[{"id":"V6S01","publisher":"DOE EPIMB","title":"Existing grid-connected plants: Luzon","url":"https://prod-cms.doe.gov.ph/documents/d/guest/01-luzon-pdf","url_status":"public","vintage":"2025-11-30","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S02","publisher":"DOE EPIMB","title":"Existing grid-connected plants: Mindanao","url":"https://prod-cms.doe.gov.ph/documents/d/guest/03-mindanao-pdf","url_status":"public","vintage":"2025-11-30","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S03","publisher":"DOE EPIMB","title":"Existing grid-connected plants: Visayas","url":"https://prod-cms.doe.gov.ph/documents/d/guest/02-visayas-grid-3-pdf","url_status":"public","vintage":"2025-08-31","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S04","publisher":"ANDRITZ","title":"HydroNews 28: Philippines technical tables","url":"https://www.andritz.com/hydro-en/hydronews/28/hy-news-28-04-philippines-hydro","url_status":"public","vintage":"2015 project design / supply","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S05","publisher":"UNFCCC / Hedcor","title":"Sibulan CDM Project 1620 PDD v08","url":"https://cdm.unfccc.int/UserManagement/FileStorage/9LRY5NGKEC2A0QZ1FIOPJUSM43HWB8","url_status":"public","vintage":"2017 approved PDD; underlying pre-construction design","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S06","publisher":"World Bank / NPC","title":"Agus-Pulangi rehabilitation preliminary draft ESIA","url":"https://documents1.worldbank.org/curated/en/102631635458222644/pdf/Preliminary-Draft-Environmental-and-Social-Impact-Assessment-Agus-Pulangi-Hydropower-Complex-Rehabilitation-Project-1-P173728.pdf","url_status":"public","vintage":"2021 draft; energy means 2011-2019","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S07","publisher":"NPC","title":"Ambuklao dam characteristics","url":"https://www.napocor.gov.ph/dam-sites-ambuklao-dam/","url_status":"public","vintage":"Historical design and explicitly dated 2012 bathymetry","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S08","publisher":"NPC","title":"Binga dam characteristics","url":"https://www.napocor.gov.ph/dam-sites-binga-dam/","url_status":"public","vintage":"Undated page with historical and sedimented values","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S09","publisher":"IHA","title":"Binga sediment-management case study","url":"https://www.hydropower.org/sediment-management-case-studies/philippines-binga","url_status":"public","vintage":"Post-2013 refurbishment; 2015 storage","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S10","publisher":"NIA","title":"Magat project description","url":"https://opfais.nia.gov.ph/Viewer/Magat","url_status":"public","vintage":"Historical design, undated government page","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S11","publisher":"IFC","title":"Magat Hydro environmental and social review","url":"https://disclosures.ifc.org/project-detail/ESRS/26041/magat-hydro","url_status":"public","vintage":"2007 project disclosure","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S12","publisher":"NIA","title":"Angat dam description","url":"https://opfais.nia.gov.ph/Viewer/Angat","url_status":"public","vintage":"Undated design / normal operating level","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S13","publisher":"First Gen","title":"2024 SEC annual report","url":"https://www.firstgen.com.ph/static-assets/assets/file-uploads/investor-relations/2020-stockholder-meeting/2024-AnnualReport.pdf","url_status":"public","vintage":"FY2024 report, published 2025","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S14","publisher":"First Gen","title":"Hydro operating assets","url":"https://www.firstgen.com.ph/our-business/hydro","url_status":"public","vintage":"Operator page; capacity history distinguished","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S15","publisher":"First Gen","title":"2025 integrated report manufactured capital","url":"https://2025integratedreport.firstgen.com.ph/value-creation/values-generated/manufactured-capital","url_status":"public","vintage":"2025 actual generation","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S16","publisher":"San Roque Power Corporation","title":"San Roque technical features","url":"https://sanroquepower.ph/plant-features/technical-features-of-san-roque-power-plant/","url_status":"public","vintage":"Undated operator design specifications","quality":"Primary; hidden tables verified via indexed technical-table extraction","accessed":"2026-11-11"},{"id":"V6S17","publisher":"NPC","title":"Agus II characteristics","url":"https://www.napocor.gov.ph/dam-sites-agus-ii-hydroelectric-plant/","url_status":"public","vintage":"Undated technical page","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S18","publisher":"NPC","title":"Agus IV characteristics","url":"https://www.napocor.gov.ph/dam-sites-agus-iv-hydroelectric-plant/","url_status":"public","vintage":"Undated technical page","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S19","publisher":"NPC","title":"Agus V characteristics","url":"https://www.napocor.gov.ph/dam-sites-agus-v-hydroelectric-plant/","url_status":"public","vintage":"Undated technical page","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S20","publisher":"NPC","title":"Agus VI characteristics","url":"https://www.napocor.gov.ph/dam-sites-agus-vi-hydroelectric-plant/","url_status":"public","vintage":"Undated technical page","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S21","publisher":"NPC","title":"Agus VII characteristics","url":"https://www.napocor.gov.ph/dam-sites-agus-vii-hydroelectric-plant/","url_status":"public","vintage":"Undated technical page","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S22","publisher":"NPC","title":"Pulangi IV characteristics","url":"https://www.napocor.gov.ph/dam-sites-pulangi-iv-hydroelectric-plant/","url_status":"public","vintage":"Undated technical page","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S23","publisher":"Original research, Water 17(17)2514","title":"Pulangi IV hydrology and operation study","url":"https://www.mdpi.com/2073-4441/17/17/2514","url_status":"public","vintage":"2025 paper; design and 1953-1977 hydrology","quality":"Primary research; internal discharge conflict retained","accessed":"2026-11-11"},{"id":"V6S24","publisher":"JICA","title":"National water resources historical dam inventory","url":"https://openjicareport.jica.go.jp/pdf/11462769_03.pdf","url_status":"public","vintage":"Historical report; underlying 1978-1990s records","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S25","publisher":"JICA / NPC","title":"Data Book V, Agus I and II technical table","url":"https://openjicareport.jica.go.jp/pdf/11462819_07.pdf","url_status":"public","vintage":"Printed V-102; historic NPC/NWRC records","quality":"Primary historical table; selected indexed extraction; full fetch timed out","accessed":"2026-11-11"},{"id":"V6S26","publisher":"PAGASA","title":"Flood monitoring and reservoir status","url":"https://bagong.pagasa.dost.gov.ph/index.php/flood","url_status":"public","vintage":"Live snapshots, not a historical inflow panel","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S27","publisher":"PAGASA","title":"Previous Dam Status archive index","url":"https://pubfiles.pagasa.dost.gov.ph/hmd/Previous_Dam_Status/","url_status":"public","vintage":"Index checked 2026-11-11","quality":"Public directory contains location files, not a daily inflow archive","accessed":"2026-11-11"},{"id":"V6S28","publisher":"IFC","title":"Ambuklao-Binga environmental review","url":"https://disclosures.ifc.org/project-detail/ESRS/26996/ambuklao-binga","url_status":"public","vintage":"2008 disclosure","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S29","publisher":"ANDRITZ","title":"Philippines Hydro News Asia","url":"https://www.andritz.com/hydro-en/hydronews/hydro-news-asia/philippines","url_status":"public","vintage":"Historical project portfolio","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S30","publisher":"AboitizPower","title":"2019 bond preliminary prospectus","url":"https://aboitizpower.com/uploads/AP-BONDS-2019-Preliminary-Prospectus-08.23.19-1.pdf","url_status":"public","vintage":"2019 issuer disclosure","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S31","publisher":"DOE EPIMB","title":"November 2025 national grid fleet summary","url":"https://prod-cms.doe.gov.ph/documents/d/guest/04-lvm-summary-5-pdf","url_status":"public","vintage":"2025-11-30","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S32","publisher":"Original supplied workbook","title":"DOE awarded hydro contract list embedded in V5","url":"https://d24qbtp4vooyzi.cloudfront.net/api/media/file/Awarded%20Hydro%20Aug%202026.pdf?prefix=dev%2Fmedia","url_status":"public","vintage":"2026-08; original imported evidence not independently re-downloaded","quality":"Original workbook evidence; capacity is awarded-register vintage","accessed":"2026-11-11"},{"id":"V6S33","publisher":"DENR EMB","title":"Alimit and Olilicon Environmental Compliance Certificate ECC-CO-1603-0012","url":"https://eiais.emb.gov.ph/internal/Secured/Uploads/ECC/6e5d3c92-a072-41a6-b114-d01993825658.pdf","url_status":"public","vintage":"ECC design; issue date not revalidated","quality":"Primary certificate table verified via indexed extraction; direct fetch unavailable","accessed":"2026-11-11"},{"id":"V6S34","publisher":"DENR EMB / Pan Pacific / AFRY","title":"Gened2 Environmental Impact Statement","url":"https://eia.emb.gov.ph/wp-content/uploads/2023/09/EIS-for-Public-Hearing_pan-pacific_gened-2-1.pdf","url_status":"public","vintage":"2023 submission; selected 2021 feasibility design; hydrology 1975-1990 /1985-2009","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S35","publisher":"DENR EMB / Ahunan Power","title":"Pakil PSH environmental public summary","url":"https://eia.emb.gov.ph/wp-content/uploads/2022/11/C.