[{"project_id":"NGCP-2026-5.1-001","edition":2026,"table":"5.1","printed_page":53,"region":"Luzon","name":"Bataan – Cavite Transmission Line Feasibility Study","location_report":"Bataan, Cavite","table_horizon":"2026-2030","reported_ETC":"To be assessed","regulatory_status":"ERC-Approved","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-002","edition":2026,"table":"5.1","printed_page":53,"region":"Luzon","name":"Western Luzon 500 kV Backbone (Stage 2)","location_report":"Pangasinan, Zambales","table_horizon":"2026-2030","reported_ETC":"Oct 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-003","edition":2026,"table":"5.1","printed_page":53,"region":"Luzon","name":"Relocation of Steel Poles along Hermosa – Duhat 230 kV Transmission Line","location_report":"Bataan","table_horizon":"2026-2030","reported_ETC":"Jul 2026","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-004","edition":2026,"table":"5.1","printed_page":53,"region":"Luzon","name":"Tuguegarao – Lal-lo 230 kV Transmission Line","location_report":"Cagayan","table_horizon":"2026-2030","reported_ETC":"Dec 2026","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-005","edition":2026,"table":"5.1","printed_page":54,"region":"Luzon","name":"Ambuklao – Binga 230 kV Transmission Line Upgrading Project","location_report":"Benguet","table_horizon":"2026-2030","reported_ETC":"Jun 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-006","edition":2026,"table":"5.1","printed_page":54,"region":"Luzon","name":"Binga – San Manuel 230 kV Transmission Line","location_report":"Benguet","table_horizon":"2026-2030","reported_ETC":"Dec 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-007","edition":2026,"table":"5.1","printed_page":54,"region":"Luzon","name":"Northern Luzon 230 kV Loop","location_report":"Ilocos Norte / Cagayan","table_horizon":"2026-2030","reported_ETC":"Aug 2031","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-008","edition":2026,"table":"5.1","printed_page":55,"region":"Luzon","name":"Clark – Mabiga 69 kV Transmission Line","location_report":"Pampanga","table_horizon":"2026-2030","reported_ETC":"Dec 2028","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-009","edition":2026,"table":"5.1","printed_page":55,"region":"Luzon","name":"Nagsaag – Tumana 69 kV Transmission Line","location_report":"Pangasinan","table_horizon":"2026-2030","reported_ETC":"Completed","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-010","edition":2026,"table":"5.1","printed_page":55,"region":"Luzon","name":"Eastern Albay 69 kV Line Stage 2","location_report":"Albay","table_horizon":"2026-2030","reported_ETC":"Jun 2028","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-011","edition":2026,"table":"5.1","printed_page":56,"region":"Luzon","name":"Concepcion – Sta. Ignacia 69 kV Transmission Line","location_report":"Tarlac","table_horizon":"2026-2030","reported_ETC":"Dec 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-012","edition":2026,"table":"5.1","printed_page":56,"region":"Luzon","name":"Tuy 500/230 kV Substation Project Stage 1","location_report":"Batangas, Cavite","table_horizon":"2026-2030","reported_ETC":"Jun 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-013","edition":2026,"table":"5.1","printed_page":56,"region":"Luzon","name":"Ilijan 500 kV Substation Upgrading","location_report":"Batangas","table_horizon":"2026-2030","reported_ETC":"Jun 2028","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-014","edition":2026,"table":"5.1","printed_page":57,"region":"Luzon","name":"Milaor 500 kV Substation Project","location_report":"Camarines Sur, Quezon","table_horizon":"2026-2030","reported_ETC":"Dec 2030","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-015","edition":2026,"table":"5.1","printed_page":57,"region":"Luzon","name":"Taguig 500 kV Substation Project","location_report":"Taguig","table_horizon":"2026-2030","reported_ETC":"Dec 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-016","edition":2026,"table":"5.1","printed_page":57,"region":"Luzon","name":"Marilao 500 kV Substation","location_report":"Bulacan","table_horizon":"2026-2030","reported_ETC":"Mar 2028","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-017","edition":2026,"table":"5.1","printed_page":58,"region":"Luzon","name":"Pinamucan 500 kV Substation","location_report":"Batangas","table_horizon":"2026-2030","reported_ETC":"Nov 2028","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-018","edition":2026,"table":"5.1","printed_page":58,"region":"Luzon","name":"Bolo 5th