catchment units. No installed-capacity change; EIS also contains 19.7 vs 25.7 MW text.; 2021 revised / updated filing. Older 2019 PDR differs in weir height, full-supply elevation and catchment units. No installed-capacity change; EIS also contains 19.7 vs 25.7 MW text.; 2021 revised / updated filing. Older 2019 PDR differs in weir height, full-supply elevation and catchment units. No installed-capacity change; EIS also contains 19.7 vs 25.7 MW text.; 2021 revised / updated filing. Older 2019 PDR differs in weir height, full-supply elevation and catchment units. No installed-capacity change; EIS also contains 19.7 vs 25.7 MW text.; 2021 revised / updated filing. Older 2019 PDR differs in weir height, full-supply elevation and catchment units. No installed-capacity change; EIS also contains 19.7 vs 25.7 MW text.; 2021 revised design; crest 357.2 m is separate; earlier 368/369 m study levels not substituted; Not a measured intake time series; 1985-2012 donor record; sensitivity averages 22.4-28.8 m3/s; source uncertainty retained","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V9S03; V9S04","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":19.7,"dam_crest_elevation_masl":357.2,"fields":{"Q":{"evidence":null},"R":{"evidence":25.2},"S":{"evidence":136.0},"T":{"evidence":3.0},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":349.0},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":0.29},"AB":{"evidence":405.0},"AC":{"evidence":25.9},"AD":{"evidence":null}},"missing_evidence_fields":7,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Echague","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0112","Project / plant":"Abuan 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Isabela","Municipality":"Ilagan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Greenmountain Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":7.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Ilagan City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0113","Project / plant":"Abuan 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Isabela","Municipality":"Ilagan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Greenmountain Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":10.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Ilagan City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0114","Project / plant":"Abuan 3 Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Isabela","Municipality":"Ilagan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Greenmountain Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":7.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Ilagan City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0115","Project / plant":"Abuan 4 Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Isabela","Municipality":"Ilagan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Greenmountain Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Ilagan City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0116","Project / plant":"Bintacan Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Isabela","Municipality":"Ilagan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"King Energy Generation Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.22,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Ilagan City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0117","Project / plant":"Maris Main Canal 1 Hydroelectric Power Plant","Island":"Luzon","DOE region":"II","Province":"Isabela","Municipality":"Ramon","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Canal / irrigation-drop run-of-river","Turbine technology":"Not established","Developer / operator":"SN Aboitiz Power - Magat, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01","tech_family":"Canal / irrigation drop","installed_mw_source_vintage":8.5,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":8.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.93,"lat":16.7}},{"Asset ID":"AG-L-0118","Project / plant":"Magat A Hydroelectric Power Plant","Island":"Luzon","DOE region":"II","Province":"Isabela","Municipality":"Ramon","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"I-Magat Renewable Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Run-of-river","installed_mw_source_vintage":1.3,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Ramon","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0119","Project / plant":"Magat B Hydroelectric Power Plant","Island":"Luzon","DOE region":"II","Province":"Isabela","Municipality":"Ramon","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"I-Magat Renewable Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Run-of-river","installed_mw_source_vintage":1.0,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Ramon","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0121","Project / plant":"Lateral B Hydroelectric Power Plant","Island":"Luzon","DOE region":"II","Province":"Isabela","Municipality":"San Mateo","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Irrigation canal drop (vertical drop at Lateral-B sub-canal of MARIIS; run-of-river type dependent on irrigation releases)","Turbine technology":"Vertical axial-flow turbine x 2 (22.5 kW each, induction generators)","Developer / operator":"National Irrigation Administration","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S067","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S067","tech_family":"Canal / irrigation drop","installed_mw_source_vintage":0.045,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Mateo","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0122","Project / plant":"Tumauini (Upper Cascade) Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Isabela","Municipality":"Tumauini","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Philnew Hydro Power Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":14.45,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tumauini","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0123","Project / plant":"Canili Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Alfonso Castañeda","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"ATDinum Energy, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Alfonso Castaneda","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0124","Project / plant":"Mangayngay -1  Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Alfonso Castañeda","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"United Hydro Power Builders","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.4,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Alfonso Castaneda","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0126","Project / plant":"Denip 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Alfonso Castañeda","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"United Hydro Power Builders","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.88,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Alfonso Castaneda","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0127","Project / plant":"Abaca - 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Alfonso Castañeda","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"United Hydro Power Builders","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.2,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Alfonso Castaneda","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0128","Project / plant":"Casignan 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Alfonso Castañeda","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"United Hydro Power Builders","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":10.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Alfonso Castaneda","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0129","Project / plant":"Matuno 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Ambaguio","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Smith Bell Mini-Hydro Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":11.35,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Ambaguio","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0130","Project / plant":"Matuno 2  Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Ambaguio","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Aurora All Asia Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":15.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Ambaguio","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0131","Project / plant":"Nantiyakan River 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Ambaguio","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Gentwo Vivre Energy Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":7.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Ambaguio","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0132","Project / plant":"Matuno 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Ambaguio","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Smith Bell Mini-Hydro Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":10.49,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Ambaguio","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0133","Project / plant":"Didipio 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Kasibu","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"AT Dinum Company","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.1,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kasibu","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0134","Project / plant":"Edralin Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Kasibu","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"AT Dinum Company","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.9,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kasibu","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0135","Project / plant":"Nantiyakan River 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Kayapa","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Gentwo Vivre Energy Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kayapa","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0136","Project / plant":"Runruno Hydroeletric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Quezon","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Wavenergy Resources, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Quezon","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0137","Project / plant":"Pampang Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Nueva Vizcaya","Municipality":"Santa Fe","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"FDC Renewables Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage | V11 Diversion reservoir total design volume; 2023 proposed design; Jacobs 2021 feasibility basis; 2023 proposed design. Source explicitly reports total volume 24,000 m3; not active/cycling volume. No unsupported area-times-depth calculation. 2023 proposed 33.4 MW design, not as-built. Baseline DOE potential is 26 MW; identity is anchored to the exact HSC, developer, river and component locations, not capacity alone. Extraction is cached full primary-source text; direct PDF unavailable. Structural height is riverbed-to-crest, not foundation-to-crest.","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger | V11 Diversion reservoir design surface area at maximum 5 m depth; absolute level unstated; 2023 proposed design; Jacobs 2021 feasibility basis; Design inundation area 1.09 ha for pond described at maximum depth 5 m. Absolute reference elevation and datum not published in extracted passage. 2023 proposed 33.4 MW design, not as-built. Baseline DOE potential is 26 MW; identity is anchored to the exact HSC, developer, river and component locations, not capacity alone. Extraction is cached full primary-source text; direct PDF unavailable. Structural height is riverbed-to-crest, not foundation-to-crest.","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V11S001","Record scope":"Awarded contract list, Aug2026","Warnings":" | V11 R: REPORTED_DESIGN; 2023 proposed 33.4 MW design, not as-built. Baseline DOE potential is 26 MW; identity is anchored to the exact HSC, developer, river and component locations, not capacity alone. Extraction is cached full primary-source text; direct PDF unavailable. Structural height is riverbed-to-crest, not foundation-to-crest. | V11 S: REPORTED_DESIGN; 2023 proposed 33.4 MW design, not as-built. Baseline DOE potential is 26 MW; identity is anchored to the exact HSC, developer, river and component locations, not capacity alone. Extraction is cached full primary-source text; direct PDF unavailable. Structural height is riverbed-to-crest, not foundation-to-crest. | V11 T: REPORTED_DESIGN; 2023 proposed design. Source explicitly reports total volume 24,000 m3; not active/cycling volume. No unsupported area-times-depth calculation. 2023 proposed 33.4 MW design, not as-built. Baseline DOE potential is 26 MW; identity is anchored to the exact HSC, developer, river and component locations, not capacity alone. Extraction is cached full primary-source text; direct PDF unavailable. Structural height is riverbed-to-crest, not foundation-to-crest. | V11 AA: REPORTED_DESIGN; Design inundation area 1.09 ha for pond described at maximum depth 5 m. Absolute reference elevation and datum not published in extracted passage. 2023 proposed 33.4 MW design, not as-built. Baseline DOE potential is 26 MW; identity is anchored to the exact HSC, developer, river and component locations, not capacity alone. Extraction is cached full primary-source text; direct PDF unavailable. Structural height is riverbed-to-crest, not foundation-to-crest.","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V11S001","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":26.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":5.0},"S":{"evidence":40.0},"T":{"evidence":0.024},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":0.0109},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":10,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Santa Fe","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0139","Project / plant":"Addalam Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Quirino","Municipality":"Aglipay","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Quirino Power Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.6,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Aglipay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0140","Project / plant":"Addalam Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Quirino","Municipality":"Cabarroguis","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Quirino Resources Development Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":14.2,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Cabarroguis","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0141","Project / plant":"Didipio 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Quirino","Municipality":"Kasibu, Nueva Vizcaya & Nagtipunan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Alimit Hydro Corp","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.4,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Nagtipunan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0142","Project / plant":"Dagkan Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Quirino","Municipality":"Nagtipunan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"United Hydro Power Builders Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":125.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Nagtipunan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0144","Project / plant":"Mactol Hydroelectric Power Project","Island":"Luzon","DOE region":"II","Province":"Quirino","Municipality":"Nagtipunan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Rnr Nq Ventures Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Nagtipunan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0145","Project / plant":"Diaman Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Nueva Ecija","Municipality":"Dupax del Sur","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"United Hydro Power Builders","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.54,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-L-0146","Project / plant":"Dupinga Hydroelectric Power Plant","Island":"Luzon","DOE region":"III","Province":"Nueva Ecija","Municipality":"Gabaldon","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Dupinga Mini Hydro Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S002","Record scope":"Awarded contract list, Aug2026","Warnings":"V10 new: Q=4.4 reported historical (V10S002)","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S002","tech_family":"Run-of-river","installed_mw_source_vintage":4.68,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":4.4},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Gabaldon","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0147","Project / plant":"Masiway Hydroelectric Power Plant","Island":"Luzon","DOE region":"III","Province":"Nueva Ecija","Municipality":"Gabaldon","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river with re-regulation pondage","Turbine technology":"Kaplan","Developer / operator":"First Gen Hydro Power Corporation","River / basin":null,"Storage epoch and level basis":"6 MCM compiled reported storage, GDW_ID 6566; survey date unspecified; no dead/live split","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V8S01; V10S003","Record scope":"Awarded contract list, Aug2026","Warnings":"Mixed-vintage compiled inventory; source survey date not specified; validate with First Gen before design work; Mixed-vintage compiled inventory; source survey date not specified; validate with First Gen before design work; Mixed-vintage compiled inventory; source survey date not specified; validate with First Gen before design work | V10 new: AB=869.8 reported historical (V10S003)","Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V8S01; V10S003","tech_family":"Run-of-river","installed_mw_source_vintage":12.0,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":12.0},"R":{"evidence":25.0},"S":{"evidence":430.0},"T":{"evidence":6.0},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":869.8},"AC":{"evidence":null,"planning":{"status":"PROJECT_SPECIFIC_ESTIMATE","base":43.195860044642856,"low":43.195860044642856,"high":44.497,"new_cell":true,"limitation":"[\"Two source boundary cases do not bound model bias.\", \"No current reservoir water balance or naturalization verification.\"]","record_id":"V12-HYDRO-0032"}},"AD":{"evidence":null}},"missing_evidence_fields":9,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.0947,"lat":15.7854}},{"Asset ID":"AG-L-0148","Project / plant":"Aya Pumped Storage Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Nueva Ecija","Municipality":"Gabaldon","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Pumped storage using existing reservoirs","Turbine technology":"Reversible Francis pump-turbines (two 60 MW units)","Developer / operator":"First Gen Hydro Power Corporation","River / basin":null,"Storage epoch and level basis":"2021 daily PSH cycling volume 4 MCM; whole-reservoir live storage is a different quantity","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V8S05","Record scope":"Awarded contract list, Aug2026","Warnings":"Working water cycled daily; not the 2083 MCM active storage of combined Pantabangan-Aya reservoir","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V8S05","tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":120.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":4.0},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Gabaldon","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0149","Project / plant":"Masiway 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Nueva Ecija","Municipality":"Gabaldon","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Gainza Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Gabaldon","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0150","Project / plant":"Casecnan Hydroelectric Power Plant","Island":"Luzon","DOE region":"III","Province":"Nueva Ecija","Municipality":"Gabaldon","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river with impounding capability","Turbine technology":"Francis, 2 x 75 MW (vertical axis), underground powerhouse","Developer / operator":"Fresh River Lakes Corp.","River / basin":"Casecnan River and Taan River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S062","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S062","tech_family":"Reservoir / impounding","installed_mw_source_vintage":165.0,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":150.0},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":40.0,"low":40.0,"high":40.0,"new_cell":true,"limitation":"[\"Contractor reference; as-built description of main (Casecnan) weir. Taan weir = 22 m. Conflicts with press figure of 30 m. | V10 independent review: Casecnan: primary EPC contractor CMC confirms separate Taan 22 m and Casecnan 40 m structures; press record says both 30 m. Do not force two structures or unresolved height definitions into one asset-height cell. Retain primary component dimensions separately; exclude single R fill under requested height-conflict rule.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0159"}},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.1997,"lat":15.8398}},{"Asset ID":"AG-L-0151","Project / plant":"PRISMC Hydroelectric Power Plant","Island":"Luzon","DOE region":"III","Province":"Nueva Ecija","Municipality":"Rizal","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"PNOC-Renewables Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S01","tech_family":"Run-of-river","installed_mw_source_vintage":1.0,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Rizal","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0152","Project / plant":"Talaytay Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Aurora","Municipality":"Dinalungan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"PTC Energy, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.32,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Dinalungan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0153","Project / plant":"Dingalan Pumped-Storage Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Aurora","Municipality":"Dingalan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"San Roque Hydropower Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":500.