-Pakil-PSHPP-ESP-English.pdf","url_status":"public","vintage":"2022 design submission; not confirmation of operation","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S36","publisher":"DENR EMB","title":"Environmental public-hearing record and acquisition links","url":"https://eia.emb.gov.ph/?page_id=72","url_status":"public","vintage":"Historical submissions searched through current index","quality":"Official public index; some EIS links no longer active","accessed":"2026-11-11"},{"id":"V6S37","publisher":"DOE EPIMB","title":"Existing off-grid power plants","url":"https://prod-cms.doe.gov.ph/documents/d/guest/list-of-existing-power-plants-off-grid-as-of-31-december-2025-pdf-1","url_status":"public","vintage":"2025-12-31; some search OCR misreads cover year as20245; body confirms2025","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S38","publisher":"Alternergy","title":"Dupinga starts commercial operation","url":"https://www.alternergy.com/post/alternergy-s-5-mw-dupinga-run-of-river-ror-hydro-plant-in-nueva-ecija-starts-commercial-operations","url_status":"public","vintage":"2026-03 issuer announcement; separate from2025base","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S39","publisher":"Repower Energy Development Corp","title":"2023 final prospectus: Pulanai / Cabanglasan","url":"https://www.repowerenergy.com.ph/files/6_23_23_REDC_Final_Prospectus_with_annex_and_signature_page.pdf","url_status":"public","vintage":"2023 project design; capacity subsequently changed","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S40","publisher":"Aboitiz Construction","title":"Apo Agua water-energy nexus maintenance","url":"https://aboitizconstruction.com/aboitiz-construction-marks-milestone-anniversaries-for-apo-aguas-water-treatment-plant-and-pipeline-maintenance-projects/","url_status":"public","vintage":"2026 operator-group technical service statement","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V6S41","publisher":"Philippine Information Agency / ESAMELCO","title":"Amanjuray rehabilitation and watershed","url":"https://mirror.pia.gov.ph/features/2024/03/01/eastern-samars-sustainable-energy-initiative-gets-a-renewed-boost","url_status":"public","vintage":"2024-03 government report of cooperative project","quality":"Primary technical / official","accessed":"2026-11-11"},{"id":"V7S01","publisher":"JICA / NPC / NWRC","title":"Data Book V, hydropower inventory, scanned source tables","url":"https://openjicareport.jica.go.jp/pdf/11462819_07.pdf","url_status":"public","vintage":"Historical NPC and NWRC1978 inventory; Angat1967 leaflet; late1990s compilation","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V7S02","publisher":"JICA / NPC","title":"Angat Hydroelectric Power Plant rehabilitation study","url":"https://openjicareport.jica.go.jp/pdf/10736486_01.pdf","url_status":"public","vintage":"1989 report; annual peak table1957-1982","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V7S03","publisher":"JICA / NPC","title":"Kalayaan Pumped Storage Stage II feasibility study, summary","url":"https://openjicareport.jica.go.jp/pdf/10876514_01.pdf","url_status":"public","vintage":"November1990; reconstructed historical Caliraya inflows","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V7S04","publisher":"NIA / World Bank","title":"Magat Dam O&M Manual, environmental assessment annex","url":"https://documents1.worldbank.org/curated/en/147621468094482965/pdf/E19760EA0P889260Box334059B01PUBLIC1.pdf","url_status":"public","vintage":"2008 manual; historical design without sedimentation","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V7S05","publisher":"ESCAP/WMO Typhoon Committee / PAGASA","title":"Typhoon Committee Newsletter2009, Philippines report","url":"https://www.typhooncommittee.org/docs/NewsletterPDF/No_21_TCnewsletter_2009.pdf","url_status":"public","vintage":"2009 Parma event; issued2010","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V7S06","publisher":"NIA / DENR EMB","title":"Dumoloc Reservoir EIS, Table2-42","url":"https://eia.emb.gov.ph/wp-content/uploads/2020/12/EIS-Dumoloc-Reservoir.pdf","url_status":"public","vintage":"2020 EIS reproduces Tonkin and Taylor / PSALM2011 Angat dam study","quality":"Official EIS, secondary compilation of recorded means; measurement period unreported","accessed":"2026-11-11"},{"id":"V7S07","publisher":"UNFCCC / Mindanao Energy Systems","title":"Cabulig CDM project3856 PDD revision4","url":"https://cdm.unfccc.int/UserManagement/FileStorage/DL8H0236FXPGTKWCARZVBSQJYNI574","url_status":"public","vintage":"2015-09-23 revised project design","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V7S08","publisher":"UNFCCC / Smith Bell Mini-Hydro","title":"Commonal-Uddiawan PDD version7","url":"https://cdm.unfccc.int/UserManagement/FileStorage/CIZLO73SV6W2NBJPA9Q1HGE0MFDK8U","url_status":"public","vintage":"2011-01-29","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V7S09","publisher":"Philippine News Agency / NIA","title":"NIA testimony and matrix: Magat inflow Nov9-14,2020","url":"https://www.pna.gov.ph/index.php/articles/1122819","url_status":"public","vintage":"2020-11 event","quality":"Official news agency reporting named NIA administrator and matrix","accessed":"2026-11-11"},{"id":"V7S10","publisher":"NIA OPFAIS","title":"Pantabangan technical description","url":"https://opfais.nia.gov.ph/Viewer/Pantabangan","url_status":"public","vintage":"Undated page accessed2026-11-11","quality":"Official NIA summary; conflicts with older level-specific design inventory","accessed":"2026-11-11"},{"id":"V7S11","publisher":"Lake Lanao research paper, Naga","title":"Lake Lanao, an ancient lake in distress","url":"https://www.zamboanga.com/z/images/1/1b/Lake_lanao%2C_an_ancient_lake_in_distress.pdf","url_status":"public","vintage":"Historical Frey bathymetry and1950-1977 natural flow","quality":"Research paper hosted mirror; old full-lake geometry, not present operating storage","accessed":"2026-11-11"},{"id":"V7S12","publisher":"UNFCCC / Hedcor","title":"Irisan CDM project9569 registered PDD","url":"https://cdm.unfccc.int/UserManagement/FileStorage/KSH4Q1GMA3DJFIOZW05TE86Y7L29NC","url_status":"public","vintage":"2013 registration; design evidence","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V7S13","publisher":"Pulangi Hydropower Corp / DENR EMB","title":"South Pulangi250MW project description for scoping","url":"https://eia.emb.gov.ph/wp-content/uploads/2018/08/PDS-SOUTH-PULANGI-HEPP-Complete-AUG2018.pdf","url_status":"public","vintage":"August2018 planned design; not confirmation of operation","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V7S14","publisher":"World Bank","title":"Agus-Pulangi rehabilitation concept environmental review P173728","url":"https://documents1.worldbank.org/curated/en/967551594217413285/pdf/Concept-Environmental-and-Social-Review-Summary-ESRS-Agus-Pulangi-Hydropower-Complex-Rehabilitation-Project-P173728.pdf","url_status":"public","vintage":"2020 concept ESRS; approximate sedimented reservoir volume","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V7S15","publisher":"Sta Clara International, civil contractor","title":"Completed renewable power projects, Cabulig entry","url":"https://staclara.com.ph/what-we-do/completed/renewable-energy-power-plants/","url_status":"public","vintage":"Undated page; Cabulig completionDecember2012","quality":"Primary contractor portfolio; dimension conflicts with2015 registered PDD","accessed":"2026-11-11"},{"id":"V8S01","publisher":"Global Dam Watch / McGill et al.","title":"Global Dam Watch v1.0, official complete CSV, Philippines subset","url":"https://doi.org/10.6084/m9.figshare.25988293","url_status":"public","vintage":"v1.0 published 2024; underlying attributes have mixed historical vintages","quality":"Peer-reviewed compiled dataset; reported and modeled fields distinguished","accessed":"2026-11-11"},{"id":"V8S02","publisher":"Global Dam Watch","title":"Global Dam Watch v1.0 technical documentation","url":"https://ndownloader.figshare.com/files/47913739","url_status":"public","vintage":"2024 v1.0","quality":"Primary dataset documentation","accessed":"2026-11-11"},{"id":"V8S03","publisher":"JICA / Chodai / IDI / EY / Kiso-Jiban","title":"Feasibility Study on Wawa River Mini-hydro Power Project, OS JR(先)16-052","url":"https://www.solutionwater.org/_files/ugd/6a6b2b_b26de10aeeab4bc499fe6567e167fbb8.pdf?index=true","url_status":"public","vintage":"May 2016; selected final design; hydrology 1985-2000 and field work 2014-2015","quality":"Primary feasibility report hosted on a public mirror; original PDF downloaded and tables visually read","accessed":"2026-11-11"},{"id":"V8S04","publisher":"UNFCCC / FGEN Puyo Hydro","title":"Puyo Hydroelectric Power Project, PDD v2.2","url":"https://cdm.unfccc.int/UserManagement/FileStorage/VO6Q853JTRGFLS4MKNEW91YZ2IX7P0","url_status":"public","vintage":"2012-09-27","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V8S05","publisher":"FGHPC / Jacobs / DENR EMB","title":"Aya Pumped Storage Project, public hearing documentation","url":"https://eia.emb.gov.ph/wp-content/uploads/2021/02/FGHPC-Aya-PSP-PH-Documentation.pdf","url_status":"public","vintage":"2021 consultation and design","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V8S06","publisher":"FGHPC / DENR EMB","title":"Aya Pumped Storage Project environmental summary","url":"https://eia.emb.gov.ph/wp-content/uploads/2021/01/ESP-English-FIRST-GEN-HYDRO-POWER-CORPORATION-FGHPC.pdf","url_status":"public","vintage":"2021 design","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V8S07","publisher":"Belisama Hydropower / DENR EMB","title":"800 MW pumped storage project description for scoping","url":"https://eia.emb.gov.ph/wp-content/uploads/2018/05/Project-Description-for-Scoping.pdf","url_status":"public","vintage":"2018 conceptual / selected design","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V8S08","publisher":"Belisama Hydropower / DENR EMB","title":"Belisama PSH environmental summary, Filipino version","url":"https://eia.emb.gov.ph/wp-content/uploads/2022/10/Filipino-Version-EIS-ES-for-PUBLIC-HEARING-BHC-Concise-Ver-Oct17.pdf","url_status":"public","vintage":"October 2022 design","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V8S09","publisher":"Magis Energy Holdings / MRDC","title":"Creating a sustainable tomorrow with Matuno River