Bank","location_report":"Pangasinan","table_horizon":"2026-2030","reported_ETC":"Jun 2030","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-019","edition":2026,"table":"5.1","printed_page":58,"region":"Luzon","name":"Antipolo 230 kV Substation","location_report":"Rizal","table_horizon":"2026-2030","reported_ETC":"Dec 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-020","edition":2026,"table":"5.1","printed_page":59,"region":"Luzon","name":"North Luzon 230 kV Substation Upgrading","location_report":"La Union, Isabela, Nueva Vizcaya, Bataan, Quezon, Pangasinan, Bulacan","table_horizon":"2026-2030","reported_ETC":"Dec 2026","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-021","edition":2026,"table":"5.1","printed_page":59,"region":"Luzon","name":"Pinili 230 kV Substation","location_report":"Ilocos Norte","table_horizon":"2026-2030","reported_ETC":"Aug 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-022","edition":2026,"table":"5.1","printed_page":59,"region":"Luzon","name":"South Luzon 230 kV Substation Upgrading","location_report":"Laguna, Batangas, Albay, Quezon, Camarines Norte","table_horizon":"2026-2030","reported_ETC":"Dec 2028","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-023","edition":2026,"table":"5.1","printed_page":60,"region":"Luzon","name":"South Luzon 230 kV Substation Upgrading 2","location_report":"Batangas, Laguna, Quezon, Camarines Norte, Albay , Rizal, Metro Manila","table_horizon":"2026-2030","reported_ETC":"Dec 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-024","edition":2026,"table":"5.1","printed_page":60,"region":"Luzon","name":"Abuyog 230 kV Substation","location_report":"Sorsogon","table_horizon":"2026-2030","reported_ETC":"Dec 2028","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-025","edition":2026,"table":"5.1","printed_page":60,"region":"Luzon","name":"San Simon 230 kV Substation","location_report":"Pampanga","table_horizon":"2026-2030","reported_ETC":"Nov 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-026","edition":2026,"table":"5.1","printed_page":61,"region":"Luzon","name":"North Luzon 230 kV Substation Upgrading 2","location_report":"La Union, Ilocos Norte, Nueva Vizcaya, Isabela, Ilocos Sur, Pangasinan, Cagayan, Tarlac, Pampanga, Zambales, Nueva Ecija, Bataan","table_horizon":"2026-2030","reported_ETC":"Dec 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-027","edition":2026,"table":"5.1","printed_page":61,"region":"Luzon","name":"Luzon Connection Requirements for Power Plant Project 1","location_report":"Various provinces in Luzon","table_horizon":"2026-2030","reported_ETC":"Nov 2030","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-028","edition":2026,"table":"5.1","printed_page":62,"region":"Luzon","name":"Luzon Connection Requirements for Power Plant Project 3","location_report":"Various provinces in Luzon","table_horizon":"2026-2030","reported_ETC":"Jan 2030","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-029","edition":2026,"table":"5.1","printed_page":62,"region":"Luzon","name":"Luzon Voltage Improvement Project 3","location_report":"Aurora, Nueva Ecija, Pangasinan, Tarlac, Ilocos Sur, Zambales, Benguet","table_horizon":"2026-2030","reported_ETC":"Dec 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-030","edition":2026,"table":"5.1","printed_page":63,"region":"Luzon","name":"Luzon Voltage Improvement Project 4","location_report":"Sorsogon, Camarines Sur, Batangas, Albay, Cavite","table_horizon":"2026-2030","reported_ETC":"Dec 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-031","edition":2026,"table":"5.1","printed_page":63,"region":"Luzon","name":"Luzon Grid Reliability and Stability Support Project 1","location_report":"Laoag, Gamu, Santiago","table_horizon":"2026-2030","reported_ETC":"Dec 2029","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-032","edition":2026,"table":"5.1","printed_page":63,"region":"Luzon","name":"Laoag Power Quality Improvement Project","location_report":"Laoag","table_horizon":"2026-2030","reported_ETC":"Nov 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-033","edition":2026,"table":"5.1","printed_page":63,"region":"Luzon","name":"Palawan – Mindoro Interconnection Project (Stage 1)","location_report":"Palawan, Mindoro","table_horizon":"2026-2030","reported_ETC":"Jul 2029","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.1-034","edition":2026,"table":"5.1","printed_page":64,"region":"Luzon","name":"Batangas – Mindoro 500 kV Interconnection & Backbone Project","location_report":"Batangas, Mindoro","table_horizon":"2026-2030","reported_ETC":"Stage 1: Oct 2029 Stage 