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Dingalan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0154","Project / plant":"Lingod River Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Aurora","Municipality":"Gabaldon, Nueva Ecija / San Luis","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Lingod Hydro Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Luis","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0155","Project / plant":"Salimbuabo-C1 Hydroelectric Power Projec","Island":"Luzon","DOE region":"III","Province":"Aurora","Municipality":"Maria Aurora","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Upper Casignan Hydro, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Maria Aurora","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0156","Project / plant":"Diteki Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Aurora","Municipality":"San Luis","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"PTC Energy, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.9,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Luis","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0157","Project / plant":"Lamig Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Aurora","Municipality":"San Luis","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Upper Casignan Hydro, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Luis","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0158","Project / plant":"Angat Run-of-River Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Bulacan","Municipality":"Norzagaray","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"San Roque Hydropower Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":10.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Norzagaray","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0161","Project / plant":"Mariveles Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Bataan","Municipality":"Mariveles","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Southeast Asia Renewable Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.6,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Mariveles","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0162","Project / plant":"Bulsa Pumped Storage  Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Tarlac","Municipality":"San Jose","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"San Roque Hydropower Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":100.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Jose","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0163","Project / plant":"Coto 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Zambales","Municipality":"Masinloc","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Coto Hydro Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Masinloc","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0164","Project / plant":"Coto 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Zambales","Municipality":"Masinloc","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Coto Hydro Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Masinloc","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0165","Project / plant":"Coto 3 Hydroelectric Power Project","Island":"Luzon","DOE region":"III","Province":"Zambales","Municipality":"Masinloc","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"AT Dinum Company","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.2,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Masinloc","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0166","Project / plant":"Palakpakin Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-A","Province":"Laguna","Municipality":"Calauan and San Pablo City","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis, 2 x 750 kW (PROC), 900 rpm","Developer / operator":"Philippine Power and Development Company","River / basin":"Palakpakin River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S066","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S066","tech_family":"Run-of-river","installed_mw_source_vintage":1.5,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.3},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.3388,"lat":14.1112}},{"Asset ID":"AG-L-0168","Project / plant":"Kalayaan Pumped Storage Power Plant Phase III Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-A","Province":"Laguna","Municipality":"Lumban","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"Power Sector Asset and Liabilities Management","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":0.0,"potential_mw_awarded_list":360.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Lumban","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0170","Project / plant":"Lagunlan-Llano Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-A","Province":"Laguna","Municipality":"Mabitac, Siniloan, Famy","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"JBD Water Power (JWPI) Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Mabitac,Siniloan,Famy","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0171","Project / plant":"Majayjay Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-A","Province":"Laguna","Municipality":"Majayjay","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river with two intakes","Turbine technology":"Horizontal-shaft Francis (two units, historical design)","Developer / operator":"Majayjay Hydropower Company, Inc.","River / basin":"Balanac River system; intakes on Dalitiwan and Panalaban rivers (2 weirs)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V9S01; V10S066","Record scope":"Awarded contract list, Aug2026","Warnings":"2015 feasibility; two intake catchments remain separate; width 20 m is not automatically crest length","Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V9S01; V10S066","tech_family":"Run-of-river","installed_mw_source_vintage":2.19,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.0},"R":{"evidence":2.5},"S":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":20.0,"low":20.0,"high":20.0,"new_cell":true,"limitation":"[\"Width-to-crest interpretation is a planning hypothesis, no asbuilt drawing. Catchments remain separate; no unsupported14.316km2 sum.\", \"'width of approximately 20 m' interpreted as crest length across river; approximate; per weir | V10 independent review: Majayjay: primary REDC Annual Report 2024 PDF p.37, section 1.1, calls each of two weirs approximately 20 m wide. It does not explicitly establish crest/structural length or orientation. No drawing verified. Keep approximate component descriptions; do not treat width as an exact single-asset S.\", \"Sum of two intake catchments (two weirs); individually 11.640 and 2.676 km2. Plant described as harnessing Balanac River. | V10 independent review: Majayjay: primary REDC Annual Report 2024 PDF p.37, section 1.2, reports Dalitiwan 11.640 km2 and Panalaban 2.676 km2 separately. No catchment boundaries/non-overlap proof establish the sum as a single intake catchment. Exclude 14.316 km2 from AB; keep components separate.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0161"}},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":11.64,"low":11.64,"high":11.64,"new_cell":true,"limitation":"[\"Width-to-crest interpretation is a planning hypothesis, no asbuilt drawing. Catchments remain separate; no unsupported14.316km2 sum.\", \"'width of approximately 20 m' interpreted as crest length across river; approximate; per weir | V10 independent review: Majayjay: primary REDC Annual Report 2024 PDF p.37, section 1.1, calls each of two weirs approximately 20 m wide. It does not explicitly establish crest/structural length or orientation. No drawing verified. Keep approximate component descriptions; do not treat width as an exact single-asset S.\", \"Sum of two intake catchments (two weirs); individually 11.640 and 2.676 km2. Plant described as harnessing Balanac River. | V10 independent review: Majayjay: primary REDC Annual Report 2024 PDF p.37, section 1.2, reports Dalitiwan 11.640 km2 and Panalaban 2.676 km2 separately. No catchment boundaries/non-overlap proof establish the sum as a single intake catchment. Exclude 14.316 km2 from AB; keep components separate.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0162"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":12,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.4667,"lat":14.1333}},{"Asset ID":"AG-L-0172","Project / plant":"Botocan Hydroelectric  Power Plant","Island":"Luzon","DOE region":"IV-A","Province":"Laguna","Municipality":"Majayjay","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Cleanergy 9 Power Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S01","tech_family":"Run-of-river","installed_mw_source_vintage":21.956,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":22.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Majayjay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0173","Project / plant":"Balugbog Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-A","Province":"Laguna","Municipality":"Nagcarlan","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis, 2 x 550 kW (PROC), 900 rpm","Developer / operator":"Philippine Power and Development Company","River / basin":"Talahibing and Liliw rivers","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S066","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S066","tech_family":"Run-of-river","installed_mw_source_vintage":1.1,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.5},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.416,"lat":14.136}},{"Asset ID":"AG-L-0174","Project / plant":"Pakil Pumped Storage Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-A","Province":"Laguna","Municipality":"Pakil","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Pumped storage (open-loop, lake-connected)","Turbine technology":"Reversible pump-turbine (runner family unverified)","Developer / operator":"Ahunan Power Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S35; V10S004","Record scope":"Awarded contract list, Aug2026","Warnings":"V10 new: Q=1200 reported design (V10S004)","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S35; V10S004","tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":1400.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1200.0},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":60.0,"low":60.0,"high":60.0,"new_cell":true,"limitation":"[\"V10 independent review: 2026 storage epoch differs from selected V9 2022 live storage; keep compatible 17.02/14.86/2.16 tuple separate.\", \"V10 independent review: 2026 storage epoch differs from V9 2022 live storage; compatible tuple kept separately.\", \"V10 independent review: 2026 revised Pakil design height conflicts with 2022 oral height; retain separately by epoch.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0051"}},"S":{"evidence":4107.0,"planning":{"status":"WITHHELD_EPOCH_CONFLICT","base":null,"low":null,"high":null,"new_cell":false,"limitation":"Incompatible/unsupported inherited field for selected PAKIL_UPPER_2026; kept in unchanged evidence, withheld in this planning state","record_id":null}},"T":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":17.02,"low":17.02,"high":17.02,"new_cell":true,"limitation":"[\"V10 independent review: 2026 storage epoch differs from selected V9 2022 live storage; keep compatible 17.02/14.86/2.16 tuple separate.\", \"V10 independent review: 2026 storage epoch differs from V9 2022 live storage; compatible tuple kept separately.\", \"V10 independent review: 2026 revised Pakil design height conflicts with 2022 oral height; retain separately by epoch.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0048"}},"U":{"evidence":13.7,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":14.86,"low":14.86,"high":14.86,"new_cell":false,"limitation":"[\"V10 independent review: 2026 storage epoch differs from selected V9 2022 live storage; keep compatible 17.02/14.86/2.16 tuple separate.\", \"V10 independent review: 2026 storage epoch differs from V9 2022 live storage; compatible tuple kept separately.\", \"V10 independent review: 2026 revised Pakil design height conflicts with 2022 oral height; retain separately by epoch.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0049"}},"V":{"evidence":null,"planning":{"status":"DETERMINISTIC","base":2.16,"low":2.16,"high":2.16,"new_cell":true,"limitation":"[\"V10 independent review: 2026 storage epoch differs from selected V9 2022 live storage; keep compatible 17.02/14.86/2.16 tuple separate.\", \"PSH basins remain separate; no whole-project aggregation.\", \"Derived residual2.16 is not an independent observation and cannot independently validate published active14.86.\"]","record_id":"V12-OPERATING-0021"}},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":398.5,"planning":{"status":"WITHHELD_EPOCH_CONFLICT","base":null,"low":null,"high":null,"new_cell":false,"limitation":"Incompatible/unsupported inherited field for selected PAKIL_UPPER_2026; kept in unchanged evidence, withheld in this planning state","record_id":null}},"Z":{"evidence":432.0,"planning":{"status":"WITHHELD_EPOCH_CONFLICT","base":null,"low":null,"high":null,"new_cell":false,"limitation":"Incompatible/unsupported inherited field for selected PAKIL_UPPER_2026; kept in unchanged evidence, withheld in this planning state","record_id":null}},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":9,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Pakil","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0175","Project / plant":"Dambo Pumped Storage Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-A","Province":"Laguna","Municipality":"Pangil","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Pumped storage","Turbine technology":"4 reversible pump-turbine units, underground cavern","Developer / operator":"Belisama Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage | V10 T: upper reservoir gross storage; Addendum to Feasibility Study design; | V10 U: upper reservoir live storage; Addendum to Feasibility Study design; Requirement for 10 h generation 6.55 million m3 (p.63) | V10 V: upper reservoir dead storage (gross minus live); Addendum to Feasibility Study design;","Water-level / area basis":"2018 upper reservoir design area 0.3125 km2; level unspecified | V10 X: upper reservoir maximum reservoir level; Addendum to Feasibility Study design; V10 independent review: Maximum reservoir level 488.0 masl explicitly tabulated in Table 1-23, independently checked. FSL 490 in Table 1-38 remains conflicting and Z is blank. | V10 Y: upper reservoir minimum operating level; Addendum to Feasibility Study design;","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V8S07; V10S005","Record scope":"Awarded contract list, Aug2026","Warnings":"Dambo/Belisama 800 MW project; upper reservoir only; not Laguna Lake surface area | V10 new: R=60 reported design (V10S005); S=1044 reported design (V10S005); T=6.98 reported design (V10S005); U=6.84 reported design (V10S005); V=0.14 calculated from documented inputs (V10S005); X=488 reported design (V10S005); Y=441 reported design (V10S005)","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V8S07; V10S005","tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":800.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":60.0,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":60.0,"low":60.0,"high":60.0,"new_cell":false,"limitation":"[\"This resolves an internal design-table contradiction by hypothesis; not a measured operating level.\", \"Foundation level 430 masl, crest 490 masl\", \"Requirement for 10 h generation 6.55 million m3 (p.63)\", \"Table 1-23 'maximum reservoir level'; consistent with 2.0 m FSL-to-crest freeboard | V10 independent review: FSL derived by subtracting assumed freeboard; Table 1-38 explicitly prints 490 masl, inconsistent with 488. Leave unresolved.\", \"V10 independent review: Maximum reservoir level 488.0 masl explicitly tabulated in Table 1-23, independently checked. FSL 490 in Table 1-38 remains conflicting and Z is blank.\", \"Reference level not stated (presumably FSL); conflicts with 312,500 m2 'upper reservoir' project-area line in ESP\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0065"}},"S":{"evidence":1044.0,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":1044.0,"low":1044.0,"high":1044.0,"new_cell":false,"limitation":"[\"This resolves an internal design-table contradiction by hypothesis; not a measured operating level.\", \"Foundation level 430 masl, crest 490 masl\", \"Requirement for 10 h generation 6.55 million m3 (p.63)\", \"Table 1-23 'maximum reservoir level'; consistent with 2.0 m FSL-to-crest freeboard | V10 independent review: FSL derived by subtracting assumed freeboard; Table 1-38 explicitly prints 490 masl, inconsistent with 488. Leave unresolved.\", \"V10 independent review: Maximum reservoir level 488.0 masl explicitly tabulated in Table 1-23, independently checked. FSL 490 in Table 1-38 remains conflicting and Z is blank.\", \"Reference level not stated (presumably FSL); conflicts with 312,500 m2 'upper reservoir' project-area line in ESP\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0066"}},"T":{"evidence":6.98,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":6.98,"low":6.98,"high":6.98,"new_cell":false,"limitation":"[\"This resolves an internal design-table contradiction by hypothesis; not a measured operating level.\", \"Foundation level 430 masl, crest 490 masl\", \"Requirement for 10 h generation 6.55 million m3 (p.63)\", \"Table 1-23 'maximum reservoir level'; consistent with 2.0 m FSL-to-crest freeboard | V10 independent review: FSL derived by subtracting assumed freeboard; Table 1-38 explicitly prints 490 masl, inconsistent with 488. Leave unresolved.\", \"V10 independent review: Maximum reservoir level 488.0 masl explicitly tabulated in Table 1-23, independently checked. FSL 490 in Table 1-38 remains conflicting and Z is blank.\", \"Reference level not stated (presumably FSL); conflicts with 312,500 m2 'upper reservoir' project-area line in ESP\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0067"}},"U":{"evidence":6.84,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":6.84,"low":6.84,"high":6.84,"new_cell":false,"limitation":"[\"This resolves an internal design-table contradiction by hypothesis; not a measured operating level.\", \"Foundation level 430 masl, crest 490 masl\", \"Requirement for 10 h generation 6.55 million m3 (p.63)\", \"Table 1-23 'maximum reservoir level'; consistent with 2.0 m FSL-to-crest freeboard | V10 independent review: FSL derived by subtracting assumed freeboard; Table 1-38 explicitly prints 490 masl, inconsistent with 488. Leave unresolved.\", \"V10 independent review: Maximum reservoir level 488.0 masl explicitly tabulated in Table 1-23, independently checked. FSL 490 in Table 1-38 remains conflicting and Z is blank.\", \"Reference level not stated (presumably FSL); conflicts with 312,500 m2 'upper reservoir' project-area line in ESP\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0068"}},"V":{"evidence":0.14,"planning":{"status":"DETERMINISTIC","base":0.14,"low":0.14,"high":0.14,"new_cell":false,"limitation":"[\"Component design only.\", \"PSH basins remain separate; no whole-project aggregation.\"]","record_id":"V12-OPERATING-0018"}},"W":{"evidence":null},"X":{"evidence":488.0,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":488.0,"low":488.0,"high":488.0,"new_cell":false,"limitation":"[\"This resolves an internal design-table contradiction by hypothesis; not a measured operating level.\", \"Foundation level 430 masl, crest 490 masl\", \"Requirement for 10 h generation 6.55 million m3 (p.63)\", \"Table 1-23 'maximum reservoir level'; consistent with 2.0 m FSL-to-crest freeboard | V10 independent review: FSL derived by subtracting assumed freeboard; Table 1-38 explicitly prints 490 masl, inconsistent with 488. Leave unresolved.\", \"V10 independent review: Maximum reservoir level 488.0 masl explicitly tabulated in Table 1-23, independently checked. FSL 490 in Table 1-38 remains conflicting and Z is blank.\", \"Reference level not stated (presumably FSL); conflicts with 312,500 m2 'upper reservoir' project-area line in ESP\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0071"}},"Y":{"evidence":441.0,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":441.0,"low":441.0,"high":441.0,"new_cell":false,"limitation":"[\"This resolves an internal design-table contradiction by hypothesis; not a measured operating level.\", \"Foundation level 430 masl, crest 490 masl\", \"Requirement for 10 h generation 6.55 million m3 (p.63)\", \"Table 1-23 'maximum reservoir level'; consistent with 2.0 m FSL-to-crest freeboard | V10 independent review: FSL derived by subtracting assumed freeboard; Table 1-38 explicitly prints 490 masl, inconsistent with 488. Leave unresolved.\", \"V10 independent review: Maximum reservoir level 488.0 masl explicitly tabulated in Table 1-23, independently checked. FSL 490 in Table 1-38 remains conflicting and Z is blank.\", \"Reference level not stated (presumably FSL); conflicts with 312,500 m2 'upper reservoir' project-area line in ESP\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0072"}},"Z":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":488.0,"low":488.0,"high":488.0,"new_cell":true,"limitation":"[\"This resolves an internal design-table contradiction by hypothesis; not a measured operating level.\", \"Foundation level 430 masl, crest 490 masl\", \"Requirement for 10 h generation 6.55 million m3 (p.63)\", \"Table 1-23 'maximum reservoir level'; consistent with 2.0 m FSL-to-crest freeboard | V10 independent review: FSL derived by subtracting assumed freeboard; Table 1-38 explicitly prints 490 masl, inconsistent with 488. Leave unresolved.\", \"V10 independent review: Maximum reservoir level 488.0 masl explicitly tabulated in Table 1-23, independently checked. FSL 490 in Table 1-38 remains conflicting and Z is blank.\", \"Reference level not stated (presumably FSL); conflicts with 312,500 m2 'upper reservoir' project-area line in ESP\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0070"}},"AA":{"evidence":0.3125,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":0.217157,"low":0.217157,"high":0.217157,"new_cell":false,"limitation":"[\"This resolves an internal design-table contradiction by hypothesis; not a measured operating level.