Development Corporation","url":"https://magisenergyholdings.com/blog/creating-a-sustainable-tomorrow-with-matuno-river-development-corporation/","url_status":"public","vintage":"Undated operator retrospective; final dam design","quality":"Primary operator account; river watershed boundary not independently GIS verified","accessed":"2026-11-11"},{"id":"V8S10","publisher":"Aboitiz Power / DENR EMB CAR","title":"Kibungan 2 Hydroelectric Power Project description","url":"https://car.emb.gov.ph/wp-content/uploads/2022/01/Kibungan_hydro.pdf","url_status":"public","vintage":"2021-11-17 design; 40 MW conventional project","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V8S11","publisher":"UNFCCC / Bubunawan Hydropower","title":"Bubunawan 2 Hydroelectric Power Project PDD","url":"https://cdm.unfccc.int/UserManagement/FileStorage/JX8Z9EC4AUKNT3ISYQB0RLVPDG25WH","url_status":"public","vintage":"2012 design; proposed 23 MW","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V8S12","publisher":"UNFCCC / Hedcor","title":"Tudaya 1 and Tudaya 2 Hydroelectric Power Project PDD","url":"https://cdm.unfccc.int/UserManagement/FileStorage/Z3R9WO26VTAFU0QED1X7NYCP8HKIGJ","url_status":"public","vintage":"2013 registration / preconstruction design","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V8S13","publisher":"NIA MARIIS","title":"Facilities of the Magat River Integrated Irrigation System","url":"https://mariis.nia.gov.ph/node/32","url_status":"public","vintage":"Undated official infrastructure overview","quality":"Primary NIA page; repeated table values and ambiguous Baligatan structure retained as warnings","accessed":"2026-11-11"},{"id":"V8S14","publisher":"Prime Infra","title":"President Marcos leads impounding process ceremony of Upper Wawa Dam","url":"https://primeinfra.com/president-marcos-leads-impounding-process-ceremony-of-upper-wawa-dam/","url_status":"public","vintage":"2024 impoundment announcement","quality":"Primary owner statement; lower-reservoir component, not upper PSH working volume","accessed":"2026-11-11"},{"id":"V8S15","publisher":"GEC / Tokyo Electric Power Services / Philippine DOE","title":"Talubin River Basin Mini-Hydropower CDM PDD, Table A.1","url":"https://gec.jp/jpn/cdm-fs/2005/200518PDD-TokyoElectPowerService-Philippines-MiniHydroPower.pdf","url_status":"public","vintage":"2005 feasibility update; historical Talubin and Caneo 5.4 MW designs","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V8S16","publisher":"GEC / Tokyo Electric Power Services","title":"Talubin River Basin Mini-Hydropower Project CDM feasibility report","url":"https://gec.jp/jpn/cdm-fs/2005/200518ENRep-TokyoElectPowerService-Philippines-MiniHydroPower.pdf","url_status":"public","vintage":"2005 report","quality":"Primary technical document","accessed":"2026-11-11"},{"id":"V8S17","publisher":"Chodai / Asiga Green Energy","title":"Asiga turbine-generator procurement specifications","url":"https://www.chodai.co.jp/en/news/2013/12/012307.html","url_status":"public","vintage":"2013-12 procurement; two 4 MW horizontal Francis units","quality":"Primary project participant procurement announcement","accessed":"2026-11-11"},{"id":"V8S18","publisher":"Kansai Electric Power","title":"Wawa Pumped Storage Hydropower Project, investor project overview","url":"https://www.kepco.co.jp/english/corporate/info/international/generate/wawa.html","url_status":"public","vintage":"2026 investor overview; participation July 2026","quality":"Primary project investor confirmation of variable-speed system","accessed":"2026-11-11"},{"id":"V8S19","publisher":"Philippine News Agency / Presidential ceremony","title":"PBBM to operators: Use dams to generate renewable energy","url":"https://www.pna.gov.ph/articles/1228650","url_status":"public","vintage":"2024-07-10 impoundment ceremony","quality":"Official government report; Upper Wawa dam dimensions","accessed":"2026-11-11"},{"id":"V9S01","publisher":"Repower Energy Development Corp.","title":"2025 Annual Report; 2015 feasibility-study summaries","url":"https://repowerenergy.com.ph/assets/files/investor-relations/other-disclosures/REDC_2025_Annual_Report.pdf","url_status":"public","vintage":"FY2025 issuer filing; engineering summaries explicitly reproduce 2015 studies","quality":"Primary issuer PDF downloaded directly; 211 pages; old forecasts not treated as current status","accessed":"2026-11-11"},{"id":"V9S02","publisher":"Repower Energy Development Corp.","title":"2023 Final Prospectus, engineering and hydrology annexes","url":"https://www.repowerenergy.com.ph/assets/files/repower-investor-relations/prospectus/Final_Prospectus.pdf","url_status":"public","vintage":"2023 prospectus; underlying engineering studies 2015","quality":"Primary issuer PDF downloaded directly; 486 pages","accessed":"2026-11-11"},{"id":"V9S03","publisher":"Rio Norte Hydropower / Mott MacDonald / DENR EMB","title":"Revised Ilaguen 3A Environmental Impact Statement","url":"https://eia.emb.gov.ph/wp-content/uploads/2021/06/2_Revised_EIS.pdf","url_status":"public","vintage":"2021 revised EIS; tender hydrology based on 1985-2012 donor record","quality":"Primary project EIS; selected values and internal conflicts retained","accessed":"2026-11-11"},{"id":"V9S04","publisher":"Rio Norte Hydropower / DENR EMB","title":"Ilaguen 3A updated English executive summary","url":"https://eia.emb.gov.ph/wp-content/uploads/2021/09/Executive-summary-in-English_updated.pdf","url_status":"public","vintage":"September 2021 public summary","quality":"Primary official design summary","accessed":"2026-11-11"},{"id":"V9S05","publisher":"Caraga A2 Hydro Power Corp. / DENR EMB XI","title":"Caraga A2 Hydroelectric Power Project EIS","url":"https://r11.emb.gov.ph/wp-content/uploads/2022/02/CHPP-A2-EIS-20-Jan-2022.pdf","url_status":"public","vintage":"2022-01-20 design EIS","quality":"Primary official design document; 7 MW awarded capacity differs from 4.6 MW EIS turbine configuration","accessed":"2026-11-11"},{"id":"V9S06","publisher":"AFRY","title":"GENED-1 meteorological and hydrological assessments","url":"https://afry.com/en/project/meteorological-and-hydrological-assessments-gened-1-hydroelectric-power-project-philippines","url_status":"public","vintage":"2015 feasibility study","quality":"Primary designer statement; height explicit, not confused with 2023 crest elevation","accessed":"2026-11-11"},{"id":"V9S07","publisher":"CMC Ravenna, construction contractor","title":"Casecnan Multipurpose Power Project","url":"https://cmcgruppo.com/en/progetti%20/casecnan-multipurpose-power-project/","url_status":"public","vintage":"Works completed December 2001; undated contractor portfolio","quality":"Primary construction participant; two different intake structures","accessed":"2026-11-11"},{"id":"V9S08","publisher":"JICA / DPWH","title":"Cagayan basin / Casecnan diversion weir principal features","url":"https://openjicareport.jica.go.jp/pdf/11746484_04.pdf","url_status":"public","vintage":"Early-2000s design/principal-feature compilation","quality":"Primary historical government study; 25 m height differs from contractor structure-height values","accessed":"2026-11-11"},{"id":"V9J10","publisher":"JICA / DOE / NEWJEC","title":"Hydropower resource inventory, Appendix 5 surveyed potential sites, PDF part 10","url":"https://openjicareport.jica.go.jp/pdf/12057493_10.pdf","url_status":"public","vintage":"March 2012 site reconnaissance / preliminary project design","quality":"Primary JICA PDF downloaded directly; not evidence of a current awarded project or as-built plant","accessed":"2026-11-11"},{"id":"V9J11","publisher":"JICA / DOE / NEWJEC","title":"Hydropower resource inventory, Appendix 5 surveyed potential sites, PDF part 11","url":"https://openjicareport.jica.go.jp/pdf/12057493_11.pdf","url_status":"public","vintage":"March 2012 site reconnaissance / preliminary project design","quality":"Primary JICA PDF downloaded directly; not evidence of a current awarded project or as-built plant","accessed":"2026-11-11"},{"id":"V9J12","publisher":"JICA / DOE / NEWJEC","title":"Hydropower resource inventory, Appendix 5 surveyed potential sites, PDF part 12","url":"https://openjicareport.jica.go.jp/pdf/12057493_12.pdf","url_status":"public","vintage":"March 2012 site reconnaissance / preliminary project design","quality":"Primary JICA PDF downloaded directly; not evidence of a current awarded project or as-built plant","accessed":"2026-11-11"},{"id":"V9J13","publisher":"JICA / DOE / NEWJEC","title":"Hydropower resource inventory, Appendix 5 surveyed potential sites, PDF part 13","url":"https://openjicareport.jica.go.jp/pdf/12057493_13.pdf","url_status":"public","vintage":"March 2012 site reconnaissance / preliminary project design","quality":"Primary JICA PDF downloaded directly; not evidence of a current awarded project or as-built plant","accessed":"2026-11-11"},{"id":"V9J14","publisher":"JICA / DOE / NEWJEC","title":"Hydropower resource inventory, Appendix 5 surveyed potential sites, PDF part 14","url":"https://openjicareport.jica.go.jp/pdf/12057493_14.pdf","url_status":"public","vintage":"March 2012 site reconnaissance / preliminary project design","quality":"Primary JICA PDF downloaded directly; not evidence of a current awarded project or as-built plant","accessed":"2026-11-11"},{"id":"V9J15","publisher":"JICA / DOE / NEWJEC","title":"Hydropower resource inventory, Appendix 5 surveyed potential sites, PDF part 15","url":"https://openjicareport.jica.go.jp/pdf/12057493_15.pdf","url_status":"public","vintage":"March 2012 site reconnaissance / preliminary project design","quality":"Primary JICA PDF downloaded directly; not evidence of a current awarded project or as-built plant","accessed":"2026-11-11"},{"id":"V9J16","publisher":"JICA / DOE / NEWJEC","title":"Hydropower resource inventory, Appendix 5 surveyed potential sites, PDF part 16","url":"https://openjicareport.jica.go.jp/pdf/12057493_16.pdf","url_status":"public","vintage":"March 2012 site reconnaissance / preliminary project design","quality":"Primary JICA PDF downloaded directly; not evidence of a current awarded project or as-built plant","accessed":"2026-11-11"},{"id":"V9J17","publisher":"JICA / DOE / NEWJEC","title":"Hydropower resource inventory, Appendix 5 surveyed potential sites, PDF part 17","url":"https://openjicareport.jica.go.jp/pdf/12057493_17.pdf","url_status":"public","vintage":"March 2012 site reconnaissance / preliminary project design","quality":"Primary JICA PDF downloaded directly; not evidence of a current awarded project or as-built plant","accessed":"2026-11-11"},{"id":"V10S001","publisher":"JICA / TEPSCO","title":"Preparatory Survey for the Mini-Hydropower Development Project in the Philippines (Final Report, Japanese)","url":"https://openjicareport.jica.go.jp/pdf/12114500_01.pdf","url_status":"public","vintage":"2013","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S002","publisher":"DOE Electric Power Industry Management Bureau (EPIMB)","title":"List of Existing Power Plants (Grid-Connected) as of 31 August 2026","url":"https://d24qbtp4vooyzi.cloudfront.net/api/media/file/DOE-EPIMB%20LoEPP%20as%20of%20August%202026%20Luzon.pdf?prefix=dev%2Fmedia","url_status":"public","vintage":"2026-08-31 (released Sep 2026)","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S003","publisher":"JICA / NWRB","title":"Master Plan Study on Water Resources Management in the Republic of the Philippines, Final Report, Sector H Annex (Water Resources Development and Management)","url":"https://openjicareport.jica.go.jp/pdf/12018982_05.pdf","url_status":"public","vintage":"circa 2011","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S004","publisher":"Ahunan Power Inc (public hearing presentation, in DENR-EMB PH report)","title":"Public Hearing Report - 1400MW Pakil PSHPP, proponent presentation Salient Project Features","url":"https://eia.emb.gov.ph/wp-content/uploads/2022/12/Ahunan-PH-Documentation.pdf","url_status":"public","vintage":"2022-12-15","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S005","publisher":"Belisama Hydropower Corp (Draft EIS submitted to DENR-EMB; Wayback copy of eia.emb.gov.ph)","title":"Draft Environmental Impact Statement, Proposed 800MW Pumped-storage Hydropower Facility, Pakil and Pangil, Laguna","url":"http://web.archive.org/web/2023id_/http://eia.emb.gov.ph/wp-content/uploads/2022/10/EIS-belisama.pdf","url_status":"public","vintage":"2022-10","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S006","publisher":"Preferred Energy Inc. / ICSC","title":"Compendium of Distributed Renewable Energy Systems in the Philippines","url":"https://icsc.ngo/wp-content/uploads/2025/04/PEI-Compendium-of-DRES-in-the-Philippines-Final.pdf","url_status":"public","vintage":"2024-03","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S007","publisher":"Pulangi Hydro Power Corp / Lichel Technologies (Draft EIS, DENR-EMB; Wayback copy)","title":"South Pulangi HEPP Draft Environmental Impact Statement","url":"http://web.archive.org/web/20201202id_/http://eia.emb.gov.ph/wp-content/uploads/2019/08/South-Pulangi-HEPP-Draft-EIS.pdf","url_status":"public","vintage":"2019-08","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S008","publisher":"NWRB National Water Information Network / JICA water-resources project page (Internet Archive snapshot)","title":"Agusan Hydroelectric Plant - Background, History and Common Facilities","url":"https://web.archive.org/web/20120425020958/http://www.nwin.nwrb.gov.ph/Prog%26Proj/JICA/projects/water_resources/content/14agusan_hydro.htm","url_status":"public","vintage":"Undated profile; archived 2012-04-25 02:09:58 UTC","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S009","publisher":"DOE Electric Power Industry Management Bureau (EPIMB)","title":"List of Existing Power Plants (Grid-Connected) as of 31 August 2026","url":"https://d24qbtp4vooyzi.cloudfront.net/api/media/file/DOE-EPIMB%20LoEPP%20as%20of%20August%202026%20Mindanao.pdf?prefix=dev%2Fmedia","url_status":"public","vintage":"2026-08-31 (released Sep 2026)","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S010","publisher":"DENR-EMB Region 10 / Liangan Power Corporation","title":"Chapter 1 Project Description - Proposed 18 MW Hydroelectric Power Plant Project (ECC amendment)","url":"https://r10.emb.gov.ph/wp-content/uploads/2024/06/CHAPTER-1.-Project-Description-1.pdf","url_status":"public","vintage":"2024-06","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S011","publisher":"DENR-EMB Region 6 / AEDC (preparer BSI)","title":"Bago 3 Hydropower Project Draft Environmental Impact Statement","url":"https://r6.emb.gov.ph/wp-content/uploads/2025/03/AEDC-Bago3-Draft-EIS-Report.pdf","url_status":"public","vintage":"2024-05","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S012","publisher":"OVPI / Apercu Consultants (EIS for DENR-EMB), mirrored on docslib","title":"EIS 500MW Wawa Pumped-Storage Hydropower Project - Executive Summary, Project Fact Sheet","url":"https://docslib.org/doc/4574998/project-fact-sheet","url_status":"public","vintage":"2015","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S013","publisher":"Ahunan Power Inc / Apercu Consultants (DENR-EMB EIS)","title":"1400MW Ahunan Pumped-Storage Hydropower Plant Project - Project Description for Scoping","url":"https://eia.emb.gov.ph/wp-content/uploads/2022/02/C.-Ahunan-Project-Description-for-Scoping.pdf","url_status":"public","vintage":"2022-02","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S014","publisher":"PowerChina Huadong Engineering (procurement notice, reposted on jrzb.com)","title":"Pakil PSP upper reservoir inlet/outlet hydraulic model test & numerical simulation - procurement notice","url":"https://tzs.jrzb.com/purchases/2026-08-20.cd7fc442939c67edbf040fc4e03d20a6","url_status":"public","vintage":"2026-08-20","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S015","publisher":"First Gen Hydro Power Corp / Jacobs Projects Philippines (Public Hearing Report submitted to DENR-EMB)","title":"120MW Aya Pumped Storage Project - Public Hearing Report (incl. presentation annex)","url":"http://web.archive.org/web/20220719id_/http://eia.emb.gov.ph/wp-content/uploads/2021/02/FGHPC-Aya-PSP-PH-Documentation.pdf","url_status":"public","vintage":"2021-02-04","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S016","publisher":"National Power Corporation (EPRMP submitted to DENR-EMB; Wayback copy)","title":"Agus I-II & IV-VII HEPP Rehabilitation Project - EPRMP","url":"http://web.archive.org/web/20221113id_/http://eia.emb.gov.ph/wp-content/uploads/2022/09/EPRMP_Agus-Rehab.pdf","url_status":"public","vintage":"2021-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S017","publisher":"Pulangi Hydro Power Corp / Lichel Technologies (EIS Executive Summary, DENR-EMB; Wayback copy)","title":"South Pulangi HEPP EIS Executive Summary","url":"http://web.archive.org/web/20210128id_/http://eia.emb.gov.ph/wp-content/uploads/2019/08/South-Pulangi-HEPP-Executive-Summary.pdf","url_status":"public","vintage":"2019-08","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S018","publisher":"Pan Pacific Renewable Power Phils Corp (EIS for public hearing, DENR-EMB)","title":"Environmental Impact Statement, Gened-2 Hydro Electric Power Project","url":"https://eia.emb.gov.ph/wp-content/uploads/2023/09/EIS-for-Public-Hearing_pan-pacific_gened-2-1.pdf (Wayback 20251206 copy)","url_status":"public","vintage":"2023-09","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S019","publisher":"ANDRITZ HYDRO (Hydro News Asia)","title":"Green Energy for a Growing Economy - Philippines (HydroNews Asia country report)","url":"https://www.andritz.com/resource/blob/75938/c169e1dc022a6847b9efd456de8b3e82/hy-hn-asia-05-philippines-data.pdf","url_status":"public","vintage":"c.2016","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S020","publisher":"SunStar Baguio","title":"Ex-mayor calls for halt of minihydro construction","url":"https://www.sunstar.com.ph/more-articles/ex-mayor-calls-for-halt-of-minihydro-construction","url_status":"public","vintage":"2014-02-03","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S021","publisher":"Hydro Review / Renewable Energy World","title":"Armed men bomb control room of 14-MW Sabangan hydro plant","url":"https://www.renewableenergyworld.com/hydro-power/dams-civil-structures/breaking-news-armed-men-bomb-control-room-of-14-mw-sabangan-hydro-plant-in-philippines/","url_status":"public","vintage":"2017-10-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S022","publisher":"AboitizPower","title":"AboitizPower's new Cleanergy plant in Mt. Province goes online","url":"https://aboitizpower.com/news/general/aboitizpowers-new-cleanergy-plant-in-mt-province-goes-online","url_status":"public","vintage":"2015-10-08","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S023","publisher":"AboitizPower","title":"Hedcor Group plant list","url":"https://aboitizpower.com/about-us/our-businesses/power-generation/cleanergy/hedcor-group","url_status":"public","vintage":"accessed 2026-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S024","publisher":"H&W Control (GUGLER company)","title":"Philippines - Successful commissioning of 20 MW Bineng HPP","url":"https://www.hw-control.at/news/philippines-successful-commissioning-of-20-mw-bineng-hpp/","url_status":"public","vintage":"2019-07","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S025","publisher":"AboitizPower","title":"IPs of La Trinidad okay Hedcor hydro project","url":"https://aboitizpower.com/news/business-highlights/ips-la-trinidad-okay-hedcor-hydro-project","url_status":"public","vintage":"2017-02-08","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S026","publisher":"AboitizPower","title":"AboitizPower run-of-river hydro unit breaks ground for 19-MW Bineng project","url":"https://aboitizpower.com/news/business-highlights/aboitizpower-run-river-hydro-unit-breaks-ground-19-mw-bineng-project","url_status":"public","vintage":"2017-12-18","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S027","publisher":"Hydro Review / Renewable Energy World","title":"Hedcor to upgrade existing Bineng small hydro plants, more than triple capacity","url":"https://www.renewableenergyworld.com/hydro-power/hedcor-to-upgrade-existing-bineng-small-hydro-plants-more-than-triple-capacity/","url_status":"public","vintage":"2016-08-16","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S028","publisher":"Hydro