2: Jun 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-001","edition":2026,"table":"5.2","printed_page":66,"region":"Luzon","name":"Bolo – Balaoan 500 kV Transmission Line","location_report":"La Union, Pangasinan","table_horizon":"2031-2040","reported_ETC":"Aug 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-002","edition":2026,"table":"5.2","printed_page":66,"region":"Luzon","name":"Balaoan – Laoag (Burgos) 500 kV Transmission Line","location_report":"La Union, Ilocos Norte","table_horizon":"2031-2040","reported_ETC":"Mar 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-003","edition":2026,"table":"5.2","printed_page":66,"region":"Luzon","name":"Pagbilao – Tayabas 500 kV Transmission Line","location_report":"Quezon Province","table_horizon":"2031-2040","reported_ETC":"Jun 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-004","edition":2026,"table":"5.2","printed_page":67,"region":"Luzon","name":"Taguig – Silang 500 kV Transmission Line","location_report":"Cavite, Metro Manila","table_horizon":"2031-2040","reported_ETC":"Jun 2038","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-005","edition":2026,"table":"5.2","printed_page":67,"region":"Luzon","name":"Nagsaag – Santiago 500 kV Transmission Line","location_report":"Isabela, Pangasinan","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-006","edition":2026,"table":"5.2","printed_page":67,"region":"Luzon","name":"Pinamucan – Tuy 500 kV Transmission Line","location_report":"Batangas","table_horizon":"2031-2040","reported_ETC":"Jun 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-007","edition":2026,"table":"5.2","printed_page":68,"region":"Luzon","name":"Santiago – Kabugao 500 kV Transmission Line","location_report":"Kabugao","table_horizon":"2031-2040","reported_ETC":"Sep 2036","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-008","edition":2026,"table":"5.2","printed_page":68,"region":"Luzon","name":"Santiago – Magat 230 kV Transmission Line Reconductoring","location_report":"Isabela","table_horizon":"2031-2040","reported_ETC":"Aug 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-009","edition":2026,"table":"5.2","printed_page":68,"region":"Luzon","name":"Taguig – Taytay 230 kV Transmission Line","location_report":"Rizal","table_horizon":"2031-2040","reported_ETC":"Jun 2037","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-010","edition":2026,"table":"5.2","printed_page":69,"region":"Luzon","name":"Marilao – Mexico 230 kV Transmission Line","location_report":"Pampanga, Bulacan","table_horizon":"2031-2040","reported_ETC":"Jun 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-011","edition":2026,"table":"5.2","printed_page":69,"region":"Luzon","name":"Navotas – Doña Imelda 230 kV Transmission Line","location_report":"Metro Manila","table_horizon":"2031-2040","reported_ETC":"Dec 2037","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-012","edition":2026,"table":"5.2","printed_page":69,"region":"Luzon","name":"Cabanatuan – Sampaloc – Nagsaag 230 kV Transmission Line","location_report":"Nueva Ecija, Pangasinan","table_horizon":"2031-2040","reported_ETC":"Jun 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-013","edition":2026,"table":"5.2","printed_page":70,"region":"Luzon","name":"Tower Resiliency of Bicol Transmission Facilities","location_report":"Camarines Sur, Camarines Norte, Albay, Sorsogon","table_horizon":"2031-2040","reported_ETC":"Jun 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-014","edition":2026,"table":"5.2","printed_page":70,"region":"Luzon","name":"Bauang – La Trinidad 230 kV Transmission Line Upgrading","location_report":"La Union, Benguet","table_horizon":"2031-2040","reported_ETC":"Jul 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-015","edition":2026,"table":"5.2","printed_page":70,"region":"Luzon","name":"San Jose – San Rafael 230 kV Transmission Line Upgrading Project","location_report":"Bulacan","table_horizon":"2031-2040","reported_ETC":"Jan 2038","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-016","edition":2026,"table":"5.2","printed_page":70,"region":"Luzon","name":"Santiago – Gamu 230 kV Transmission Line Reconductoring Project","location_report":"Isabela","table_horizon":"2031-2040","reported_ETC":"Nov 2037","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-017","edition":2026,"table":"5.2","printed_page":71,"region":"Luzon","name":"Tuguegarao – Enrile 69 kV Transmission Line","location_report":"Tuguegarao","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-018","edition":2026,"table":"5.2","printed_page":71,"region":"Luzon","name":"Daraga – Bitano 69 kV Transmission Line","location_report":"Albay","table_horizon":"2031-2040","reported_ETC":"Mar 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-019","edition":2026,"table":"5.2","printed_page":71,"region":"Luzon","name":"La Trinidad – Calot 69 kV Transmission Line","location_report":"Benguet","table_horizon":"2031-2040","reported_ETC":"Mar 2032","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-020","edition":2026,"table":"5.2","printed_page":71,"region":"Luzon","name":"South Luzon 69 kV Transmission Line Upgrading","location_report":"Batangas, Camarines Norte, Camarines Sur","table_horizon":"2031-2040","reported_ETC":"Jun 2032","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-021","edition":2026,"table":"5.2","printed_page":72,"region":"Luzon","name":"North Luzon 69 kV Transmission Line Upgrading Project","location_report":"Pangasinan, Isabela, Nueva Ecija, Nueva Viscaya","table_horizon":"2031-2040","reported_ETC":"Jun 2032","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-022","edition":2026,"table":"5.2","printed_page":72,"region":"Luzon","name":"Tuy 500/230 kV Substation Project (Stage 2)","location_report":"Batangas","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-023","edition":2026,"table":"5.2","printed_page":72,"region":"Luzon","name":"Sta. Maria 500 kV Substation","location_report":"Laguna","table_horizon":"2031-2040","reported_ETC":"Sep 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-024","edition":2026,"table":"5.2","printed_page":73,"region":"Luzon","name":"Silang 500 kV Substation","location_report":"Cavite","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-025","edition":2026,"table":"5.2","printed_page":73,"region":"Luzon","name":"Tagkawayan 500 kV Substation","location_report":"Quezon Province","table_horizon":"2031-2040","reported_ETC":"Jun 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-026","edition":2026,"table":"5.2","printed_page":73,"region":"Luzon","name":"Palauig 500 kV Substation","location_report":"Zambales","table_horizon":"2031-2040","reported_ETC":"Jun 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-027","edition":2026,"table":"5.2","printed_page":74,"region":"Luzon","name":"Luzon Connection Requirements for Power Plant Project 4","location_report":"Various provinces in Luzon","table_horizon":"2031-2040","reported_ETC":"Apr 2035","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-028","edition":2026,"table":"5.2","printed_page":74,"region":"Luzon","name":"Baras 500 kV Substation Project","location_report":"Rizal","table_horizon":"2031-2040","reported_ETC":"Sep 2038","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-029","edition":2026,"table":"5.2","printed_page":74,"region":"Luzon","name":"Bugallon 500 kV Substation Project","location_report":"Pangasinan","table_horizon":"2031-2040","reported_ETC":"Jul 2038","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-030","edition":2026,"table":"5.2","printed_page":75,"region":"Luzon","name":"San Isidro 500 kV Substation Project","location_report":"Nueva Ecija","table_horizon":"2031-2040","reported_ETC":"Aug 2040","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-031","edition":2026,"table":"5.2","printed_page":75,"region":"Luzon","name":"Navotas 230 kV Substation","location_report":"Navotas","table_horizon":"2031-2040","reported_ETC":"Dec 2032","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-032","edition":2026,"table":"5.2","printed_page":75,"region":"Luzon","name":"Castillejos 230 kV Substation","location_report":"Zambales","table_horizon":"2031-2040","reported_ETC":"Aug 2031","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-033","edition":2026,"table":"5.2","printed_page":76,"region":"Luzon","name":"Porac 230 kV Substation","location_report":"Pampanga","table_horizon":"2031-2040","reported_ETC":"Nov 2031","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-034","edition":2026,"table":"5.2","printed_page":76,"region":"Luzon","name":"Capas 230 kV Substation","location_report":"Tarlac","table_horizon":"2031-2040","reported_ETC":"Jun 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-035","edition":2026,"table":"5.2","printed_page":76,"region":"Luzon","name":"Dasol 230 kV Substation","location_report":"Zambales","table_horizon":"2031-2040","reported_ETC":"Jun 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-036","edition":2026,"table":"5.2","printed_page":77,"region":"Luzon","name":"Magalang 230 kV