\", \"Foundation level 430 masl, crest 490 masl\", \"Requirement for 10 h generation 6.55 million m3 (p.63)\", \"Table 1-23 'maximum reservoir level'; consistent with 2.0 m FSL-to-crest freeboard | V10 independent review: FSL derived by subtracting assumed freeboard; Table 1-38 explicitly prints 490 masl, inconsistent with 488. Leave unresolved.\", \"V10 independent review: Maximum reservoir level 488.0 masl explicitly tabulated in Table 1-23, independently checked. FSL 490 in Table 1-38 remains conflicting and Z is blank.\", \"Reference level not stated (presumably FSL); conflicts with 312,500 m2 'upper reservoir' project-area line in ESP\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0073"}},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":6,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Pangil","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0176","Project / plant":"Calibato Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-A","Province":"Laguna","Municipality":"San Pablo","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis, 1 x 300 kW (Global Hydro Energy turbine, Marelli generator), 900 rpm","Developer / operator":"Philippine Power and Development Company","River / basin":"Inahin River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S066","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S066","tech_family":"Run-of-river","installed_mw_source_vintage":0.3,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.1},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.3772,"lat":14.1042}},{"Asset ID":"AG-L-0177","Project / plant":"Piapi River Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-A","Province":"Quezon","Municipality":"Mauban","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river","Turbine technology":"2 x 1,650 kW (summary says 'Impulse Type' but powerhouse line says 'Francis type' - internally inconsistent)","Developer / operator":"Piapi Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V9S01; V10S066","Record scope":"Awarded contract list, Aug2026","Warnings":"Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage. Same page labels turbine both impulse and Francis; family not adjudicated.; Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage. Same page labels turbine both impulse and Francis; family not adjudicated.; Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage. Same page labels turbine both impulse and Francis; family not adjudicated.","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V9S01; V10S066","tech_family":"Run-of-river","installed_mw_source_vintage":0.0,"potential_mw_awarded_list":4.5,"dam_crest_elevation_masl":201.5,"fields":{"Q":{"evidence":null},"R":{"evidence":2.5},"S":{"evidence":25.0},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":23.81},"AC":{"evidence":null,"planning":{"status":"PROJECT_SPECIFIC_ESTIMATE","base":1.944109589041096,"low":0.9208196721311475,"high":2.811917808219178,"new_cell":true,"limitation":"[\"Chart labels visually digitized; original unrounded data unavailable.\", \"Envelope covers the transcribed source methods, not confidence limits or full interannual variability.\", \"Maapon/Sawaga and unclear overlapping chart labels not transcribed; envelope is not claimed exhaustive of all source methods.\"]","record_id":"V12-HYDRO-0029"}},"AD":{"evidence":null}},"missing_evidence_fields":11,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Mauban","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0178","Project / plant":"Tibag Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-A","Province":"Quezon","Municipality":"Mauban","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis (two 2200 kW units, 2015 design)","Developer / operator":"Tibag Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V9S01","Record scope":"Awarded contract list, Aug2026","Warnings":"Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage.; Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage.; Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage.","Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V9S01","tech_family":"Run-of-river","installed_mw_source_vintage":5.808,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":146.8,"fields":{"Q":{"evidence":5.8},"R":{"evidence":5.0},"S":{"evidence":28.0},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":44.4},"AC":{"evidence":null,"planning":{"status":"PROJECT_SPECIFIC_ESTIMATE","base":3.597698630136986,"low":1.713087431693989,"high":5.232821917808219,"new_cell":true,"limitation":"[\"Chart labels visually digitized; original unrounded data unavailable.\", \"Envelope covers the transcribed source methods, not confidence limits or full interannual variability.\", \"Maapon/Sawaga and unclear overlapping chart labels not transcribed; envelope is not claimed exhaustive of all source methods.\"]","record_id":"V12-HYDRO-0028"}},"AD":{"evidence":null}},"missing_evidence_fields":10,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.6417,"lat":14.4376}},{"Asset ID":"AG-L-0180","Project / plant":"Laguio (Laginbayan) Malaki 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-A","Province":"Quezon","Municipality":"Mauban","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Enervantage Supplier's Co., Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.1,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Mauban","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0181","Project / plant":"Laguio (Laginbayan) Malaki 1 Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-A","Province":"Quezon","Municipality":"Mauban","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Enervantage Supplier's Co., Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S01","tech_family":"Run-of-river","installed_mw_source_vintage":1.6,"potential_mw_awarded_list":0.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.7},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Mauban","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0182","Project / plant":"Labayat River (Upper Cascade) Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-A","Province":"Quezon","Municipality":"Real","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis (three 1000 kW units, 2015 design)","Developer / operator":"Labayat 1 Hdyropower  Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V9S01","Record scope":"Awarded contract list, Aug2026","Warnings":"Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage.; Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage.; Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage.","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S01; V9S01","tech_family":"Run-of-river","installed_mw_source_vintage":3.456,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":188.4,"fields":{"Q":{"evidence":3.5},"R":{"evidence":8.0},"S":{"evidence":80.0},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":37.09},"AC":{"evidence":null,"planning":{"status":"PROJECT_SPECIFIC_ESTIMATE","base":3.1246849315068492,"low":1.3876229508196722,"high":4.399972602739726,"new_cell":true,"limitation":"[\"Chart labels visually digitized; original unrounded data unavailable.\", \"Envelope covers the transcribed source methods, not confidence limits or full interannual variability.\", \"Maapon/Sawaga and unclear overlapping chart labels not transcribed; envelope is not claimed exhaustive of all source methods.\"]","record_id":"V12-HYDRO-0027"}},"AD":{"evidence":null}},"missing_evidence_fields":10,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Real","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0183","Project / plant":"Lower Labayat Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-A","Province":"Quezon","Municipality":"Real","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis (two 700 kW units, 2015 design)","Developer / operator":"BEHMC Lower Labayat Hydropower Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V9S01","Record scope":"Awarded contract list, Aug2026","Warnings":"Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage. Reported Lower Labayat crest 208 m exceeds reported Upper Labayat crest 188.4 m; physical/cascade attribution requires confirmation. Catchment is source-stated 8.53 km2, not inferred cumulative downstream area.; Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage. Reported Lower Labayat crest 208 m exceeds reported Upper Labayat crest 188.4 m; physical/cascade attribution requires confirmation. Catchment is source-stated 8.53 km2, not inferred cumulative downstream area.; Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage. Reported Lower Labayat crest 208 m exceeds reported Upper Labayat crest 188.4 m; physical/cascade attribution requires confirmation. Catchment is source-stated 8.53 km2, not inferred cumulative downstream area.","Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V9S01","tech_family":"Run-of-river","installed_mw_source_vintage":1.4,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":208.0,"fields":{"Q":{"evidence":1.4},"R":{"evidence":5.0},"S":{"evidence":70.0},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":8.53},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":10,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":121.63,"lat":14.5}},{"Asset ID":"AG-L-0184","Project / plant":"Tignoan River (Upper Cascade) Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-A","Province":"Quezon","Municipality":"Real","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river","Turbine technology":"Francis (two 750 kW units, 2015 design)","Developer / operator":"BEHMC Upper Tignoan Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V9S01; V9S02","Record scope":"Awarded contract list, Aug2026","Warnings":"Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage.; Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage.; Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage.","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V9S01; V9S02","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.5,"dam_crest_elevation_masl":129.3,"fields":{"Q":{"evidence":null},"R":{"evidence":10.0},"S":{"evidence":66.0},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":28.32},"AC":{"evidence":null,"planning":{"status":"PROJECT_SPECIFIC_ESTIMATE","base":2.2932876712328767,"low":1.0903005464480875,"high":3.3599178082191776,"new_cell":true,"limitation":"[\"Chart labels visually digitized; original unrounded data unavailable.\", \"Envelope covers the transcribed source methods, not confidence limits or full interannual variability.\", \"Maapon/Sawaga and unclear overlapping chart labels not transcribed; envelope is not claimed exhaustive of all source methods.\"]","record_id":"V12-HYDRO-0030"}},"AD":{"evidence":null}},"missing_evidence_fields":11,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Real","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0185","Project / plant":"Lubayat River Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-A","Province":"Quezon","Municipality":"Real","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Enervantage Supplier's Co., Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Real","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0186","Project / plant":"Real II Seawater  Pumped Storage Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-A","Province":"Quezon","Municipality":"Real","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"Repower Energy Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":320.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Real","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0187","Project / plant":"Wawa Pumped Storage 1 Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-A","Province":"Rizal","Municipality":"Rodriguez","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Pumped storage","Turbine technology":"Variable-speed pumped storage (pump-turbine family unspecified)","Developer / operator":"Olympia Violago Water & Power, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V8S18","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V8S18","tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":600.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":84.0,"low":84.0,"high":84.0,"new_cell":true,"limitation":"[\"6.2MCM is source storage volume with undefined gross/live split; T is a conditional total-storage planning proxy only.\", \"Design for 500 MW (2015 EIS); project re-scoped to 600 MW in 2026 EPRMP - design may have changed | V10 independent review: 2015 500 MW Wawa design differs from awarded 600 MW design; keep historical upper component separate.\", \"Design for 500 MW (2015 EIS); project re-scoped to 600 MW in 2026 EPRMP - design may have changed | V10 independent review: Upper and lower PSH reservoirs and/or redesigned schemes must remain separate components; no component fixed for this asset in target table.\", \"Design for 500 MW (2015 EIS); project re-scoped to 600 MW in 2026 EPRMP - design may have changed; storage type (gross vs live) not stated | V10 independent review: 2015 500 MW Wawa storage cannot silently represent redesigned 600 MW project.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0052"}},"S":{"evidence":null},"T":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":6.2,"low":6.2,"high":6.2,"new_cell":true,"limitation":"[\"6.2MCM is source storage volume with undefined gross/live split; T is a conditional total-storage planning proxy only.\", \"Design for 500 MW (2015 EIS); project re-scoped to 600 MW in 2026 EPRMP - design may have changed | V10 independent review: 2015 500 MW Wawa design differs from awarded 600 MW design; keep historical upper component separate.\", \"Design for 500 MW (2015 EIS); project re-scoped to 600 MW in 2026 EPRMP - design may have changed | V10 independent review: Upper and lower PSH reservoirs and/or redesigned schemes must remain separate components; no component fixed for this asset in target table.\", \"Design for 500 MW (2015 EIS); project re-scoped to 600 MW in 2026 EPRMP - design may have changed; storage type (gross vs live) not stated | V10 independent review: 2015 500 MW Wawa storage cannot silently represent redesigned 600 MW project.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0054"}},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":550.45,"low":550.45,"high":550.45,"new_cell":true,"limitation":"[\"6.2MCM is source storage volume with undefined gross/live split; T is a conditional total-storage planning proxy only.\", \"Design for 500 MW (2015 EIS); project re-scoped to 600 MW in 2026 EPRMP - design may have changed | V10 independent review: 2015 500 MW Wawa design differs from awarded 600 MW design; keep historical upper component separate.\", \"Design for 500 MW (2015 EIS); project re-scoped to 600 MW in 2026 EPRMP - design may have changed | V10 independent review: Upper and lower PSH reservoirs and/or redesigned schemes must remain separate components; no component fixed for this asset in target table.\", \"Design for 500 MW (2015 EIS); project re-scoped to 600 MW in 2026 EPRMP - design may have changed; storage type (gross vs live) not stated | V10 independent review: 2015 500 MW Wawa storage cannot silently represent redesigned 600 MW project.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0053"}},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Rodriguez","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0188","Project / plant":"Bansud Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-B","Province":"Oriental Mindoro","Municipality":"Bansud & Gloria","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Sunwest Water and Electric Co., Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Bansud,Gloria","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0189","Project / plant":"Catuiran Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-B","Province":"Oriental Mindoro","Municipality":"Naujan","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis (two horizontal units)","Developer / operator":"Catuiran Hydropower Corporation","River / basin":"Catuiran River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S37","Record scope":"Awarded contract list, Aug2026; OFF-GRID boundary","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S37","tech_family":"Run-of-river","installed_mw_source_vintage":8.0,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":6.8},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Naujan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0190","Project / plant":"Catuiran 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-B","Province":"Oriental Mindoro","Municipality":"Naujan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"QuadRiver Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.3,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Naujan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0191","Project / plant":"Linao Cawayan (Lower Cascade) Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-B","Province":"Oriental Mindoro","Municipality":"San Teodoro","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Oriental Mindoro Electric Cooperative, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S37","Record scope":"Awarded contract list, Aug2026; OFF-GRID boundary","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S37","tech_family":"Run-of-river","installed_mw_source_vintage":2.175,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":2.1},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Teodoro","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0192","Project / plant":"Linao Cawayan (Upper Cascade) Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-B","Province":"Oriental Mindoro","Municipality":"San Teodoro","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Oriental Mindoro Electric Cooperative, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S37","Record scope":"Awarded contract list, Aug2026; OFF-GRID boundary","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S37","tech_family":"Run-of-river","installed_mw_source_vintage":3.0,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":3.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Teodoro","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0193","Project / plant":"Inabasan Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-B","Province":"Oriental Mindoro","Municipality":"San Teodoro","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Ormin Power, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S37","Record scope":"Awarded contract list, Aug2026; OFF-GRID boundary","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S37","tech_family":"Run-of-river","installed_mw_source_vintage":10.0,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":10.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Teodoro","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0194","Project / plant":"Yango-Inabasan Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-B","Province":"Oriental Mindoro","Municipality":"San Teodoro and Puerto Galera","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Ormin Power, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":10.