Review / Renewable Energy World","title":"Hedcor breaks ground on Philippines' Bineng upgrades","url":"https://www.renewableenergyworld.com/hydro-power/hedcor-breaks-ground-on-philippines-bineng-upgrades/","url_status":"public","vintage":"2017-12-06","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S029","publisher":"SunStar Baguio","title":"Hedcor boosts Bakun power plant","url":"https://www.sunstar.com.ph/more-articles/hedcor-boosts-bakun-power-plant-","url_status":"public","vintage":"2015-01-23","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S030","publisher":"Philstar","title":"Hydro business fueling AboitizPower's RE wave","url":"https://www.philstar.com/business/2025/07/06/2455761/hydro-business-fueling-aboitizpowers-re-wave","url_status":"public","vintage":"2025-07-06","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S031","publisher":"Agshan Online (citing SNAP-I project info)","title":"Ifugao holds Cordi Day, focus on Alimit hydro","url":"https://agshan.wordpress.com/2016/05/08/ifugao-holds-cordi-day-focus-on-alimit-hydro/","url_status":"public","vintage":"2016-05-08","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S032","publisher":"Agshan Online (citing SNAP-I)","title":"Power Talks: A Farmer's Take on the Alimit Hydro Project","url":"https://agshan.wordpress.com/2016/04/27/power-talks-a-farmers-take-on-the-alimit-hydro-project/","url_status":"public","vintage":"2016-04-27","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S033","publisher":"SN Aboitiz Power","title":"Alimit HEPP public hearings (press release)","url":"http://www.snaboitiz.com.s3-website-us-east-1.amazonaws.com/news/2016-10-14-snap28/","url_status":"public","vintage":"2016-10-14","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S034","publisher":"Northern Dispatch / Bulatlat (reposted)","title":"Naneng tribe oppose Upper Tabuk Hydropower Dam","url":"http://taga-ilog-news.blogspot.com/2012/06/naneng-tribe-oppose-upper-tabuk.html","url_status":"public","vintage":"2012-06-01","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S035","publisher":"Zigzag Weekly","title":"Local farmers' group opposes hydropower project","url":"https://www.zigzagweekly.net/local-farmers-group-opposes-hydropower-project/","url_status":"public","vintage":"2017-08-07","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S036","publisher":"Rappler","title":"Kalinga tribes press gov't to scrap stalled hydropower projects","url":"https://www.rappler.com/philippines/luzon/kalinga-tribes-scrap-stalled-hydropower-projects/","url_status":"public","vintage":"2025-09-16","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S037","publisher":"NIA-CAR","title":"Kalinga's powerful irrigation canal","url":"https://car.nia.gov.ph/content/kalinga%E2%80%99s-powerful-irrigation-canal","url_status":"public","vintage":"c.2019-2020","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S038","publisher":"Baguio Herald Express","title":"Irrigation canal tapped as power source","url":"https://baguioheraldexpressonline.com/irrigation-canal-tapped-as-power-source/","url_status":"public","vintage":"2015-04-21","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S039","publisher":"Norconsult Management Services Phils (Owner's Engineer)","title":"60MW RoR Kapangan Hydropower Project","url":"https://nmsph.com/project/60mw-kapangan-hydropower-project/","url_status":"public","vintage":"accessed 2026-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S040","publisher":"A. Lazaro and Associates","title":"Detailed Engineering Design of the 22km Length Access Road Works of the 60MW Hydroelectric Power Project","url":"https://alazaro.com/project/detailed-engineering-design-of-the-22km-length-access-road-works-of-the-60mw-hydroelectric-power-project/","url_status":"public","vintage":"accessed 2026-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S041","publisher":"GHD (Owner's Engineer) Annual Review 2019","title":"Harnessing hydropower potential in the Philippines","url":"https://communications.ghd.com/annualreview/2019/projects/hydro-project.html","url_status":"public","vintage":"2019","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S042","publisher":"JICA appendix (EIA report on Ambangal mini-hydropower project, landscape and visual assessment)","title":"Preparatory Survey ... Appendix A-236","url":"https://openjicareport.jica.go.jp/pdf/12114500_04.pdf","url_status":"public","vintage":"c.2008 (EIA excerpt), compiled 2013","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S043","publisher":"Rappler","title":"Dam projects face strong opposition in Kalinga","url":"https://www.rappler.com/philippines/luzon/dam-projects-strong-opposition-kalinga/","url_status":"public","vintage":"2022-10-10","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S044","publisher":"Bulatlat","title":"Tribes reject large dams in Balbalan and Pinukpuk, Kalinga","url":"https://www.bulatlat.org/2022/09/04/tribes-reject-large-dams-in-balbalan-and-pinukpuk-kalinga/","url_status":"public","vintage":"2022-09-04","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S045","publisher":"International Water Power & Dam Construction; SunStar 2017","title":"Philippine's Hydrocore plans Ibulao mini hydro","url":"https://www.waterpowermagazine.com/news/philippine-s-hydrocore-plans-ibulao-mini-hydro/","url_status":"public","vintage":"2007-10-02","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S046","publisher":"Baguio Herald Express","title":"Mini-hydro in Ifugao earns NCIP's nod","url":"https://baguioheraldexpressonline.com/mini-hydro-in-ifugao-earns-ncips-nod/","url_status":"public","vintage":"2020-03-13","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S047","publisher":"Board of Investments","title":"BOI greenlights Php185-M Ifugao hydropower plant","url":"https://boi.gov.ph/boi-greenlights-php185-m-ifugao-hydropower-plant-to-cater-to-rising-electricity-demand-in-luzon/","url_status":"public","vintage":"2022-03-18","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S048","publisher":"Alternergy (reposting GUGLER Water Turbines)","title":"Philippines - new major contract for GUGLER","url":"https://www.alternergy.com/post/philippines-new-major-contract-for-gugler","url_status":"public","vintage":"2021-11-29","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S049","publisher":"Alternergy","title":"17.4 MW Kiangan Run-of-River Hydro Project","url":"https://www.alternergy.com/kiangan-hydro-power","url_status":"public","vintage":"accessed 2026-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S050","publisher":"Alternergy Holdings Corp.","title":"Amended Preliminary Prospectus (14 Feb 2023)","url":"https://941b1631-8e7e-4428-9e88-9ceb26b44e2d.usrfiles.com/ugd/941b16_52843166fef846d68ca15f26bbd2e449.pdf","url_status":"public","vintage":"2023-02-14","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S051","publisher":"Alternergy","title":"6.8 MW Lamut Asipulo Run-of-River Hydro Project","url":"https://www.alternergy.com/lamut-asipulo-hydro","url_status":"public","vintage":"accessed 2026-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S052","publisher":"Highland Tribune","title":"Raising the bar: Part 2 - Benguet towns to partner with Beneco for sustainable power supply","url":"https://highlandtribune.com/feature/raising-the-bar-benguet-towns-will-be-partners-of-beneco/","url_status":"public","vintage":"2022-12-04","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S053","publisher":"BENECO","title":"BENECO Appeals for Proper Waste Disposal at Man-asok","url":"https://www.beneco.com.ph/article.php?id=130","url_status":"public","vintage":"c.2024","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S054","publisher":"SunStar Baguio","title":"Tublay IPs reject hydro project","url":"https://www.sunstar.com.ph/baguio/local-news/tublay-ips-reject-hydro-project","url_status":"public","vintage":"2018-12-18","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S055","publisher":"DOE REMB","title":"Hydropower projects under FIT system (for conversion from pre-development) as of June 21, 2013","url":"https://prod-cms.doe.gov.ph/documents/d/remb/fit_hydropower_13_06-21","url_status":"public","vintage":"2013-06-21","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S056","publisher":"Philippine News Agency","title":"1.35 MW hydroelectric plant launched in Pangasinan town","url":"https://www.pna.gov.ph/articles/1146493","url_status":"public","vintage":"2021-07-08","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S057","publisher":"Philippine Information Agency","title":"Establishing hydropower plants: Way to reduce energy crisis","url":"https://mirror.pia.gov.ph/features/2021/07/13/establishing-hydropower-plants-way-to-reduce-energy-crisis","url_status":"public","vintage":"2021-07-13","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S058","publisher":"BusinessMirror","title":"Power Beacon allots P750M for hydro plant","url":"https://businessmirror.com.ph/2022/04/25/power-beacon-allots-%E2%82%A7750m-for-hydro-plant/","url_status":"public","vintage":"2022-04-25","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S059","publisher":"Inquirer Business","title":"Power Beacon earmarks P3.9B for renewables","url":"https://business.inquirer.net/346377/power-beacon-earmarks-p3-9b-for-renewables","url_status":"public","vintage":"2022-04-25","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S060","publisher":"BusinessWorld","title":"Power Beacon starts hydropower construction in Pangasinan","url":"https://bworldonline.com/corporate/2022/04/25/444188/power-beacon-starts-hydropower-construction-in-pangasinan/","url_status":"public","vintage":"2022-04-24","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S061","publisher":"CMC Ravenna","title":"Casecnan Multipurpose Power Project","url":"https://cmcgruppo.com/en/progetti/casecnan-multipurpose-power-project/","url_status":"public","vintage":"accessed 2026-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S062","publisher":"Knight Piesold (design