Substation","location_report":"Pampanga","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-037","edition":2026,"table":"5.2","printed_page":77,"region":"Luzon","name":"Luzon Connection Requirements for Power Plant Project 2","location_report":"Various provinces in Luzon","table_horizon":"2031-2040","reported_ETC":"Jan 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-038","edition":2026,"table":"5.2","printed_page":77,"region":"Luzon","name":"Malaya 230 kV Collector Station","location_report":"Rizal","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-039","edition":2026,"table":"5.2","printed_page":78,"region":"Luzon","name":"Masiit 230 kV Substation Project","location_report":"Laguna","table_horizon":"2031-2040","reported_ETC":"Jun 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-040","edition":2026,"table":"5.2","printed_page":78,"region":"Luzon","name":"Plaridel 230 kV Substation","location_report":"Nueva Ecija","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-041","edition":2026,"table":"5.2","printed_page":78,"region":"Luzon","name":"Baler 230 kV Substation","location_report":"Nueva Ecija, Aurora","table_horizon":"2031-2040","reported_ETC":"Jun 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-042","edition":2026,"table":"5.2","printed_page":79,"region":"Luzon","name":"San Fabian 230 kV Substation","location_report":"Pangasinan","table_horizon":"2031-2040","reported_ETC":"Dec 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-043","edition":2026,"table":"5.2","printed_page":79,"region":"Luzon","name":"Luzon Primary Equipment Substation Upgrading","location_report":"Various Provinces in Luzon Grid","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-044","edition":2026,"table":"5.2","printed_page":80,"region":"Luzon","name":"Sampaloc 230 kV Substation","location_report":"Nueva Ecija","table_horizon":"2031-2040","reported_ETC":"Mar 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-045","edition":2026,"table":"5.2","printed_page":80,"region":"Luzon","name":"Olongapo 230 kV Substation Upgrading","location_report":"Zambales","table_horizon":"2031-2040","reported_ETC":"Aug 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-046","edition":2026,"table":"5.2","printed_page":80,"region":"Luzon","name":"Tanauan 230 kV Substation","location_report":"Batangas","table_horizon":"2031-2040","reported_ETC":"Dec 2032","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-047","edition":2026,"table":"5.2","printed_page":80,"region":"Luzon","name":"Kawit 230 kV Substation","location_report":"Cavite, Las Piñas","table_horizon":"2031-2040","reported_ETC":"Dec 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-048","edition":2026,"table":"5.2","printed_page":81,"region":"Luzon","name":"Pasay 230 kV Substation","location_report":"Las Pinas, Pasay","table_horizon":"2031-2040","reported_ETC":"Dec 2033","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-049","edition":2026,"table":"5.2","printed_page":81,"region":"Luzon","name":"North Luzon Substation Upgrading Project 4","location_report":"Various provinces in Luzon","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-050","edition":2026,"table":"5.2","printed_page":81,"region":"Luzon","name":"Lipa 230 kV Substation","location_report":"Batangas","table_horizon":"2031-2040","reported_ETC":"July 2038","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-051","edition":2026,"table":"5.2","printed_page":82,"region":"Luzon","name":"San Mateo 230 kV Substation Project","location_report":"Rizal","table_horizon":"2031-2040","reported_ETC":"Jun 2038","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-052","edition":2026,"table":"5.2","printed_page":82,"region":"Luzon","name":"North Luzon Substation Upgrading Project 3","location_report":"Various provinces in Luzon","table_horizon":"2031-2040","reported_ETC":"Dec 2035","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-053","edition":2026,"table":"5.2","printed_page":82,"region":"Luzon","name":"San Agustin 230 kV Substation","location_report":"Pangasinan, Tarlac","table_horizon":"2031-2040","reported_ETC":"Aug 2038","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-054","edition":2026,"table":"5.2","printed_page":83,"region":"Luzon","name":"South Luzon Substation Upgrading Project 3","location_report":"Various provinces in South Luzon","table_horizon":"2031-2040","reported_ETC":"Oct 2035","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-055","edition":2026,"table":"5.2","printed_page":83,"region":"Luzon","name":"Minuyan 115 kV Switching Station","location_report":"Bulacan","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":115.