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Teodoro,Puerto Galera","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0195","Project / plant":"Batang-Batang Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-B","Province":"Palawan","Municipality":"Narra","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Langogan Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Narra","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0196","Project / plant":"Malasgao Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-B","Province":"Palawan","Municipality":"Narra","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"King Energy Generation Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Narra","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0197","Project / plant":"Langogan Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-B","Province":"Palawan","Municipality":"Puerto Princesa","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Langogan Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Puerto Princesa City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0199","Project / plant":"Silum-1 Hydroelectric Power Project","Island":"Luzon","DOE region":"IV-B","Province":"Romblon","Municipality":"Magdiwang and Cajidiocan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Romblon Electric Cooperative, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.52,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Magdiwang,Cajidiocan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0200","Project / plant":"Cantingas Hydroelectric Power Plant","Island":"Luzon","DOE region":"IV-B","Province":"Romblon","Municipality":"San Fernando","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis, 3 x 450 kW (originally 900 kW in 2010, expanded 2015)","Developer / operator":"Cantingas Mini-Hydro Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S37; V10S006","Record scope":"Awarded contract list, Aug2026; OFF-GRID boundary","Warnings":"V10 new: R=2 reported historical (V10S006); S=20 reported historical (V10S006)","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S37; V10S006","tech_family":"Run-of-river","installed_mw_source_vintage":1.35,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.4},"R":{"evidence":2.0},"S":{"evidence":20.0},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":11,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Fernando","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0201","Project / plant":"Barit 1 Hydroelectric Power Plant","Island":"Luzon","DOE region":"V","Province":"Camarines Sur","Municipality":"Buhi","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"People's Energy Services Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S01","tech_family":"Run-of-river","installed_mw_source_vintage":1.8,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.8},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Buhi","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0202","Project / plant":"Rangas Hydroelectric Power Project","Island":"Luzon","DOE region":"V","Province":"Camarines Sur","Municipality":"Goa & Tigaon","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Clean and Green Energy Solutions, Inc. (CNGESI)-Rangas Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.4,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Goa,Tigaon","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0203","Project / plant":"Inarihan Hydroelectric Power Plant","Island":"Luzon","DOE region":"V","Province":"Camarines Sur","Municipality":"Naga","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis, 2 x 850 kW (Zhejiang Jinlun Electromechanic), 1200 rpm","Developer / operator":"Bicol Hydropower Corporation","River / basin":"Inarihan River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01; V10S066","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S01; V10S066","tech_family":"Run-of-river","installed_mw_source_vintage":1.6,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.6},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":123.31,"lat":13.62}},{"Asset ID":"AG-L-0204","Project / plant":"Panicuan Hydroelectric Power Project","Island":"Luzon","DOE region":"V","Province":"Camarines Sur","Municipality":"Presentacion","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Energytech Ventures, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Presentacion","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0205","Project / plant":"Hitoma 1 Hydroelectric Power Plant","Island":"Luzon","DOE region":"V","Province":"Catanduanes","Municipality":"Caramoran","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Sunwest Water and Electric Co., Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S37","Record scope":"Awarded contract list, Aug2026; OFF-GRID boundary","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S37","tech_family":"Run-of-river","installed_mw_source_vintage":1.5,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.4},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Caramoran","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0206","Project / plant":"Solong Hydroelectric Power Plant","Island":"Luzon","DOE region":"V","Province":"Catanduanes","Municipality":"San Miguel","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Sunwest Water and Electric Co., Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S37","Record scope":"Awarded contract list, Aug2026; OFF-GRID boundary","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S37","tech_family":"Run-of-river","installed_mw_source_vintage":2.1,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.9},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Miguel","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0207","Project / plant":"San Miguel River Hydroelectric Power Project","Island":"Luzon","DOE region":"V","Province":"Catanduanes","Municipality":"San Miguel","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"JRKL Asia Pacific Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Miguel","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0208","Project / plant":"San Pascual Hydroelectric Power Project","Island":"Luzon","DOE region":"V","Province":"Camarines Norte","Municipality":"Basud","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Levan Marketing Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Basud","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0209","Project / plant":"Daet Hydroelectric Power Project","Island":"Luzon","DOE region":"V","Province":"Camarines Norte","Municipality":"Daet","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"DLM Konstruct Albay Renewable Joint Venture Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Daet","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0210","Project / plant":"Colasi Hydroelectric Power Project","Island":"Luzon","DOE region":"V","Province":"Camarines Norte","Municipality":"Mercedes","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Colasi Mini Hydro Electric Power Plant Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":1.8,"low":1.8,"high":1.8,"new_cell":true,"limitation":"[\"Planning design requires accepting the old intake/reach; capacity mismatch is material and no scaling by capacity is applied.\", \"Design; later CNC (2005) cites 900 kW capacity | V10 independent review: Colasi: 2003 feasibility is a 640 kW historical scheme, whereas target is 4 MW. Name/location plus poorly OCRed 2005 CNC do not prove same intake/design. Controller excludes probable matches; keep historical study separate. Structural OCR not visually verified in this review.\", \"OCR text from WB txt rendition ('Crest Leligtla' = Crest Length) | V10 independent review: Colasi: probable historical 640 kW scheme is not verified as the target 4 MW intake/design; 17 m crest length comes from OCR not visually checked here. Exclude main-target fill.\", \"Delineated from map at weir El. 280 m | V10 independent review: Colasi: 9.3 km2 at El280 m was visually verified in historical feasibility PDF p.4 (printed 4-1). This proves the 2003 intake catchment only. Primary DOE 2024 inventory identifies a 4 MW target; intake continuity is unverified. Probable match remains excluded.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0024"}},"S":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":17.0,"low":17.0,"high":17.0,"new_cell":true,"limitation":"[\"Planning design requires accepting the old intake/reach; capacity mismatch is material and no scaling by capacity is applied.\", \"Design; later CNC (2005) cites 900 kW capacity | V10 independent review: Colasi: 2003 feasibility is a 640 kW historical scheme, whereas target is 4 MW. Name/location plus poorly OCRed 2005 CNC do not prove same intake/design. Controller excludes probable matches; keep historical study separate. Structural OCR not visually verified in this review.\", \"OCR text from WB txt rendition ('Crest Leligtla' = Crest Length) | V10 independent review: Colasi: probable historical 640 kW scheme is not verified as the target 4 MW intake/design; 17 m crest length comes from OCR not visually checked here. Exclude main-target fill.\", \"Delineated from map at weir El. 280 m | V10 independent review: Colasi: 9.3 km2 at El280 m was visually verified in historical feasibility PDF p.4 (printed 4-1). This proves the 2003 intake catchment only. Primary DOE 2024 inventory identifies a 4 MW target; intake continuity is unverified. Probable match remains excluded.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0025"}},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":9.3,"low":9.3,"high":9.3,"new_cell":true,"limitation":"[\"Planning design requires accepting the old intake/reach; capacity mismatch is material and no scaling by capacity is applied.\", \"Design; later CNC (2005) cites 900 kW capacity | V10 independent review: Colasi: 2003 feasibility is a 640 kW historical scheme, whereas target is 4 MW. Name/location plus poorly OCRed 2005 CNC do not prove same intake/design. Controller excludes probable matches; keep historical study separate. Structural OCR not visually verified in this review.\", \"OCR text from WB txt rendition ('Crest Leligtla' = Crest Length) | V10 independent review: Colasi: probable historical 640 kW scheme is not verified as the target 4 MW intake/design; 17 m crest length comes from OCR not visually checked here. Exclude main-target fill.\", \"Delineated from map at weir El. 280 m | V10 independent review: Colasi: 9.3 km2 at El280 m was visually verified in historical feasibility PDF p.4 (printed 4-1). This proves the 2003 intake catchment only. Primary DOE 2024 inventory identifies a 4 MW target; intake continuity is unverified. Probable match remains excluded.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0026"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Mercedes","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0211","Project / plant":"Tuo River Hydroelectric Power Project","Island":"Luzon","DOE region":"V","Province":"Camarines Norte","Municipality":"San Lorenzo Ruiz","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"DLM Konstruct Albay Renewable Joint Venture Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Lorenzo Ruiz","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0212","Project / plant":"Mananap River Hydroelectric Power Project","Island":"Luzon","DOE region":"V","Province":"Camarines Norte","Municipality":"San Vicente","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Mingeophil Meadowland, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Vicente","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-L-0213","Project / plant":"Cawayan 2 Hydroelectric Power Project","Island":"Luzon","DOE region":"V","Province":"Sorsogon","Municipality":"Sorsogon","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Sunwest Water and Electric Co., Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.99,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-L-0214","Project / plant":"Upper Cawayan (Cawayan 1) Hydroelectric Power Plant","Island":"Luzon","DOE region":"V","Province":"Sorsogon","Municipality":"Sorsogon","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Sunwest Water & Electric Co., Inc. - Sorsogon II Electric Cooperative, Inc. (SUWECO-SORECO II)","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S01","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S01","tech_family":"Run-of-river","installed_mw_source_vintage":0.6,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.4},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-L-0215","Project / plant":"Osiao Hydroelectric Power Project","Island":"Luzon","DOE region":"V","Province":"Sorsogon","Municipality":"Sorsogon City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Sorsogon II Electric Cooperative, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.4,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-V-0001","Project / plant":"Bago 4 Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Negros Occidental","Municipality":"Bago & Murcia","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Alsons Energy Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":11.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Bago City,Murcia","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0002","Project / plant":"Bago 3 Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Negros Occidental","Municipality":"Murcia","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river, single weir, free-flow channel headrace, forebay/head pond","Turbine technology":"Francis, 2 units (34.8 MW total)","Developer / operator":"Alsons Energy Development Corporation","River / basin":"Bago River (weir on Murcia / Don Salvador Benedicto boundary)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":"V10 AC: Mean discharge at intake (mean annual flow, natural); 2024 feasibility/EIS design; Design hydrology; period and derivation method not stated in text (EIS cites hydrological study)","Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S011","Record scope":"Awarded contract list, Aug2026","Warnings":"V10 new: AB=382.3 reported design (V10S011); AC=22 reported design (V10S011)","Coordinate status":"SITE_APPROXIMATE","Coordinate qualification":"Source-era Bago 3 design point, not verified actual structure. Multiple rows belong to one component; do not interpret vertex count as number of structures. Channel P39/P40 and repeated eastings retained as printed; no silent repair. Administrative check: point lies outside matched simplified documented-municipality union. Boundary generalization or source location requires review; coordinate retained as printed, not moved.","Coordinate source ID":"V10S011","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":34.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":236.0,"low":236.0,"high":236.0,"new_cell":true,"limitation":"[\"Design. Location of FSL not specified; natural river water level at intake at mean flow is 191.08 masl (Sec. 2.2.1.2.2) so 236 masl may refer to forebay/head pond, not weir pond | V10 independent review: Full supply level component unclear and conflicts with intake river elevation; unresolved.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0033"}},"AA":{"evidence":null},"AB":{"evidence":382.3},"AC":{"evidence":22.0},"AD":{"evidence":null}},"missing_evidence_fields":12,"location":{"kind":"point","status":"SITE_APPROXIMATE","lon":123.16309,"lat":10.5486}},{"Asset ID":"AG-V-0003","Project / plant":"Lower Himogaan Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Negros Occidental","Municipality":"Sagay City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"LGU of Sagay","River / basin":"Himogaan River; site near Brgy Dian-ay (Escalante City) and Brgys Puey, Maquiling, Baviera (Sagay City)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S091","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S091","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":64.5,"low":64.5,"high":64.5,"new_cell":true,"limitation":"[\"JICA pre-feasibility (map study + reconnaissance) design; not developer's design\", \"Different design capacities are evidence of possible redesign, not a scaling factor.\"]","record_id":"V12-HYDRO-0015"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Sagay City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0004","Project / plant":"Bago 1 Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Negros Occidental","Municipality":"San Carlos City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Alsons Energy Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.6,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Carlos City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0005","Project / plant":"Bago Prosperidad 2 Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Negros Occidental","Municipality":"San Carlos City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Bago River Hydro Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Carlos City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0006","Project / plant":"Initihan Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Negros Occidental","Municipality":"San Carlos City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Bago River Hydro Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Carlos City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0007","Project / plant":"Bago 2 Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Negros Occidental","Municipality":"San Carlos City & Murcia","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Alsons Energy Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":10.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Carlos City,Murcia","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0008","Project / plant":"Malugo Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Negros Occidental","Municipality":"Silay City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river (weir, surge tank, powerhouse); EPCC contractor Oscar Sarmiento Construction (2015)","Turbine technology":"Not established","Developer / operator":"Vivant-Malogo Hydropower, Inc.","River / basin":"Malogo River, Brgy. Kapitan Ramon, Silay City","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S084; V10S085","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S084; V10S085","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Silay City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0009","Project / plant":"Binulug Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Negros Occidental","Municipality":"Sipalay and Candoni Cities","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Almana Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":3.0,"low":3.0,"high":3.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0100"}},"S":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":35.0,"low":35.0,"high":35.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0101"}},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":263.0,"low":263.0,"high":263.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0103"}},"AA":{"evidence":null},"AB":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":51.74,"low":51.74,"high":51.74,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0102"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=City of Sipalay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0010","Project / plant":"Aklan 1 Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Aklan","Municipality":"Libacao","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"QuadRiver Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":15.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Libacao","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0011","Project / plant":"Timbaban Hydroelectric Power Plant","Island":"Visayas","DOE region":"VI","Province":"Aklan","Municipality":"Madalag","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Oriental Energy and Power Generation Corporation","River / basin":"Timbaban River (Madalag River), tributary of Aklan River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S03; V10S075","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S03; V10S075","tech_family":"Run-of-river","installed_mw_source_vintage":18.869,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":18.9},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Madalag","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0012","Project / plant":"Aklan Pumped-Storage Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Aklan","Municipality":"Malay","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"San Roque Hydropower Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":300.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":74.0,"low":74.0,"high":74.0,"new_cell":true,"limitation":"[\"Upper dam on Imbaroto River; foundation level 350 masl\", \"Sufficient for 10 h generation at full capacity\", \"Level not stated (presumably FSL 420)\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0034"}},"S":{"evidence":null},"T":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":5.84,"low":5.84,"high":5.84,"new_cell":true,"limitation":"[\"Upper dam on Imbaroto River; foundation level 350 masl\", \"Sufficient for 10 h generation at full capacity\", \"Level not stated (presumably FSL 420)\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0037"}},"U":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":4.55,"low":4.55,"high":4.55,"new_cell":true,"limitation":"[\"Upper dam on Imbaroto River; foundation level 350 masl\", \"Sufficient for 10 h generation at full capacity\", \"Level not stated (presumably FSL 420)\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0038"}},"V":{"evidence":null,"planning":{"status":"DETERMINISTIC","base":1.29,"low":1.29,"high":1.29,"new_cell":true,"limitation":"[\"Component design only.\", \"PSH basins remain separate; no whole-project aggregation.\"]","record_id":"V12-OPERATING-0020"}},"W":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":5.84,"low":5.84,"high":5.84,"new_cell":true,"limitation":"[\"The source table gives gross and FSL but does not explicitly label W; equality is a planning interpretation.\", \"No storage curve or current/as-built validation; no numerical error bounds.\"]","record_id":"V12-OPERATING-0025"}},"X":{"evidence":null},"Y":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":385.0,"low":385.0,"high":385.0,"new_cell":true,"limitation":"[\"Upper dam on Imbaroto River; foundation level 350 masl\", \"Sufficient for 10 h generation at full capacity\", \"Level not stated (presumably FSL 420)\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0036"}},"Z":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":420.0,"low":420.0,"high":420.0,"new_cell":true,"limitation":"[\"Upper dam on Imbaroto River; foundation level 350 masl\", \"Sufficient for 10 h generation at full capacity\", \"Level not stated (presumably FSL 420)\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0035"}},"AA":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":0.17252,"low":0.17252,"high":0.17252,"new_cell":true,"limitation":"[\"Upper dam on Imbaroto River; foundation level 350 masl\", \"Sufficient for 10 h generation at full capacity\", \"Level not stated (presumably FSL 420)\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0040"}},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Malay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0013","Project / plant":"Igbulo (Bais) Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Iloilo","Municipality":"Igbaras","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river (ROR)","Turbine technology":"Not established","Developer / operator":"Century Peak Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S088","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S088","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":8.1,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Igbaras","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0014","Project / plant":"Villasiga Hydroelectric Power Plant","Island":"Visayas","DOE region":"VI","Province":"Antique","Municipality":"Bugasong","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis (three units)","Developer / operator":"Sunwest Water and Electric Company 2","River / basin":"Paliuan River (Brgy Igsoro, Bugasong, Antique)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S03; V10S069","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S03; V10S069","tech_family":"Run-of-river","installed_mw_source_vintage":8.08,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":6.3},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Bugasong","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0015","Project / plant":"Mambusao  2 Hydroelectric Power Project.","Island":"Visayas","DOE region":"VI","Province":"Capiz","Municipality":"Jamindan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"HS Construction Group Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Jamindan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0016","Project / plant":"Capiz Pumped Storage Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Capiz","Municipality":"Tapaz","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"JBD Water Power (JWPI) Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":250.