engineer)","title":"150 MW Casecnan Multi-Purpose Hydroelectric Project","url":"https://knightpiesold.com/en/projects/150-mw-casecnan-multi-purpose-hydroelectric-project/","url_status":"public","vintage":"accessed 2026-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S063","publisher":"CE Casecnan Water and Energy Co (SEC Form 10-K)","title":"Form 10-K for FY1996","url":"https://www.sec.gov/Archives/edgar/data/1006402/0001006402-97-000006.txt","url_status":"public","vintage":"1997-03-28","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S064","publisher":"CE Casecnan Water and Energy Co","title":"Form 10-K FY2006","url":"https://www.sec.gov/Archives/edgar/data/1006402/000108131607000003/cecasecnan10k2006.htm","url_status":"public","vintage":"2007-02-08","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S065","publisher":"CE Casecnan Water and Energy Co","title":"Form 10-K FY2009 and FY2006 (operating data)","url":"https://www.sec.gov/Archives/edgar/data/1006402/000108131610000003/cecasecnan.htm","url_status":"public","vintage":"2010-02-23","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S066","publisher":"Repower Energy Development Corp (SEC Form 17-A, incorporating prospectus technical summaries)","title":"REDC Annual Report 2024 (SEC 17-A) - Summary of the Feasibility Study for the Majayjay MHP","url":"https://repowerenergy.com.ph/assets/files/investor-relations/sec-forms/annual-reports/REDC_ANNUAL_REPORT_2024_FINAL.pdf","url_status":"public","vintage":"2025-05","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S067","publisher":"JICA / TEPSCO for DOE & NIA","title":"Preparatory Survey for Mini-Hydropower Development in the Philippines (Micro/Mini Hydropower Project in the Province of Isabela (Irrigation Canal)) Final Report","url":"https://openjicareport.jica.go.jp/pdf/12113890.pdf","url_status":"public","vintage":"2013-03","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S068","publisher":"PEMC / WESM Technical Committee","title":"Study on Luzon Hydroelectric Power Plants","url":"https://www.wesm.ph/downloads/download/TWFya2V0IFJlcG9ydHM=/NDkz","url_status":"public","vintage":"2013-12","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S069","publisher":"Philstar","title":"First hydropower plant in Panay to start Aug","url":"https://www.philstar.com/business/2013/04/10/928817/first-hydropower-plant-panay-start-aug","url_status":"public","vintage":"2013-04-10","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S070","publisher":"Philstar","title":"Sunwest inks P1-B project financing deal with BDO","url":"https://www.philstar.com/business/2013/04/29/936050/sunwest-inks-p1-b-project-financing-deal-bdo","url_status":"public","vintage":"2013-04-29","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S071","publisher":"Magis Energy Holdings","title":"Taft Hydro Energy","url":"https://magisenergyholdings.com/projects/taft-hydro/","url_status":"public","vintage":"c.2023","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S072","publisher":"Taft Hydro Energy Corp","title":"About - Taft Hydro","url":"https://www.tafthydro.com/about.html","url_status":"public","vintage":"c.2019-2021","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S073","publisher":"ERC","title":"ERC Case No. 2024-155 RC Notice of Virtual Hearing","url":"https://assets.zyrosite.com/YBgEKj0aGxC0XpDk/promulgated-0399-2025-nvh-2024-155-rc-04march2025-mxB45eJ4kpC27EKB.pdf","url_status":"public","vintage":"2025-03-04","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S074","publisher":"Magis Energy Holdings","title":"Projects","url":"https://magisenergyholdings.com/projects/","url_status":"public","vintage":"c.2023","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S075","publisher":"International Water Power & Dam Construction","title":"Oriental Peninsula to buy stake in Philippines hydro plant","url":"https://www.waterpowermagazine.com/news/oriental-peninsula-to-buy-stake-in-philippines-hydro-plant/","url_status":"public","vintage":"2009-12-23","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S076","publisher":"Development Bank of the Philippines","title":"DBP inks P2 billion loan deal with RE firm","url":"https://www.dbp.ph/newsroom/dbp-inks-p2-billion-loan-deal-with-re-firm/","url_status":"public","vintage":"2018-08-28","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S077","publisher":"Philstar (citing PSALM)","title":"Bidding for small hydroelectric power plant fails","url":"https://www.philstar.com/business/2008/07/28/75755/bidding-small-hydroelectric-power-plant-fails","url_status":"public","vintage":"2008-07-28","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S078","publisher":"Visayan Daily Star; Basic Energy (1961)","title":"DAILY STAR: Business 2009-01-13","url":"https://archives.visayandailystar.com/2009/January/13/businessnews1.htm","url_status":"public","vintage":"2009-01-13","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S079","publisher":"CREA Hydro&Energy (Czech consultant)","title":"Mini hydropower plant Sevilla, Philippines 2006-2008","url":"http://www.creacz.com/index.php/en/mini-hydropower-plant-sevilla-philippines-2006-2008/","url_status":"public","vintage":"c.2009","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S080","publisher":"Energies (MDPI) 2022, 15(3), 1130 — Torrefranca et al.","title":"Incorporating Landscape Dynamics in Small-Scale Hydropower Site Location ... Bohol","url":"https://www.mdpi.com/1996-1073/15/3/1130","url_status":"public","vintage":"2022-02-03","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S081","publisher":"PSALM","title":"A tale of two hydroelectric plants","url":"https://www.psalm.gov.ph/viewnews/viewn/20060031","url_status":"public","vintage":"2006-04-19","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S082","publisher":"DOE","title":"List of Existing Power Plants (Grid-connected) as of 30 November 2025 - Visayas Grid","url":"https://prod-cms.doe.gov.ph/documents/d/guest/02-visayas-pdf","url_status":"public","vintage":"2025-11-30","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S083","publisher":"Visayan Daily Star","title":"DAILY STAR Top Stories 2015-06-04","url":"https://archives.visayandailystar.com/2015/June/04/topstory6.htm","url_status":"public","vintage":"2015-06-04","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S084","publisher":"Visayan Daily Star (Silay City press release)","title":"Vivant Corp., Silay tie-up for hydro power project","url":"https://archives.visayandailystar.com/2012/October/25/businessnews2.htm","url_status":"public","vintage":"2012-10-25","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S085","publisher":"Philstar (Vivant PSE disclosure)","title":"Vivant unit to build Negros plant","url":"https://www.philstar.com/business/2015/02/06/1420548/vivant-unit-build-negros-plant","url_status":"public","vintage":"2015-02-06","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S086","publisher":"DOE","title":"Awarded Hydropower Projects as of 31 May 2025","url":"https://prod-cms.doe.gov.ph/documents/d/guest/a-6-awarded-hydropower-pdf","url_status":"public","vintage":"2025-05-31","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S087","publisher":"Leyte Samar Daily News; NEA; Calbayog Journal","title":"Hydropower plant back in operation in E. Samar","url":"https://www.leytesamardailynews.com/hydropower-plant-back-in-operation-in-e-samar/","url_status":"public","vintage":"2024-02-27","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S088","publisher":"DOE","title":"Visayas Committed Power Projects as of 31 October 2025","url":"https://prod-cms.doe.gov.ph/documents/d/guest/02-visayas-committed-5-pdf","url_status":"public","vintage":"2025-10-31","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S089","publisher":"DOE","title":"Awarded Hydropower Projects as of 30 June 2020","url":"https://www.evoss.ph/Home/Download/4224","url_status":"public","vintage":"2020-06-30","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S090","publisher":"Philstar (citing JWPI public scoping documents)","title":"JWPI to invest $350 million in Cebu hydropower plant","url":"https://www.philstar.com/business/2022/07/04/2192772/jwpi-invest-350-million-cebu-hydropower-plant","url_status":"public","vintage":"2022-07-04","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S091","publisher":"Negros Now Daily","title":"SP supports Sagay's 4MW hydro power dev't project","url":"https://negrosnowdaily.com/sp-supports-sagays-4mw-hydro-power-devt-project/","url_status":"public","vintage":"2025-09-02","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S092","publisher":"SunStar Davao","title":"Tudaya plants operation boosts DLPC, Dasureco power supply","url":"https://www.sunstar.com.ph/more-articles/tudaya-plants-operation-boosts-dlpc-dasureco-power-supply","url_status":"public","vintage":"2014-05-13","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S093","publisher":"Joint Crediting Mechanism (Japan-Philippines) / Toyota Tsusho, Alsons","title":"JCM Project Design Document PH006 (draft v1.0)","url":"https://www.jcm.go.jp/jc/wp-content/uploads/sites/3/JCM_PH006_PDD_draft.pdf","url_status":"public","vintage":"2024-11-27","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S094","publisher":"PSE EDGE disclosure, REDC","title":"REDC Inaugurates Php 4B Pulangi Hydropower Plant in Bukidnon","url":"https://edge.pse.com.ph/downloadHtml.do?file_id=1846463","url_status":"public","vintage":"2025","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S095","publisher":"EDCOP (engineering consultant)","title":"Lake Mainit Hydropower Project","url":"https://edcop.ph/projects/lake-mainit-hydropower-project/","url_status":"public","vintage":"2023-06-08","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S096","publisher":"J-POWER (Electric Power Development Co.)","title":"The Philippines: Lake Mainit Hydroelectric Power Plant Starts Commercial Operation (Attachment 1)","url":"https://www.jpower.co.jp/english/news_release/pdf/news230719e.pdf","url_status":"public","vintage":"2023-07-19","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S097","publisher":"EDCOP (DED consultant; EPC