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Tapaz","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0017","Project / plant":"Panay Pumped Storage Hydroelectric Power Project","Island":"Visayas","DOE region":"VI","Province":"Capiz and Aklan","Municipality":"Libacao and Jamindan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"JBD Water Power (JWPI) Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":250.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Libacao,Jamindan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0018","Project / plant":"Amlan Hydroelectric Power Plant","Island":"Visayas","DOE region":"VII","Province":"Negros Oriental","Municipality":"Amlan","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"2 x 400 kW horizontal-shaft turbine-generators","Developer / operator":"Amlan Hydroelectric Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S03; V10S077","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S03; V10S077","tech_family":"Run-of-river","installed_mw_source_vintage":0.928,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.8},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Amlan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0019","Project / plant":"Anulod Hydroelectric Power Project","Island":"Visayas","DOE region":"VII","Province":"Negros Oriental","Municipality":"Bindoy","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Almanapower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.4,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Bindoy","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0020","Project / plant":"Binalbagan 1 Hydroelectric Power Project","Island":"Visayas","DOE region":"VII","Province":"Negros Oriental","Municipality":"Canlaon City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river (ROR)","Turbine technology":"Not established","Developer / operator":"Almana Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S088","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S088","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.3,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null,"planning":{"status":"PROJECT_SPECIFIC_ESTIMATE","base":216.94,"low":216.94,"high":216.94,"new_cell":true,"limitation":"[\"Actual current intake axis not confirmed; matching basin/municipality does not establish same structure.\", \"This is a conditional siting estimate, not a measured/current awarded-project catchment.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0118"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Canlaon City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0021","Project / plant":"Ilog Hydroelectric Power Project","Island":"Visayas","DOE region":"VII","Province":"Negros Oriental","Municipality":"Mabinay","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"ACEN Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":21.6,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":70.0,"low":70.0,"high":70.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Source HWL115m is below intake water elevation162m; water-level fields are contradictory and remain unset. No normal/max level or normal storage is selected.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0088"}},"S":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":240.0,"low":240.0,"high":240.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Source HWL115m is below intake water elevation162m; water-level fields are contradictory and remain unset. No normal/max level or normal storage is selected.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0089"}},"T":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":699.4,"low":699.4,"high":699.4,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Source HWL115m is below intake water elevation162m; water-level fields are contradictory and remain unset. No normal/max level or normal storage is selected.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0091"}},"U":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":188.5,"low":188.5,"high":188.5,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Source HWL115m is below intake water elevation162m; water-level fields are contradictory and remain unset. No normal/max level or normal storage is selected.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0092"}},"V":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":510.9,"low":510.9,"high":510.9,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Source HWL115m is below intake water elevation162m; water-level fields are contradictory and remain unset. No normal/max level or normal storage is selected.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0093"}},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":887.29,"low":887.29,"high":887.29,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Source HWL115m is below intake water elevation162m; water-level fields are contradictory and remain unset. No normal/max level or normal storage is selected.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0090"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Mabinay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0022","Project / plant":"Ilog River - Mabinay Hydroelectric Power Project","Island":"Visayas","DOE region":"VII","Province":"Negros Oriental","Municipality":"Mabinay","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Almana Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":21.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Mabinay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0023","Project / plant":"Canaway 1 Hydroelectric Power Project","Island":"Visayas","DOE region":"VII","Province":"Negros Oriental","Municipality":"Siaton","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Orbysy Holdings, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.6,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Siaton","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0024","Project / plant":"Canaway 2 Hydroelectric Power Project","Island":"Visayas","DOE region":"VII","Province":"Negros Oriental","Municipality":"Siaton","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Orbysy Holdings, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.4,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":3.0,"low":3.0,"high":3.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0104"}},"S":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":45.0,"low":45.0,"high":45.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0105"}},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":268.0,"low":268.0,"high":268.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0107"}},"AA":{"evidence":null},"AB":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":33.14,"low":33.14,"high":33.14,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0106"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Siaton","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0025","Project / plant":"Balamban Hydroelectric Power Project","Island":"Visayas","DOE region":"VII","Province":"Cebu","Municipality":"Cebu City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Hydropower integrated with bulk water supply: water from Guinabasan River (Asturias) transferred to a storage weir on Balamban River; HEPP upstream of water treatment plant (gravity feed)","Turbine technology":"Not established","Developer / operator":"JBD Water Power (JWPI) Inc.","River / basin":"Balamban River (storage weir) fed by transfer from Guinabasan River (Asturias)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S090","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S090","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":10.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-V-0026","Project / plant":"Malubog Pumped Storage Hydroelectric Power Project","Island":"Visayas","DOE region":"VII","Province":"Cebu","Municipality":"Toledo City","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Pumped storage","Turbine technology":"Not established","Developer / operator":"MGEN Renewable Energy, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Pumped storage","installed_mw_source_vintage":null,"potential_mw_awarded_list":250.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Toledo City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0027","Project / plant":"Batuan Hydroelectric Power Project","Island":"Visayas","DOE region":"VII","Province":"Bohol","Municipality":"Batuan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Geohydro Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.68,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Batuan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0028","Project / plant":"Loboc Hydroelectric Power Plant","Island":"Visayas","DOE region":"VII","Province":"Bohol","Municipality":"Loboc","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Sta. Clara Power Corp.","River / basin":"Loboc River (Loboc watershed main trunk)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S03; V10S081","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S03; V10S081","tech_family":"Run-of-river","installed_mw_source_vintage":1.2,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.2},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":123.8358,"lat":9.6748}},{"Asset ID":"AG-V-0029","Project / plant":"Loboc 2 Hydroelectric Power Plant","Island":"Visayas","DOE region":"VII","Province":"Bohol","Municipality":"Loboc","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Sta. Clara Power Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S03","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S03","tech_family":"Run-of-river","installed_mw_source_vintage":1.2,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Loboc","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0030","Project / plant":"BOHECO 1 Sevilla Hydroelectric Power Plant (formerly Sevilla Hydroelectric Power Plant)","Island":"Visayas","DOE region":"VII","Province":"Bohol","Municipality":"Sevilla","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Kaplan, 2 vertical units (Strojirny Brno / CREA consortium); max turbine output 1,729 kW as stated; runner dia 1,570 mm, 300 rpm","Developer / operator":"BOHECO 1 Sevilla Mini Hydro Corp","River / basin":"Loboc River (about 5 km upstream of Loboc town)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S03; V10S079","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S03; V10S079","tech_family":"Run-of-river","installed_mw_source_vintage":2.73,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":2.5},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Sevilla","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0031","Project / plant":"Bayongan Diversion Chute Hydroelectric Power Project","Island":"Visayas","DOE region":"VII","Province":"Bohol","Municipality":"Ubay","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Bohol II Electric Cooperative, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.35,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Ubay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0032","Project / plant":"Marabang Hydroelectric Power Project","Island":"Visayas","DOE region":"VIII","Province":"Leyte","Municipality":"Burauen","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Energy & Building Applications Technologies Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Burauen","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0033","Project / plant":"Binahaan Hydroelectric Power Project","Island":"Visayas","DOE region":"VIII","Province":"Leyte","Municipality":"Jaro","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river (ROR)","Turbine technology":"Not established","Developer / operator":"Dumduma Bacoy Power Corporation","River / basin":"Binahaan River (project name; 2020 DOE list also had a separate 'Binaha-an River HEPP' 2.2 MW, Jaro & Pastrana, EDCOP)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S088; V10S089","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S088; V10S089","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.75,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Jaro","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0034","Project / plant":"Bao Hydroelectric Power Project","Island":"Visayas","DOE region":"VIII","Province":"Leyte","Municipality":"Kananga","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river (ROR), embedded plant","Turbine technology":"Not established","Developer / operator":"Leyte V Electric Cooperative, Inc (LEYECO V)","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S088","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S088","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kananga","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0035","Project / plant":"Mapuyo Hydroelectric Power Project","Island":"Visayas","DOE region":"VIII","Province":"Biliran","Municipality":"Kawayan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Czech-Philippine Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.2,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kawayan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0036","Project / plant":"Amanjuray Hydroelectrci Power Plant","Island":"Visayas","DOE region":"VIII","Province":"Eastern Samar","Municipality":"Lawaan","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river; built 1988-1991 by NEA (UK grant), rehabilitated 2021-2023, re-inaugurated 20 Feb 2024 and grid-synchronized (embedded)","Turbine technology":"Not established","Developer / operator":"ESAMELCO Renew Energy Corporation","River / basin":"Amanjuray Falls / Bolusao River watershed","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S087","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S087","tech_family":"Run-of-river","installed_mw_source_vintage":1.0,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Lawaan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0037","Project / plant":"Maslog Hydroelectric Power Project","Island":"Visayas","DOE region":"VIII","Province":"Eastern Samar","Municipality":"Maslog","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Iraya Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":40.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Maslog","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0038","Project / plant":"Upper Maslog Hydroelectric Power Project","Island":"Visayas","DOE region":"VIII","Province":"Eastern Samar","Municipality":"Maslog","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Taft Hydroenergy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Maslog","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0039","Project / plant":"Casapa River Hydroelectric Power Project","Island":"Visayas","DOE region":"VIII","Province":"Eastern Samar","Municipality":"Maslog","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"ReliantHydro Power Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":10.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Maslog","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0040","Project / plant":"Lower Buhid Hydroelectric Power Project","Island":"Visayas","DOE region":"VIII","Province":"Eastern Samar","Municipality":"Maydolong","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Buhid Hydroenergy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":22.56,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":7.0,"low":7.0,"high":7.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0112"}},"S":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":10.0,"low":10.0,"high":10.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0113"}},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":139.0,"low":139.0,"high":139.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0115"}},"AA":{"evidence":null},"AB":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":160.77,"low":160.77,"high":160.77,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0114"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Maydolong","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0041","Project / plant":"Upper Taft Hydroelectric Power Plant","Island":"Visayas","DOE region":"VIII","Province":"Eastern Samar","Municipality":"Taft","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Iraya Ventures, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S03","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S03","tech_family":"Run-of-river","installed_mw_source_vintage":14.16,"potential_mw_awarded_list":0.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":13.8},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Taft","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0042","Project / plant":"Tubig Hydroelectric Power Plant","Island":"Visayas","DOE region":"VIII","Province":"Eastern Samar","Municipality":"Taft, Eastern Samar","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis, 3 units (Global Hydro Energy); 5.31 MW each per Magis (news quotes 3 x 5.9 MW)","Developer / operator":"Taft Hydroenergy Corporation","River / basin":"Tubig (Taft-Tubig) River, within Samar Island Natural Park","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S03; V10S071","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S03; V10S071","tech_family":"Run-of-river","installed_mw_source_vintage":15.93,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":15.9},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":10.0,"low":10.0,"high":10.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0108"}},"S":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":93.0,"low":93.0,"high":93.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0109"}},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":120.0,"low":120.0,"high":120.0,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0111"}},"AA":{"evidence":null},"AB":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":126.86,"low":126.86,"high":126.86,"new_cell":true,"limitation":"[\"Philippines, March2012 reconnaissance/preliminary design. No automatic join to current awarded asset. Names alone do not establish same project; capacity/site can differ.\", \"These are conditional adopted reconnaissance designs; no present-project specification is inferred.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0110"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Taft","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0043","Project / plant":"Hinabian Hydroelectric Power Plant","Island":"Visayas","DOE region":"VIII","Province":"Southern Leyte","Municipality":"St. Bernard","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Southern Leyte Electric Cooperative, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":0.81,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-V-0044","Project / plant":"Pilar Hydroelectric Power Project","Island":"Visayas","DOE region":"VIII","Province":"Western Samar","Municipality":"Calbayog City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Edged Sustainable Energy","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.15,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Calbayog City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0045","Project / plant":"Calbiga Hydroelectric Power Project","Island":"Visayas","DOE region":"VIII","Province":"Western Samar","Municipality":"Calbiga & Pinabacdao","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Meadowland Developers, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":15.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Calbiga,Pinabacdao","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-V-0046","Project / plant":"Mawo Hydroelectric Power Project","Island":"Visayas","DOE region":"VIII","Province":"Northern Samar","Municipality":"San Isidro","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Energy & Building Applications Technologies Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.18,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Isidro","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0001","Project / plant":"Salug-Daku 2 Hydroelectric Power Project","Island":"Mindanao","DOE region":"IX","Province":"Zamboanga del Norte","Municipality":"Sergio Osmeña Sr.","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Clean and Green Energy Solutions, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.2,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Sergio Osmeña Sr.","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0003","Project / plant":"Mat-I 1 Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Claveria","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Philnew Hydro Power Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.85,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Claveria","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0004","Project / plant":"Odiongan (Lower Cascade) Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Gingoog City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Oriental Energy and Power Generation Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Gingoog City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0005","Project / plant":"Odiongan (Middle Cascade) Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Gingoog City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Oriental Energy and Power Generation Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":10.