Sta. Clara International)","title":"DED of 12 MW Mangima Hydroelectric Power Plant Project","url":"https://edcop.ph/projects/ded-of-12-mw-mangima-hydroelectric-power-plant-project-22-04-1210-ded-of-12-mw-mangima-hydroelectric-power-plant-project/","url_status":"public","vintage":"2022-05","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S098","publisher":"ERC application (ANECO / AGEC), copy on Scribd","title":"ERC Case No. 2014-063 RC Application for approval of PPA between ANECO and AGEC","url":"https://www.scribd.com/document/371907777/Applicationno-2014-063rc-Aneco-Agec","url_status":"public","vintage":"2014","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S099","publisher":"Mindanao Gold Star Daily","title":"El Nino may cut Agusan hydro plant output in 2027","url":"https://mindanaogoldstardaily.com/el-nino-may-cut-agusan-hydro-plant-output-in-2027","url_status":"public","vintage":"2026-10-05","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S100","publisher":"Euro Hydro Power (Asia) Holdings, Inc.","title":"2.4 MW New Bataan Mini Hydroelectric Generation Facility","url":"https://eurohydropower.com/new-bataan-gallery/","url_status":"public","vintage":"2019-06-30","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S101","publisher":"Euro Hydro Power (Asia) Holdings, Inc.","title":"2.83 MW Alamada Mini Hydroelectric Generation Facility","url":"https://eurohydropower.com/1551-2/","url_status":"public","vintage":"2019-06-30","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S102","publisher":"Euro Hydro Power (Asia) Holdings, Inc.","title":"3.6 MW Titunod Mini Hydroelectric Generation Facility","url":"https://eurohydropower.com/3-6-mw-titunod-mini-hydroelectric-generation-facility/","url_status":"public","vintage":"undated","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S103","publisher":"Hydro Review (HCI) / authors from Hedcor Inc. (Macabiog, Rodero, Malicay, Barcena)","title":"Every Drop Counts - Is It Possible? (Sibulan A and B)","url":"https://www.renewableenergyworld.com/hydro-power/dams-civil-structures/every-drop-counts-is-it-possible/","url_status":"public","vintage":"2012-09-01","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S104","publisher":"Stratbase ADRi (citing WawaJVCo 2020 EIS)","title":"A Tale of Two Dams: Kaliwa Dam and Upper Wawa Dam","url":"https://adrinstitute.org/wp-content/uploads/2023/10/a-tale-of-two-dams-transparency-and-governance-analysis-of-the-kaliwa-dam-project-and-upper-wawa-dam-project.pdf","url_status":"public","vintage":"2023-10","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S105","publisher":"MD&A (Malcolm Dunstan & Associates) RCC Dams database","title":"RCC Dams - Upper Wawa Dam","url":"http://www.rccdams.co.uk/dams/upper-wawa/","url_status":"public","vintage":"accessed 2026-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S106","publisher":"Prime Infrastructure Capital Inc.","title":"Water supply dam cited for reducing flood impact of Carina","url":"https://primeinfra.com/water-supply-dam-cited-for-reducing-flood-impact-of-carina/","url_status":"public","vintage":"2024-07-29","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S107","publisher":"Prime Infrastructure Capital Inc.","title":"Prime Infra's WawaJVCo ensures readiness of Upper Wawa Dam","url":"https://primeinfra.com/prime-infras-wawajvco-ensures-readiness-of-upper-wawa-dam-ahead-of-scheduled-commercial-operations-2/","url_status":"public","vintage":"2025-06-20","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S108","publisher":"Strategic Power Development Corp / Philkairos Inc (Project Description for EIA scoping, DENR-EMB; Wayback copy)","title":"Proposed 300 MW Aklan Pumped-Storage Hydropower Project - Project Description","url":"http://web.archive.org/web/20210716id_/http://eia.emb.gov.ph/wp-content/uploads/2021/07/Project-Description-SPDC_AKLAN-HYDRO_PD.pdf","url_status":"public","vintage":"2021-07","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S109","publisher":"Pan Pacific Renewable Power Phils Corp (EIS for public hearing, DENR-EMB)","title":"Project Description for Scoping, Gened-2 HPP (r1)","url":"http://web.archive.org/web/20210812id_/http://eia.emb.gov.ph/wp-content/uploads/2020/11/Project-Description-for-Scoping_Gened-2_r1.pdf","url_status":"public","vintage":"2020-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S110","publisher":"San Lorenzo Ruiz Builders & Developers, Inc.","title":"SLRB Renewable Energy Projects (as of January 2021)","url":"https://sanlorenzoruiz.com/renewableenergy.php","url_status":"public","vintage":"2021-01","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S111","publisher":"Global Energy Monitor (wiki)","title":"Chico hydroelectric plant","url":"https://www.gem.wiki/Chico_hydroelectric_plant","url_status":"public","vintage":"accessed 2026-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S112","publisher":"SunStar","title":"Lubuagan eyed for hydro project","url":"https://www.sunstar.com.ph/more-articles/lubuagan-eyed-for-hydro-project","url_status":"public","vintage":"2018-02-14","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S113","publisher":"PhKule (citing Cordillera Peoples Alliance)","title":"Daniel Peckley, Engineer Whose Project Threatens IP Groups, Becomes UP VP for Development","url":"https://phkule.org/article/1150/daniel-peckley-engineer-whose-project-threatens-ip-groups-becomes-up-vp-for-development/","url_status":"public","vintage":"2024-03-18","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S114","publisher":"Mongabay","title":"'The river will bleed red': Indigenous Filipinos face down dam projects","url":"https://news.mongabay.com/2021/02/the-river-will-bleed-red-indigenous-filipinos-face-down-dam-projects/","url_status":"public","vintage":"2021-02-26","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S115","publisher":"Northern Dispatch","title":"Viable power sources seen in Kalinga","url":"https://nordis.net/news/2005/ndw050925/ndw050925_10powersources.htm","url_status":"public","vintage":"2005-09-25","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S116","publisher":"Radyo Sagada","title":"What is the Apayao Hydroelectric Project and how does it work?","url":"https://radyosagada.com/apayao-1/","url_status":"public","vintage":"2026-10-14","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S117","publisher":"Rappler","title":"Dam projects to swallow sacred grounds of Cordillera's river people","url":"https://www.rappler.com/philippines/dam-projects-swallow-sacred-grounds-isnag-river-people-cordillera/","url_status":"public","vintage":"2022-01-15","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S118","publisher":"Power Technology (GlobalData plant profile)","title":"Power plant profile: Kabayan 2, Philippines","url":"https://www.power-technology.com/marketdata/power-plant-profile-kabayan-2-philippines/","url_status":"public","vintage":"2022-01-05","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S119","publisher":"Cordillera dams briefing (IRN-hosted), citing NPC study","title":"Cordillera dams (CordiDams) - Hydro projects 10 MW and larger considered for implementation in the Cordillera as of 2000","url":"https://www.irn.org/files/programs_2Fsanroque_2F/021214.corddams.pdf","url_status":"public","vintage":"c.2002","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S120","publisher":"Northern Philippine Times","title":"Ifugao folk consulted on dam","url":"http://northphiltimes.blogspot.com/2008/09/more-news-ifugao_30.html","url_status":"public","vintage":"2008-09-30","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S121","publisher":"DOE","title":"Awarded Hydropower Projects as of 31 May 2026","url":"https://prod-cms.doe.gov.ph/documents/d/guest/awarded-hydropower-1-pdf","url_status":"public","vintage":"2026-05-31","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S122","publisher":"Philippine Star","title":"Casecnan Dam builder eyes P5-B river project in Nueva Ecija","url":"https://philstar.com/business/2006/04/10/330819/casecnan-dam-builder-eyes-p5-b-river-project-nueva-ecija","url_status":"public","vintage":"2006-04-10","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S123","publisher":"World Bank (Rural Power Project Additional Financing EA Vol.3)","title":"Colasi river mini hydro plant, comprehensive feasibility study","url":"https://documents1.worldbank.org/curated/en/381081468333624612/pdf/E19920v30P113111EA1P113159001Vol031.pdf","url_status":"public","vintage":"2003-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S124","publisher":"DENR-EMB Region V (via World Bank EA Vol.4)","title":"Certificate of non-coverage for the proposed Colasi Falls Mini-Hydro Project","url":"https://documents1.worldbank.org/curated/en/346901468298751567/text/E19920v40P11311P1EA1P11315901Vol041.txt","url_status":"public","vintage":"2005-01-14","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S125","publisher":"Magis Energy Holdings","title":"Upper Taft Hydro","url":"https://magisenergyholdings.com/projects/upper-taft-hydro/","url_status":"public","vintage":"c.2023","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S126","publisher":"JICA / NEWJEC (for DOE)","title":"The Study Project on Resource Inventory on Hydropower Potential in the Philippines, Final Report, Chapter 5","url":"https://openjicareport.jica.go.jp/pdf/12057493_06.pdf","url_status":"public","vintage":"c.2012","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S127","publisher":"Visayan Daily Star (citing Alsons briefer)","title":"DAILY STAR 2015-06-04 / 2015-06-26","url":"https://archives.visayandailystar.com/2015/June/26/businessnews1.htm","url_status":"public","vintage":"2015-06","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S128","publisher":"JICA / NEWJEC","title":"Study Project on Resource Inventory on Hydropower Potential in the Philippines - 'JICA Potential Site with Site Reconnaissance' sheets","url":"https://openjicareport.jica.go.jp/pdf/12057485_12.pdf","url_status":"public","vintage":"2012","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S129","publisher":"JICA / NEWJEC","title":"Study Project on Resource