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Gingoog City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0006","Project / plant":"Odiongan (Upper Cascade) Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Gingoog City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Oriental Energy and Power Generation Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Gingoog City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0007","Project / plant":"Gingoog (Upper Cascade) Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Gingoog City","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"WDM Power Generation Inc..","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Gingoog City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0008","Project / plant":"Cabulig II Hydroelectric Power Project (formerly Lower Cabulig HPP)","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Jasaan and Claveria","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Minergy Renewable Ventures, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":0.0,"potential_mw_awarded_list":9.3,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Jasaan,Claveria","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0009","Project / plant":"Bubunawan Hydroelectric Power Plant","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Jasaan and Claveria","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Bubunawan Power Company, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02","tech_family":"Run-of-river","installed_mw_source_vintage":6.57,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":6.5},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Jasaan,Claveria","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0010","Project / plant":"Pualas Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Jasaan and Claveria","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"JE Hydropower Ventures Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":0.2,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Jasaan,Claveria","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0011","Project / plant":"Maladugao Site 1 Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Bumbaran, Lanao del Sur/Kalilangan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Euro Hydro Power (Asia) Holdings, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":11.65,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-M-0012","Project / plant":"South Pulangi Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Damulog","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Reservoir / impounding (planned)","Turbine technology":"3 x 87.18 MW turbines (model HL()-LJ-340, Francis), 3 x 85 MW generators","Developer / operator":"Pulangi Hydro Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage | V10 U: regulation (live) capacity; original FS design; hydrology series as stated; | V10 V: dead capacity; original FS design; hydrology series as stated; p.27 also states dead storage 495 million m3 for sediment","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":"V10 AC: mean annual discharge at dam site; original FS design; hydrology series as stated; Mean annual runoff 4.86 billion m3; series length printed as 466 years (likely 46.6 or typo); drainage area 3,930 km2","Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V7S13; V10S007; V10S017","Record scope":"Awarded contract list, Aug2026","Warnings":"V10 new: U=674.7 reported design (V10S007); V=494.6 reported design (V10S007); AC=154 reported design (V10S007)","Coordinate status":"SITE_APPROXIMATE","Coordinate qualification":"July 2019 cover; URL uploaded August 2019. Proposed Pulangi River dam, Barangay Tangkulan, Damulog, Bukidnon. Baseline province Misamis Oriental conflicts with source Bukidnon. Not Pulangi IV. CRS not specified in Table 1-1. WGS84 attribution relies on linked project map, not a datum label in the table.","Coordinate source ID":"V10S007","tech_family":"Reservoir / impounding","installed_mw_source_vintage":null,"potential_mw_awarded_list":250.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":143.1},"S":{"evidence":878.5},"T":{"evidence":1169.3},"U":{"evidence":674.7},"V":{"evidence":494.6},"W":{"evidence":1169.3},"X":{"evidence":null},"Y":{"evidence":135.0},"Z":{"evidence":165.0},"AA":{"evidence":29.24},"AB":{"evidence":3930.0},"AC":{"evidence":154.0},"AD":{"evidence":null}},"missing_evidence_fields":3,"location":{"kind":"point","status":"SITE_APPROXIMATE","lon":125.03832,"lat":7.4269}},{"Asset ID":"AG-M-0013","Project / plant":"Gakaon Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Impasugong","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Impasug-ong Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.23,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-M-0014","Project / plant":"Panoon Hydroelectric Power Plant","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Impasugong","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Gerphil Renewable Energy, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02","tech_family":"Run-of-river","installed_mw_source_vintage":0.226,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.2},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-M-0015","Project / plant":"Atugan 4 Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Impasugong","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Mindanao Energy Systems, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-M-0016","Project / plant":"Calabugao Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Impasugong","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Euro Hydro Power (Asia) Holdings, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-M-0017","Project / plant":"Upper Atugan Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Impasugong","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Mindanao Energy Systems, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.4,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-M-0018","Project / plant":"Dumalaguing Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Oriental","Municipality":"Impasugong","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Metalite Builders Development Company, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-M-0019","Project / plant":"Atugan 3 Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Impasugong","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Metalite Builders Development Company, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Impasug-Ong","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0020","Project / plant":"Maladugao River (Lower Cascade) Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Kalilangan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Bukidnon Maladugao Hydro Power Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":15.7,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kalilangan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0021","Project / plant":"Maladugao River (Upper Cascade) Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Kalilangan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Investco BHPI Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.95,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kalilangan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0022","Project / plant":"Canituan Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Kalilangan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Oro Valle Energy (OVEI) Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.2,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Kalilangan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0023","Project / plant":"Sawaga 1 Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Malaybalay City","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"QuadRiver Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=City of Malaybalay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0024","Project / plant":"Malitbog Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Malitbog","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Philnewriver Power Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.44,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Malitbog","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0025","Project / plant":"Silo-o Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Malitbog","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Philnewriver Power Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.44,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Malitbog","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0026","Project / plant":"Agusan River Hydroelectric Power Plant","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Manolo Fortich","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river with pondage","Turbine technology":"Francis (horizontal shaft)","Developer / operator":"FG Bukidnon Power Corporation","River / basin":"Agusan River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V6S13; V10S008","Record scope":"Awarded contract list, Aug2026","Warnings":"V10 new: R=1 reported historical (V10S008); S=22 reported historical (V10S008); AB=25 reported historical (V10S008)","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02; V6S13; V10S008","tech_family":"Run-of-river","installed_mw_source_vintage":1.6,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.6},"R":{"evidence":1.0},"S":{"evidence":22.0},"T":{"evidence":0.04},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":0.0283},"AB":{"evidence":25.0},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":8,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Manolo Fortich","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0027","Project / plant":"Culaman Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Manolo Fortich","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Oriental Energy and Power Generation Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":10.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Manolo Fortich","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0028","Project / plant":"Mangima Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Manolo Fortich","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river: diversion weir with intake and spillway, desander, headrace, surge tank, penstock","Turbine technology":"Not established","Developer / operator":"Mangima Hydro Power Corporation","River / basin":"Mangima River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S097","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S097","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":12.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Manolo Fortich","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0029","Project / plant":"Manolo Fortich 2 Hydroelectric Power Plant","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Manolo Fortich","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis (four units)","Developer / operator":"Hedcor Bukidnon, Inc.","River / basin":"Amusig, Guihean and Tanaon rivers","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02","tech_family":"Run-of-river","installed_mw_source_vintage":27.387,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":25.4},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Manolo Fortich","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0030","Project / plant":"Manolo Fortich 1 Hydroelectric Power Plant","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Manolo Fortich and Impasug-ong","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Pelton + Francis (separate head groups)","Developer / operator":"Hedcor Bukidnon, Inc.","River / basin":"Amusig, Guihean and Tanaon rivers","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02","tech_family":"Run-of-river","installed_mw_source_vintage":45.936,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":43.4},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":6.8,"low":6.8,"high":6.8,"new_cell":true,"limitation":"[\"Exact intake identity unknown; use only if model explicitly accepts one representative headworks.\", \"Contractor portfolio; which intake weir is described is not stated; exa cached text. Intake not identified\", \"Contractor portfolio; which intake weir is described is not stated; exa cached text. Intake not identified\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0031"}},"S":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":40.0,"low":40.0,"high":40.0,"new_cell":true,"limitation":"[\"Exact intake identity unknown; use only if model explicitly accepts one representative headworks.\", \"Contractor portfolio; which intake weir is described is not stated; exa cached text. Intake not identified\", \"Contractor portfolio; which intake weir is described is not stated; exa cached text. Intake not identified\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0032"}},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Manolo Fortich,Impasug-Ong","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0031","Project / plant":"Maramag Hydroelectric Power Plant","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Maramag","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Maramag Mini-Hydro Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02","tech_family":"Run-of-river","installed_mw_source_vintage":2.04,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":2.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Maramag","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0032","Project / plant":"Talakag 3 Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Talakag","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Markham Resources Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":8.2,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Talakag","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0033","Project / plant":"Talakag 1  Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Talakag","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"FD Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":10.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Talakag","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0034","Project / plant":"San Isidro Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Talakag and Cagayan de Oro City","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"FGEN San Isidro Hydro Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"SITE_APPROXIMATE","Coordinate qualification":"GHD 2022 Draft C, FGEN San Isidro Hydro Power Corporation, HSC 2016-06-659, Cagayan de Oro River, 39 MW. Historical design only; V10 evidence flags later redesign. Tunnel point 1 is labelled From intake, not independently the intake itself.","Coordinate source ID":"V10S139","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":39.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":17.5,"low":17.5,"high":17.5,"new_cell":true,"limitation":"[\"Source U1.5 conflicts with A_top0.2 and4m drawdown: required mean active area0.375km2 exceeds top area. Source value retained as CONFLICT in inputs/review.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Table 1.5 prints 'Maximum height above foundation | 7.5 m' (likely truncation); text and fact sheet say 17.5 m\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Approximate\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Between 212 and 216 masl presumably\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Riverbed ~120 m wide at site\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0001"}},"S":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":120.0,"low":120.0,"high":120.0,"new_cell":true,"limitation":"[\"Source U1.5 conflicts with A_top0.2 and4m drawdown: required mean active area0.375km2 exceeds top area. Source value retained as CONFLICT in inputs/review.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Table 1.5 prints 'Maximum height above foundation | 7.5 m' (likely truncation); text and fact sheet say 17.5 m\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Approximate\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Between 212 and 216 masl presumably\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Riverbed ~120 m wide at site\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0006"}},"T":{"evidence":null},"U":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":0.8,"low":0.8,"high":0.8,"new_cell":true,"limitation":"[\"Source U1.5 conflicts with A_top0.2 and4m drawdown: required mean active area0.375km2 exceeds top area. Source value retained as CONFLICT in inputs/review.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Table 1.5 prints 'Maximum height above foundation | 7.5 m' (likely truncation); text and fact sheet say 17.5 m\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Approximate\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Between 212 and 216 masl presumably\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Riverbed ~120 m wide at site\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0005"}},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":212.0,"low":212.0,"high":212.0,"new_cell":true,"limitation":"[\"Source U1.5 conflicts with A_top0.2 and4m drawdown: required mean active area0.375km2 exceeds top area. Source value retained as CONFLICT in inputs/review.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Table 1.5 prints 'Maximum height above foundation | 7.5 m' (likely truncation); text and fact sheet say 17.5 m\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Approximate\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Between 212 and 216 masl presumably\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Riverbed ~120 m wide at site\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0003"}},"Z":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":216.0,"low":216.0,"high":216.0,"new_cell":true,"limitation":"[\"Source U1.5 conflicts with A_top0.2 and4m drawdown: required mean active area0.375km2 exceeds top area. Source value retained as CONFLICT in inputs/review.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Table 1.5 prints 'Maximum height above foundation | 7.5 m' (likely truncation); text and fact sheet say 17.5 m\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Approximate\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Between 212 and 216 masl presumably\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Riverbed ~120 m wide at site\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0002"}},"AA":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":0.2,"low":0.2,"high":0.2,"new_cell":true,"limitation":"[\"Source U1.5 conflicts with A_top0.2 and4m drawdown: required mean active area0.375km2 exceeds top area. Source value retained as CONFLICT in inputs/review.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Table 1.5 prints 'Maximum height above foundation | 7.5 m' (likely truncation); text and fact sheet say 17.5 m\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Approximate\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Between 212 and 216 masl presumably\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Riverbed ~120 m wide at site\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0004"}},"AB":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":573.0,"low":573.0,"high":573.0,"new_cell":true,"limitation":"[\"Source U1.5 conflicts with A_top0.2 and4m drawdown: required mean active area0.375km2 exceeds top area. Source value retained as CONFLICT in inputs/review.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Table 1.5 prints 'Maximum height above foundation | 7.5 m' (likely truncation); text and fact sheet say 17.5 m\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Approximate\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Between 212 and 216 masl presumably\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers. Riverbed ~120 m wide at site\", \"Draft EIS design; project redesigned per First Gen Nov 2025 news; exa cached text (first ~150k chars), no page numbers.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0007"}},"AC":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":42.31,"low":42.31,"high":42.32,"new_cell":true,"limitation":"[\"Draft EIS; exa search-highlight text only (file not fully fetched); page 2-101 noted in footer. Period 2015-2019, DPWH Cabula Bridge daily flows (gap-filled by rainfall-runoff) transposed by drainage-area ratio; elsewhere 42.32 m3/s\", \"Range represents source rounding variants only; hydrologic predictive error is unbounded.\"]","record_id":"V12-HYDRO-0023"}},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"point","status":"SITE_APPROXIMATE","lon":124.59038,"lat":8.28731}},{"Asset ID":"AG-M-0035","Project / plant":"Upper Manupali Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Valencia","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Upper Manupali Hydroelectric Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.6,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=City of Valencia","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0036","Project / plant":"Pulanai River Hydroelectric Power Plant","Island":"Mindanao","DOE region":"X","Province":"Bukidnon","Municipality":"Valencia","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Francis (three units, historical 10.6 MW design)","Developer / operator":"Cabanglasan Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V9S01; V10S009","Record scope":"Awarded contract list, Aug2026","Warnings":"Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage. Pulanai same filing gives 20 m narrative height and 25 m cost-table height; both retained as candidates, preferred height remains blank.; Historical design, not verified as-built survey. Match by project and issuer; operating capacity and status remain at original inventory vintage. Pulanai same filing gives 20 m narrative height and 25 m cost-table height; both retained as candidates, preferred height remains blank. | V10 new: Q=18 reported historical (V10S009)","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V9S01; V10S009","tech_family":"Run-of-river","installed_mw_source_vintage":18.2,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":350.0,"fields":{"Q":{"evidence":18.0},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":20.0,"low":20.0,"high":25.0,"new_cell":true,"limitation":"[\"2015 FS design for 10.6 MW; plant later built at 18.2 MW, as-built dimensions not verified. Cost estimate in same FS (p.79) states Weir Height = 25 mtrs\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0029"}},"S":{"evidence":90.0},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":1319.85},"AC":{"evidence":null,"planning":{"status":"PROJECT_SPECIFIC_ESTIMATE","base":79.90079452054795,"low":44.258469945355195,"high":79.9133606557377,"new_cell":true,"limitation":"[\"Chart labels visually digitized; original unrounded data unavailable.\", \"Envelope covers the transcribed source methods, not confidence limits or full interannual variability.\", \"Maapon/Sawaga and unclear overlapping chart labels not transcribed; envelope is not claimed exhaustive of all source methods.\"]","record_id":"V12-HYDRO-0031"}},"AD":{"evidence":null}},"missing_evidence_fields":11,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=City of Valencia","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0037","Project / plant":"Sulipat Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Occidental","Municipality":"Calamba","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"King Energy Generation Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.25,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Calamba","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0038","Project / plant":"Clarin Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Occidental","Municipality":"Clarin","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Philnew Hydro Power Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.9,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Clarin","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0039","Project / plant":"Palilan Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Misamis Occidental","Municipality":"Jimenez","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"King Energy Generation Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Jimenez","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0040","Project / plant":"Liangan Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Lanao del Norte","Municipality":"Bacolod","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Existing 2 x 5.95 MW; proposed 3 x 5.95 MW; 720 rpm; rated head 120 m; rated flow 5.59 m3/s per unit (ANDRITZ supplied per ANDRITZ Hydro News)","Developer / operator":"Liangan Power Corporation","River / basin":"Liangan River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V10S010","Record scope":"Awarded contract list, Aug2026","Warnings":"V10 new: AB=200 reported design (V10S010)","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02; V10S010","tech_family":"Run-of-river","installed_mw_source_vintage":12.0,"potential_mw_awarded_list":6.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":12.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":200.0},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":12,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Bacolod","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0041","Project / plant":"Bacolod Hydrolectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Lanao del Norte","Municipality":"Bacolod","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Bacolod Hydro Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.96,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Bacolod","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0042","Project / plant":"Dimarao Hydrolectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Lanao del Norte","Municipality":"Bacolod","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Pagayawan Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.14,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Bacolod","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0043","Project / plant":"Bayug Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Lanao del Norte","Municipality":"Iligan City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Euro Hydro Power (Asia) Holdings, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":17.81,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Iligan City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0044","Project / plant":"Bulanog-Batang Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Lanao del Norte","Municipality":"Iligan City","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Bukidnon Hydro Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S096","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S096","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":33.9,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Iligan City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0045","Project / plant":"Titunod Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Lanao del Norte","Municipality":"Kolambogan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river","Turbine technology":"Horizontal-axis Francis, 3 x 1,200 kW","Developer / operator":"Euro Hydro Power (Asia) Holdings, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V10S102","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V10S102","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.92,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-M-0046","Project / plant":"Upper Bulanog Hydroelectric Power Project","Island":"Mindanao","DOE region":"X","Province":"Bukidnon ","Municipality":"Talakag ","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"FD Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":7.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Talakag","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0047","Project / plant":"Talomo 1 Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XI","Province":"Davao del Sur","Municipality":"Davao City","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Hedcor, Inc.","River / basin":"Talomo River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V10S023","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S02; V10S023","tech_family":"Run-of-river","installed_mw_source_vintage":1.0,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":125.48,"lat":7.1924}},{"Asset ID":"AG-M-0048","Project / plant":"Talomo 2 Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XI","Province":"Davao del Sur","Municipality":"Davao City","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Hedcor, Inc.","River / basin":"Talomo River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V10S023","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S02; V10S023","tech_family":"Run-of-river","installed_mw_source_vintage":0.6,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.6},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":125.5605,"lat":7.04667}},{"Asset ID":"AG-M-0049","Project / plant":"Talomo 2A Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XI","Province":"Davao del Sur","Municipality":"Davao City","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Hedcor, Inc.","River / basin":"Talomo River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V10S023","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S02; V10S023","tech_family":"Run-of-river","installed_mw_source_vintage":0.65,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.7},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":125.4916,"lat":7.096}},{"Asset ID":"AG-M-0050","Project / plant":"Talomo 2B Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XI","Province":"Davao del Sur","Municipality":"Davao City","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Hedcor, Inc.","River / basin":"Talomo River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V10S023","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S02; V10S023","tech_family":"Run-of-river","installed_mw_source_vintage":0.3,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.3},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":125.49,"lat":7.09}},{"Asset ID":"AG-M-0051","Project / plant":"Talomo 3  Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XI","Province":"Davao del Sur","Municipality":"Davao City","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Hedcor, Inc.","River / basin":"Talomo River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V10S023","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S02; V10S023","tech_family":"Run-of-river","installed_mw_source_vintage":1.92,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":1.9},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":125.5236,"lat":7.0844}},{"Asset ID":"AG-M-0052","Project / plant":"Apo Agua Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XI","Province":"Davao del Sur","Municipality":"Davao City","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river integrated with water supply","Turbine technology":"Not established","Developer / operator":"Apo Agua Infrastructura, Inc.","River / basin":"Tamugan River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Run-of-river","installed_mw_source_vintage":2.424,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Davao City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0053","Project / plant":"Apo Ahom 1 Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao del Sur","Municipality":"Davao City","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Polaris Power Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":35.02,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Davao City","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0054","Project / plant":"Tudaya 2 Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XI","Province":"Davao del Sur","Municipality":"Sta. Cruz","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river without reservoir","Turbine technology":"Francis (two unequal units)","Developer / operator":"Hedcor Tudaya, Inc.","River / basin":"Sibulan River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V8S12; V10S023","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02; V8S12; V10S023","tech_family":"Reservoir / impounding","installed_mw_source_vintage":8.137,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":8.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Santa Cruz","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0055","Project / plant":"Tudaya 1 Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XI","Province":"Davao del Sur","Municipality":"Sta. Cruz","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river without reservoir","Turbine technology":"Pelton","Developer / operator":"Hedcor Sibulan, Inc .","River / basin":"Baroring Creek (part of Sibulan River system); upstream of Sibulan A","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V8S12; V10S023","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S02; V8S12; V10S023","tech_family":"Reservoir / impounding","installed_mw_source_vintage":6.6,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":6.6},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":125.416,"lat":7.1167}},{"Asset ID":"AG-M-0056","Project / plant":"Sibulan A Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XI","Province":"Davao del Sur","Municipality":"Sta. Cruz","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river with pondage","Turbine technology":"Pelton (two units)","Developer / operator":"Hedcor Sibulan, Inc .","River / basin":"Sibulan River basin (tributary/intake attribution in PDD)","Storage epoch and level basis":"See field ledger for design or survey vintage | V11 Sibulan A total impounding-basin pondage volume; Constructed plants described in 2012; basin survey date not stated; Total volume of explicitly identified impounding basin, selected for T only. Does not establish live/active volume or volume at normal level; prior V10 U exclusions remain intact. Sibulan A 100000 m3 differs from secondary 70000 m3 design pondage; owner-engineer report of operating basin retained with date; no geometry inferred. Separate cascading basins; do not add shared upstream water twice.","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V6S05; V10S103","Record scope":"Awarded contract list, Aug2026","Warnings":" | V11 T: REPORTED_HISTORICAL; Total volume of explicitly identified impounding basin, selected for T only. Does not establish live/active volume or volume at normal level; prior V10 U exclusions remain intact. Sibulan A 100000 m3 differs from secondary 70000 m3 design pondage; owner-engineer report of operating basin retained with date; no geometry inferred. Separate cascading basins; do not add shared upstream water twice.","Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S02; V6S05; V10S103","tech_family":"Run-of-river","installed_mw_source_vintage":16.328,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":16.3},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":0.1},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":0.013751},"AB":{"evidence":72.32},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":10,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":125.385,"lat":6.908}},{"Asset ID":"AG-M-0057","Project / plant":"Sibulan B Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XI","Province":"Davao del Sur","Municipality":"Sta. Cruz","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river with pondage","Turbine technology":"Pelton (two units)","Developer / operator":"Hedcor Sibulan, Inc .","River / basin":"Sibulan River basin (tributary/intake attribution in PDD)","Storage epoch and level basis":"See field ledger for design or survey vintage | V11 Sibulan B total impounding-basin pondage volume; Constructed plants described in 2012; basin survey date not stated; Total volume of explicitly identified impounding basin, selected for T only. Does not establish live/active volume or volume at normal level; prior V10 U exclusions remain intact. Sibulan A 100000 m3 differs from secondary 70000 m3 design pondage; owner-engineer report of operating basin retained with date; no geometry inferred. Separate cascading basins; do not add shared upstream water twice.","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V6S05; V10S103","Record scope":"Awarded contract list, Aug2026","Warnings":" | V11 T: REPORTED_HISTORICAL; Total volume of explicitly identified impounding basin, selected for T only. Does not establish live/active volume or volume at normal level; prior V10 U exclusions remain intact. Sibulan A 100000 m3 differs from secondary 70000 m3 design pondage; owner-engineer report of operating basin retained with date; no geometry inferred. Separate cascading basins; do not add shared upstream water twice.","Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S02; V6S05; V10S103","tech_family":"Run-of-river","installed_mw_source_vintage":26.256,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":26.3},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":0.05},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":0.01414},"AB":{"evidence":127.66},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":10,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":125.4,"lat":6.8}},{"Asset ID":"AG-M-0058","Project / plant":"New Bataan Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XI","Province":"Compostela Valley","Municipality":"New Bataan","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Pelton, 3 sets: 2 x 1.0 MW + 1 x 0.4 MW","Developer / operator":"Euro Hydro Power (Asia) Holdings, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V10S100","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02; V10S100","tech_family":"Run-of-river","installed_mw_source_vintage":3.188,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":3.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=New Bataan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0059","Project / plant":"Cateel Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao Oriental","Municipality":"Baganga","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Global Sibagat Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":29.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Baganga","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0060","Project / plant":"Baganga River Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao Oriental","Municipality":"Baganga","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Global Sibagat Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":18.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Baganga","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0061","Project / plant":"Manorigao Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao Oriental","Municipality":"Caraga","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"LGS Renewable Energies Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":17.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Caraga","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0062","Project / plant":"Caraga 4 Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao Oriental","Municipality":"Caraga","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"LGS Renewable Energies Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":35.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Caraga","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0063","Project / plant":"Caraga A1 Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao Oriental","Municipality":"Caraga","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Caraga A1 Hydroelectric Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"SITE_APPROXIMATE","Coordinate qualification":"2020 Volga Power Corp 4.8 MW design vs baseline Caraga A1 Hydroelectric Power Corporation 6.5 MW. Phase A1 and Caraga River/Pichon match; legal successor/current design not established.","Coordinate source ID":"V10S134","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":6.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":10.0,"low":10.0,"high":10.0,"new_cell":true,"limitation":"[\"Scoping-stage design (4.8 MW); exa cached text, no page numbers.\", \"Scoping-stage design (4.8 MW); exa cached text, no page numbers.\", \"Scoping-stage design (4.8 MW); exa cached text, no page numbers. Also 'roughly 225 square kilometer catchment area' in Sec 2.3\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0014"}},"S":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":45.0,"low":45.0,"high":45.0,"new_cell":true,"limitation":"[\"Scoping-stage design (4.8 MW); exa cached text, no page numbers.\", \"Scoping-stage design (4.8 MW); exa cached text, no page numbers.\", \"Scoping-stage design (4.8 MW); exa cached text, no page numbers. Also 'roughly 225 square kilometer catchment area' in Sec 2.3\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0015"}},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":225.15,"low":225.15,"high":225.15,"new_cell":true,"limitation":"[\"Scoping-stage design (4.8 MW); exa cached text, no page numbers.\", \"Scoping-stage design (4.8 MW); exa cached text, no page numbers.\", \"Scoping-stage design (4.8 MW); exa cached text, no page numbers. Also 'roughly 225 square kilometer catchment area' in Sec 2.3\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0016"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"point","status":"SITE_APPROXIMATE","lon":126.33934,"lat":7.38739}},{"Asset ID":"AG-M-0064","Project / plant":"Caraga A2 Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao Oriental","Municipality":"Caraga","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river","Turbine technology":"Horizontal Francis (two2.3MW units in2022 EIS)","Developer / operator":"Caraga A2 Hydroelectric Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V9S05","Record scope":"Awarded contract list, Aug2026","Warnings":"2022 EIS design; 7MW awarded project but EIS lists two2.3MW units; design versions differ; EIS overview says roughly205 km2; technical table and basin analysis both236 km2. Difference retained as candidate; not GIS independently verified.","Coordinate status":"SITE_APPROXIMATE","Coordinate qualification":"2022 Caraga A2 Hydro Power Corp design, Caraga River, Pichon. EIS explicitly describes change of ownership from Volga; 4.60 MW vs baseline 7 MW; current design not established.","Coordinate source ID":"V9S05","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":7.0,"dam_crest_elevation_masl":442.0,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":44.0},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":0.041,"low":0.041,"high":0.041,"new_cell":true,"limitation":"[\"0.041km2 may include flood extent; only a design footprint scenario, not an identified normal-stage area. No structural height from water depth.\", \"EIS design (4.60 MW configuration); exa cached text, no page numbers. Reference water level not stated; may include flood level\", \"EIS design (4.60 MW configuration); exa cached text, no page numbers. Already in dataset (236); confirms. Text also cites ~205 km2 for 3-project area\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0157"}},"AB":{"evidence":236.0,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":236.0,"low":236.0,"high":236.0,"new_cell":false,"limitation":"[\"0.041km2 may include flood extent; only a design footprint scenario, not an identified normal-stage area. No structural height from water depth.\", \"EIS design (4.60 MW configuration); exa cached text, no page numbers. Reference water level not stated; may include flood level\", \"EIS design (4.60 MW configuration); exa cached text, no page numbers. Already in dataset (236); confirms. Text also cites ~205 km2 for 3-project area\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0158"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":12,"location":{"kind":"point","status":"SITE_APPROXIMATE","lon":126.32711,"lat":7.39209}},{"Asset ID":"AG-M-0065","Project / plant":"Caraga A3 Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao Oriental","Municipality":"Caraga","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Caraga A3 Hydroelectric Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"SITE_APPROXIMATE","Coordinate qualification":"2022 Caraga A3 Hydro Power Corporation, Caraga River, Pichon, 9.70 MW vs baseline 4.5 MW; source-era design only; phase A3 not A1/A2.","Coordinate source ID":"V10S135","tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":10.0,"low":10.0,"high":10.0,"new_cell":true,"limitation":"[\"Scoping-stage design (6.9 MW); superseded by 2022 EIS (9.7 MW); exa cached text, no page numbers.\", \"Scoping-stage design (6.9 MW); superseded by 2022 EIS (9.7 MW); exa cached text, no page numbers. Conflicts with 2022 EIS 40 m\", \"Scoping-stage design (6.9 MW); superseded by 2022 EIS (9.7 MW); exa cached text, no page numbers. Conflicts with 2022 EIS 203 km2\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0017"}},"S":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":60.0,"low":60.0,"high":60.0,"new_cell":true,"limitation":"[\"Scoping-stage design (6.9 MW); superseded by 2022 EIS (9.7 MW); exa cached text, no page numbers.\", \"Scoping-stage design (6.9 MW); superseded by 2022 EIS (9.7 MW); exa cached text, no page numbers. Conflicts with 2022 EIS 40 m\", \"Scoping-stage design (6.9 MW); superseded by 2022 EIS (9.7 MW); exa cached text, no page numbers. Conflicts with 2022 EIS 203 km2\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0018"}},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":189.81,"low":189.81,"high":189.81,"new_cell":true,"limitation":"[\"Scoping-stage design (6.9 MW); superseded by 2022 EIS (9.7 MW); exa cached text, no page numbers.