Inventory on Hydropower Potential in the Philippines - 'JICA Potential Site with Site Reconnaissance' sheets","url":"https://openjicareport.jica.go.jp/pdf/12057485_13.pdf","url_status":"public","vintage":"2012","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S130","publisher":"JICA / NEWJEC","title":"Study Project on Resource Inventory on Hydropower Potential in the Philippines - 'JICA Potential Site with Site Reconnaissance' sheets","url":"https://openjicareport.jica.go.jp/pdf/12057485_14.pdf","url_status":"public","vintage":"2012","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S131","publisher":"Philkoei International (NIA consultant)","title":"Bohol Irrigation Project (Phase II)","url":"https://www.philkoei.com.ph/project/bohol-irrigation-project-phase-ii/","url_status":"public","vintage":"c.2008","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S132","publisher":"PIA (citing NIA-7)","title":"NIA: Bohol dams can sustain irrigation for 5,000 hectares despite El Nino alert","url":"https://pia.gov.ph/news/nia-bohol-dams-can-sustain-irrigation-for-5000-hectares-despite-el-nino-alert/","url_status":"public","vintage":"2026-05-26","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S133","publisher":"JICA / IRRI","title":"Impact Evaluation of the Bohol Irrigation Project (Phase 2)","url":"https://openjicareport.jica.go.jp/pdf/1000008651.pdf","url_status":"public","vintage":"2012-03","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S134","publisher":"DENR-EMB Region XI / Volga Power Corporation (Galerio Environmental Consultancy)","title":"Caraga A1 Mini-Hydropower Plant Project - Project Description for Scoping","url":"https://r11.emb.gov.ph/wp-content/uploads/2020/11/Caraga-A1_PDS-FINAL.pdf","url_status":"public","vintage":"2020-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S135","publisher":"DENR-EMB Region XI / Caraga A3 Hydro Power Corporation (Galerio)","title":"Caraga A3 Hydroelectric Power Project draft Environmental Impact Statement","url":"https://r11.emb.gov.ph/wp-content/uploads/2022/02/draft-EIS-CARAGA-A3.pdf","url_status":"public","vintage":"2022-02","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S136","publisher":"DENR-EMB Region XI / Volga Power Corporation (Galerio)","title":"Caraga A3 Mini-Hydropower Plant - Project Description for Scoping","url":"https://r11.emb.gov.ph/wp-content/uploads/2020/11/Caraga-A3_PDS-FINAL.pdf","url_status":"public","vintage":"2020-11","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S137","publisher":"ANDRITZ Hydro","title":"Hydro News Asia - Philippines","url":"https://www.andritz.com/resource/blob/342538/0afe288cc33d3ec54454c2a22f20b47c/12-philippines-data.pdf","url_status":"public","vintage":"2020","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S138","publisher":"A.L.G. Cisneros, Cor Jesu College (JFIT conference poster)","title":"Environmental Flow Assessment of Manolo Fortich Hydro-electric Power System","url":"https://jfit-for-science.asia/wp-content/uploads/2019/11/Environmental-Flow-Assessment-of-Manolo-Fortich-Hydro-Electric-Power-System.pdf","url_status":"public","vintage":"2019","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S139","publisher":"DENR-EMB Region 10 / FGEN San Isidro Hydro Power Corp. (GHD)","title":"Environmental Impact Statement, San Isidro Hydro Power Project (Draft C) - Exec Summary to Project Description","url":"https://r10.emb.gov.ph/wp-content/uploads/2023/03/1.-REP_12519450_ES-to-PD_.pdf","url_status":"public","vintage":"2022-11-29","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S140","publisher":"DENR-EMB Region 10 / FGEN San Isidro Hydro Power Corp. (GHD)","title":"EIS San Isidro HPP, Section 2.2 Water","url":"https://r10.emb.gov.ph/wp-content/uploads/2023/03/3.-REP_12519450_Water-to-Air.pdf","url_status":"public","vintage":"2022-11-29","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S141","publisher":"JICA / Chodai Co., Ltd. et al.","title":"Feasibility Study on WAWA River Mini-hydro Power Project in the Province of Agusan del Sur (PPP Infrastructure Project) Final Report","url":"https://openjicareport.jica.go.jp/pdf/12267407_01.pdf","url_status":"public","vintage":"2016-05","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S142","publisher":"Power Technology (Verdict Media)","title":"Sibulan Hydroelectric Power Project","url":"https://www.power-technology.com/projects/sibulan-hydroelectri/","url_status":"public","vintage":"2011-05-23","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S143","publisher":"EDCOP","title":"8.4MW Maladugao HEPP","url":"https://edcop.ph/projects/8-4mw-maladugao-hepp/","url_status":"public","vintage":"2022-10","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S144","publisher":"Wikipedia","title":"Agusan Dam","url":"https://en.wikipedia.org/wiki/Agusan_Dam","url_status":"public","vintage":"2026-10-30","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S145","publisher":"Philippine News Agency","title":"2 hydroelectric power plants eyed in Bukidnon","url":"https://www.pna.gov.ph/articles/1036894","url_status":"public","vintage":"2018","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S146","publisher":"Alsons Power Group","title":"Alsons Power's Siayan Hydro Aids Stranded Residents of Siayan Zamboanga del Norte","url":"https://alsonspower.com/alsons-powers-siayan-hydro-aids-stranded-residents-of-siayan-zamboanga-del-norte/","url_status":"public","vintage":"2020-09-21","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S147","publisher":"Basic Energy Corporation (news release)","title":"Basic Energy Corporation, Spanish firm to develop hydropower projects in PHL","url":"https://www.basicenergy.ph/news/basic-energy-corporation-spanish-firm-to-develop-hydropower-projects-in-phl/","url_status":"public","vintage":"2014-07-23","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S148","publisher":"DOE Electric Power Industry Management Bureau (EPIMB)","title":"List of Existing Power Plants (Off-Grid) as of 30 April 2026","url":"https://d24qbtp4vooyzi.cloudfront.net/api/media/file/List%20of%20Existing%20Power%20Plants%20Off-Grid%20as%20of%2030%20April%202026.pdf?prefix=dev%2Fmedia","url_status":"public","vintage":"2026-04-30","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S149","publisher":"Apercu Consultants (EIS consultant)","title":"Environmental Impact Statement for the Alimit Hydroelectric Power Plant (Alimit HEPP, 2019)","url":"https://apercu.biz/environmental-impact-statement-for-the-alimit-hydroelectric-power-plant-alimit-hepp-2019/","url_status":"public","vintage":"2019","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V10S150","publisher":"Belisama Hydropower Corp (Draft EIS submitted to DENR-EMB; Wayback copy of eia.emb.gov.ph)","title":"EIS Executive Summary for Public Hearing (English), 800MW Belisama PSP","url":"http://web.archive.org/web/2023id_/http://eia.emb.gov.ph/wp-content/uploads/2022/10/English-Version-EIS-ES-for-PUBLIC-HEARING-BHC-Concise-Ver-Oct17-1.pdf","url_status":"public","vintage":"2022-10-17","quality":"Primary/secondary as described in title; V10 worker extraction","accessed":"2026-11-12"},{"id":"V11S001","publisher":"FDC Renewables Corporation / GHD; DENR-EMB Region I host","title":"Project Description for Scoping: 33.4 MW Pampang Hydroelectric Power Project","url":"https://r1.emb.gov.ph/wp-content/uploads/2023/09/Project-Description-for-Scoping-for-the-33.4MW-Pampang-HPP-of-FDC-Renewables-Corporation-3-1.pdf","url_status":"public","vintage":"2023-08-18","quality":"2023 proposed 33.4 MW design, not as-built. Baseline DOE potential is 26 MW; identity is anchored to the exact HSC, developer, river and component locations, not capacity alone. Extraction is cached full primary-source text; direct PDF unavailable. Structural height is riverbed-to-crest, not foundation-to-crest.","accessed":"2026-11-12"},{"id":"V11S002","publisher":"Sta. Clara International Corporation, civil contractor","title":"Renewable Energy Power Plants: 17.8 MW Kiangan Mini Hydro Project","url":"https://staclara.com.ph/what-we-do/ongoing/renewable-energy-power-plants/","url_status":"public","vintage":"Undated; retrieved 2026-11-12","quality":"Source explicitly labels 20.2 m h. Height datum (riverbed/foundation) not specified; construction/design portfolio, not a verified as-built measurement. Component evidence only: combined Asin-Hungduan asset has two separate weirs. Do not select either value as a unique original-row R or sum their heights. Plan dimensions and width are not interpreted as crest length. Aggregate 17.8 MW portfolio capacity differs from 17.4 MW combined baseline awards; component identity established by exact developer, paired scheme and barangays.","accessed":"2026-11-12"},{"id":"V11S003","publisher":"Global Energy Monitor","title":"South Pulangi hydroelectric plant","url":"https://www.gem.wiki/South_Pulangi_hydroelectric_plant","url_status":"public","vintage":"Snapshot revision dates disagree: live web retrieval 2026-11-11 17:06; Exa cached 2026-10-16. Accessed 2026-11-12; point agrees.","quality":"Source-specified approximate plant reference, not surveyed dam/intake/powerhouse. Bounds for the documented project municipalities are provided separately as a search region, not error bounds. Direct HTTP download returned 403; source content verified through web retrieval, local HTML is an access-failure response rather than page content.","accessed":"2026-11-12"},{"id":"V11_GB_ADM2","publisher":"geoBoundaries / NAMRIA, PSA, OCHA Philippines","title":"Philippines Provinces simplified boundaries","url":"https://www.geoboundaries.org/api/current/gbOpen/PHL/ADM2/","url_status":"public","vintage":"Jul 05, 2023","quality":"Creative Commons Attribution 3.0 Intergovernmental Organisations (CC BY 3.0 IGO)","accessed":null},{"id":"V11_GB_ADM3","publisher":"geoBoundaries / NAMRIA, PSA, OCHA Philippines","title":"Philippines Municipalities simplified boundaries","url":"https://www.geoboundaries.org/api/current/gbOpen/PHL/ADM3/","url_status":"public","vintage":"Dec 12, 2023","quality":"Creative Commons Attribution 3.0 Intergovernmental Organisations (CC BY 3.0 IGO)","accessed":null}]