\", \"Scoping-stage design (6.9 MW); superseded by 2022 EIS (9.7 MW); exa cached text, no page numbers. Conflicts with 2022 EIS 40 m\", \"Scoping-stage design (6.9 MW); superseded by 2022 EIS (9.7 MW); exa cached text, no page numbers. Conflicts with 2022 EIS 203 km2\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0019"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"point","status":"SITE_APPROXIMATE","lon":126.3049,"lat":7.37684}},{"Asset ID":"AG-M-0066","Project / plant":"Osmeña Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao Oriental","Municipality":"Governor Generoso","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"LGS Renewable Energies Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Governor Generoso","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0067","Project / plant":"Tibanban Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao Oriental","Municipality":"Governor Generoso","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"LGS Renewable Energies Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Governor Generoso","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0068","Project / plant":"Magdao Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao Oriental","Municipality":"Governor Generoso","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Volga Power Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Governor Generoso","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0069","Project / plant":"Casauman Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao Oriental","Municipality":"Manay","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Global Sibagat Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":34.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Manay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0070","Project / plant":"Lapinigan Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao Oriental","Municipality":"Manay","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"King Energy Generation Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Manay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0071","Project / plant":"Manay Hydroelectric Power Projec","Island":"Mindanao","DOE region":"XI","Province":"Davao Oriental","Municipality":"Manay","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"King Energy Generation Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":7.44,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Manay","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0072","Project / plant":"Camanlangan Hydroelectric Power Project","Island":"Mindanao","DOE region":"XI","Province":"Davao de Oro","Municipality":"New Bataan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"King Energy Generation Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":35.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=New Bataan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0073","Project / plant":"Alamada Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XII","Province":"North Cotabato","Municipality":"Alamada","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Horizontal-axis Francis, 3 x 945 kW","Developer / operator":"Euro Hydro Power (Asia) Holdings, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V10S101","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02; V10S101","tech_family":"Run-of-river","installed_mw_source_vintage":3.0,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":3.0},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Alamada","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0074","Project / plant":"Upper Libungan Hydroelectric Power Project","Island":"Mindanao","DOE region":"XII","Province":"North Cotabato","Municipality":"Alamada","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"King Energy Generation Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":10.06,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Alamada","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0075","Project / plant":"Magpet 1 Hydroelectric Power Project","Island":"Mindanao","DOE region":"XII","Province":"North Cotabato","Municipality":"Magpet","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Universal Hydrotechnologies, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":18.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Magpet","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0076","Project / plant":"Magpet 2 Hydroelectric Power Project","Island":"Mindanao","DOE region":"XII","Province":"North Cotabato","Municipality":"Magpet","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Universal Hydrotechnologies, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.5,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Magpet","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0077","Project / plant":"Magpet Hydroelectric Power Project","Island":"Mindanao","DOE region":"XII","Province":"North Cotabato","Municipality":"Magpet","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"King Energy Generation Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.11,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Magpet","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0078","Project / plant":"Malasila Mini Hydroelectric Power Project","Island":"Mindanao","DOE region":"XII","Province":"North Cotabato","Municipality":"Makilala","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Ecogen Renewable Energy Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":2.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Makilala","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0079","Project / plant":"Marbel 1 Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XII","Province":"South Cotabato","Municipality":"Koronadal & Tampakan","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Not established","Developer / operator":"Euro Hydro Power (Asia) Holdings, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"INHERITED_DATUM_UNVERIFIED","Coordinate qualification":"Inherited coordinate fields retain original datum uncertainty","Coordinate source ID":"V6S02","tech_family":"Run-of-river","installed_mw_source_vintage":0.788,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":0.8},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"point","status":"INHERITED_DATUM_UNVERIFIED","lon":124.9152,"lat":7.1222}},{"Asset ID":"AG-M-0080","Project / plant":"Lake Sebu Hydroelectric Power Project","Island":"Mindanao","DOE region":"XII","Province":"South Cotabato","Municipality":"Lake Sebu","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Euro Hydro Power (Asia) Holdings, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Lake Sebu","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0081","Project / plant":"Lamfugon Hydroelectric  Power Project","Island":"Mindanao","DOE region":"XII","Province":"South Cotabato","Municipality":"Lake Sebu","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"GemmaPower Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Lake Sebu","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0082","Project / plant":"Lenon (Lake Sebu 3) Hydroelectric Power Project","Island":"Mindanao","DOE region":"XII","Province":"South Cotabato","Municipality":"Surallah","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Euro Hydro Power (Asia) Holdings, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.6,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Surallah","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0083","Project / plant":"Talayan Hydroelectric Power Project","Island":"Mindanao","DOE region":"XII","Province":"South Cotabato","Municipality":"Lebak","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"King Energy Generation Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":30.3,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-M-0084","Project / plant":"Glan Hydroelectric Power Project","Island":"Mindanao","DOE region":"XII","Province":"Sarangani","Municipality":"Glan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"King Energy Generation Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Glan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0085","Project / plant":"Siguil Hydroelectric Power Project","Island":"Mindanao","DOE region":"XII","Province":"Sarangani","Municipality":"Maasim","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"1 x 14.5 MW unit; turbine by Zeco, generator by Gamesa","Developer / operator":"Siguil Hydro Power Corporation","River / basin":"Siguil River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V10S093","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02; V10S093","tech_family":"Run-of-river","installed_mw_source_vintage":15.3,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":14.5},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Maasim","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0086","Project / plant":"Kalaong 1 Hydroelectric Power Project","Island":"Mindanao","DOE region":"XII","Province":"Sarangani","Municipality":"Maitum","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Alsons Energy Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":7.4,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Maitum","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0087","Project / plant":"Kalaong 2 Hydroelectric Power Project","Island":"Mindanao","DOE region":"XII","Province":"Sarangani","Municipality":"Maitum","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Alsons Energy Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":4.8,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Maitum","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0088","Project / plant":"Maitum-Kiamba Hydroelectric Power Project","Island":"Mindanao","DOE region":"XII","Province":"Sarangani","Municipality":"Maitum and Kiamba","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"King Energy Generation Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":3.52,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Maitum,Kiamba","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0089","Project / plant":"Puyo Hydroelectric Power Project","Island":"Mindanao","DOE region":"XIII","Province":"Agusan del Norte","Municipality":"Jabonga","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Run-of-river with headpond","Turbine technology":"Francis (two units)","Developer / operator":"FGEN Puyo Hydro  Corporation","River / basin":null,"Storage epoch and level basis":"2012 estimated headpond volume 0.127 MCM, no live/dead split","Water-level / area basis":"2012 estimated headpond area 0.063 km2; elevation unspecified","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V8S04","Record scope":"Awarded contract list, Aug2026","Warnings":"2012 estimate; not current surveyed gross storage; headpond only; 2012 estimate; reference level unspecified","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V8S04","tech_family":"Run-of-river","installed_mw_source_vintage":null,"potential_mw_awarded_list":30.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":0.127},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":0.063},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":12,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Jabonga","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0090","Project / plant":"Lake Mainit Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XIII","Province":"Agusan del Norte","Municipality":"Jabonga","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Vertical Francis, 3 units (3 x 8.3 MW per J-Power)","Developer / operator":"Agusan Power Corporation","River / basin":"Lake Mainit (natural lake)","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V10S095","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02; V10S095","tech_family":"Run-of-river","installed_mw_source_vintage":24.9,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":24.9},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Jabonga","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0091","Project / plant":"Asiga Hydroelectric Power Plant","Island":"Mindanao","DOE region":"XIII","Province":"Agusan del Norte","Municipality":"Santiago","Contract / inventory stage":"Commercial Operation","Existing / planned":"Existing","Hydropower technology":"Run-of-river","Turbine technology":"Horizontal-shaft Francis (two 4 MW units)","Developer / operator":"Asiga Green Energy Corporation","River / basin":"Asiga River","Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V6S02; V8S17","Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V6S02; V8S17","tech_family":"Run-of-river","installed_mw_source_vintage":8.0,"potential_mw_awarded_list":null,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":7.9},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":13,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Santiago","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0092","Project / plant":"Lower Carac-an Hydroelectric Power Project","Island":"Mindanao","DOE region":"XIII","Province":"Surigao del Sur","Municipality":"Cantilan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Meadowland Developers, Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":5.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Cantilan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0093","Project / plant":"Tago Hydroelectric Power Project","Island":"Mindanao","DOE region":"XIII","Province":"Surigao del Sur","Municipality":"Lanuza","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Alsons Energy Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":9.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Lanuza","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0094","Project / plant":"Hubo Hydroelectric Power Project","Island":"Mindanao","DOE region":"XIII","Province":"Surigao del Sur","Municipality":"San Agustin","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Alsons Energy Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":13.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Agustin","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0095","Project / plant":"Calatngan Hydroelectric Power Project","Island":"Mindanao","DOE region":"XIII","Province":"Surigao del Sur","Municipality":"San Miguel","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"King Energy Generation Inc.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":0.0,"potential_mw_awarded_list":5.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=San Miguel","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0096","Project / plant":"Andanan Hydroelectric Power Project","Island":"Mindanao","DOE region":"XIII","Province":"Agusan del Sur","Municipality":"Bayugan City","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Alsons Energy Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":8.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=City of Bayugan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0097","Project / plant":"Wawa Hydroelectric Power Project","Island":"Mindanao","DOE region":"XIII","Province":"Agusan del Sur","Municipality":"Sibagat","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Global Sibagat Hydropower Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":13.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":5.0,"low":5.0,"high":5.0,"new_cell":true,"limitation":"[\"Intake continuity to awarded project not verified; no scaling by13MW awarded capacity.\", \"No reservoir storage fraction or inferred gross/live/dead volume.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0145"}},"S":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":57.4,"low":57.4,"high":57.4,"new_cell":true,"limitation":"[\"Intake continuity to awarded project not verified; no scaling by13MW awarded capacity.\", \"No reservoir storage fraction or inferred gross/live/dead volume.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0146"}},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":267.0,"low":267.0,"high":267.0,"new_cell":true,"limitation":"[\"Intake continuity to awarded project not verified; no scaling by13MW awarded capacity.\", \"No reservoir storage fraction or inferred gross/live/dead volume.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0147"}},"AA":{"evidence":null},"AB":{"evidence":null,"planning":{"status":"PLANNING_DESIGN_HYPOTHESIS","base":98.2,"low":98.2,"high":98.2,"new_cell":true,"limitation":"[\"Intake continuity to awarded project not verified; no scaling by13MW awarded capacity.\", \"No reservoir storage fraction or inferred gross/live/dead volume.\", \"Equal bounds identify a fixed hypothetical design, NOT accuracy, empirical bounds, or a confidence interval.\"]","record_id":"V12-DESIGN-0148"}},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Sibagat","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0098","Project / plant":"Agus III Hydroelectric Power Project","Island":"Mindanao","DOE region":"X/ARMM","Province":"Lanao del Sur","Municipality":"Pantar, Lanao del Norte & Baloi/Saguiara","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Reservoir / impounding conventional hydro","Turbine technology":"Not established","Developer / operator":"Maranao Energy Corp.","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":"V7S01","Record scope":"Awarded contract list, Aug2026","Warnings":"Historic proposed 225 MW Agus III, Lavalin1990 feasibility; not an operating plant or confirmation of current detailed design. Cumulative cascade catchment, not independent local inflow.; Historic proposed 225 MW Agus III, Lavalin1990 feasibility; not an operating plant or confirmation of current detailed design. Cumulative cascade catchment, not independent local inflow.; Historic proposed 225 MW Agus III, Lavalin1990 feasibility; not an operating plant or confirmation of current detailed design. Cumulative cascade catchment, not independent local inflow.; Historic proposed 225 MW Agus III, Lavalin1990 feasibility; not an operating plant or confirmation of current detailed design. Cumulative cascade catchment, not independent local inflow.; Historic proposed 225 MW Agus III, Lavalin1990 feasibility; not an operating plant or confirmation of current detailed design. Cumulative cascade catchment, not independent local inflow.; Historic proposed 225 MW Agus III, Lavalin1990 feasibility; not an operating plant or confirmation of current detailed design. Cumulative cascade catchment, not independent local inflow.; Historic proposed 225 MW Agus III, Lavalin1990 feasibility; not an operating plant or confirmation of current detailed design. Cumulative cascade catchment, not independent local inflow.","Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":"V7S01","tech_family":"Reservoir / impounding","installed_mw_source_vintage":null,"potential_mw_awarded_list":225.0,"dam_crest_elevation_masl":530.0,"fields":{"Q":{"evidence":null},"R":{"evidence":58.0},"S":{"evidence":180.0},"T":{"evidence":null},"U":{"evidence":0.7},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":524.0},"Y":{"evidence":516.0},"Z":{"evidence":524.0},"AA":{"evidence":null},"AB":{"evidence":1844.0},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":7,"location":{"kind":"none","status":"UNRESOLVED"}},{"Asset ID":"AG-M-0105","Project / plant":"Siayan 1 (formerly Sindangan 1) Hydroelectric Power Project","Island":"Mindanao","DOE region":null,"Province":"Zamboanga del Norte","Municipality":"Siayan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Alsons Energy Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":8.81,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Siayan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0106","Project / plant":"Siayan 2 (formerly Sindangan 2) Hydroelectric Power Project","Island":"Mindanao","DOE region":null,"Province":"Zamboanga del Norte","Municipality":"Siayan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Alsons Energy Development Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":7.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Siayan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0107","Project / plant":"Alimpaya Hydroelectric Power Project","Island":"Mindanao","DOE region":null,"Province":"Zamboanga del Norte","Municipality":"Siayan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Everhydro Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.2,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Siayan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0108","Project / plant":"Tagpangi Hydroelectric Power Project","Island":"Mindanao","DOE region":null,"Province":"Zamboanga del Norte","Municipality":"Siayan","Contract / inventory stage":"Development","Existing / planned":"Ongoing","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Everhydro Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.7,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Siayan","source_id":"V11_GB_ADM3"}},{"Asset ID":"AG-M-0109","Project / plant":"Ayala Hydroelectric Power Project.","Island":"Mindanao","DOE region":null,"Province":"Zamboanga del Norte","Municipality":"Siayan","Contract / inventory stage":"Pre-Development","Existing / planned":"Planned","Hydropower technology":"Unverified hydropower subtype","Turbine technology":"Not established","Developer / operator":"Everhydro Corporation","River / basin":null,"Storage epoch and level basis":"See field ledger for design or survey vintage","Water-level / area basis":"Current/design definitions may differ; consult selected field ledger","Mean inflow basis":null,"Peak inflow period and basis":null,"Shared reservoir ID":null,"Source IDs":null,"Record scope":"Awarded contract list, Aug2026","Warnings":null,"Coordinate status":"UNRESOLVED","Coordinate qualification":"See separate municipal search areas; no structural location asserted","Coordinate source ID":null,"tech_family":"Subtype not established","installed_mw_source_vintage":null,"potential_mw_awarded_list":1.0,"dam_crest_elevation_masl":null,"fields":{"Q":{"evidence":null},"R":{"evidence":null},"S":{"evidence":null},"T":{"evidence":null},"U":{"evidence":null},"V":{"evidence":null},"W":{"evidence":null},"X":{"evidence":null},"Y":{"evidence":null},"Z":{"evidence":null},"AA":{"evidence":null},"AB":{"evidence":null},"AC":{"evidence":null},"AD":{"evidence":null}},"missing_evidence_fields":14,"location":{"kind":"search_area","status":"MUNICIPALITY_ONLY","basis":"shapeName=Siayan","source_id":"V11_GB_ADM3"}}]