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-056","edition":2026,"table":"5.2","printed_page":83,"region":"Luzon","name":"Luzon Voltage Improvement Project 5","location_report":"Cagayan, Nueva Ecija, Zambales","table_horizon":"2031-2040","reported_ETC":"Dec 2031","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-057","edition":2026,"table":"5.2","printed_page":84,"region":"Luzon","name":"Luzon Voltage Improvement Project 6","location_report":"Pangasinan, Cagayan, Tarlac, Zambales, Bulacan, Laguna, Camarines Sur","table_horizon":"2031-2040","reported_ETC":"Aug 2030","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-058","edition":2026,"table":"5.2","printed_page":84,"region":"Luzon","name":"Luzon Voltage Improvement Project 7","location_report":"Metro Manila, Batangas, Bulacan, Cavite, Ifugao, Isabela, Batangas, Quezon, Pampanga, and Laguna","table_horizon":"2031-2040","reported_ETC":"Feb 2036","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-059","edition":2026,"table":"5.2","printed_page":84,"region":"Luzon","name":"Quezon – Marinduque Interconnection Project","location_report":"Quezon, Marinduque","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.2-060","edition":2026,"table":"5.2","printed_page":85,"region":"Luzon","name":"Camarines Sur - Catanduanes Interconnection Project","location_report":"Camarines Sur, Catanduanes","table_horizon":"2031-2040","reported_ETC":"Jun 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-061","edition":2026,"table":"5.3","printed_page":86,"region":"Luzon","name":"Baras – Pinamucan 500 kV Transmission Line","location_report":"Rizal, Batangas","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-062","edition":2026,"table":"5.3","printed_page":86,"region":"Luzon","name":"Hermosa – Mexico 230 kV Transmission Line Upgrading","location_report":"Bataan, Pampanga","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-063","edition":2026,"table":"5.3","printed_page":86,"region":"Luzon","name":"Calaca – Salong 230 kV Transmission Line 2","location_report":"Batangas","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-064","edition":2026,"table":"5.3","printed_page":86,"region":"Luzon","name":"Cabanatuan – San Rafael – Mexico 230 kV Transmission Line Upgrading","location_report":"Nueva Ecija, Pampanga, Bulacan","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-065","edition":2026,"table":"5.3","printed_page":87,"region":"Luzon","name":"Marilao 500 kV Substation Expansion","location_report":"Bulacan","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-066","edition":2026,"table":"5.3","printed_page":87,"region":"Luzon","name":"Kalinga 500 kV Substation","location_report":"Kalinga","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-067","edition":2026,"table":"5.3","printed_page":87,"region":"Luzon","name":"Taguig 500 kV Substation Expansion","location_report":"Metro Manila","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-068","edition":2026,"table":"5.3","printed_page":87,"region":"Luzon","name":"Castillejos 500 kV Substation Expansion","location_report":"Zambales","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-069","edition":2026,"table":"5.3","printed_page":88,"region":"Luzon","name":"Balsik 500 kV Substation Expansion","location_report":"Zambales","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-070","edition":2026,"table":"5.3","printed_page":88,"region":"Luzon","name":"Dasmariñas 500 kV Substation Upgrading","location_report":"Cavite","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-071","edition":2026,"table":"5.3","printed_page":88,"region":"Luzon","name":"FBGC 230 kV Substation Project","location_report":"Metro Manila","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-072","edition":2026,"table":"5.3","printed_page":88,"region":"Luzon","name":"Nuvali 230 kV Substation Project","location_report":"Laguna","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-073","edition":2026,"table":"5.3","printed_page":89,"region":"Luzon","name":"Iriga 230 kV Substation","location_report":"Camarines Sur","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-074","edition":2026,"table":"5.3","printed_page":89,"region":"Luzon","name":"Sariaya 230 kV Substation","location_report":"Quezon","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-075","edition":2026,"table":"5.3","printed_page":89,"region":"Luzon","name":"Cabatuan 230 kV Substation","location_report":"Isabela","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.3-076","edition":2026,"table":"5.3","printed_page":90,"region":"Luzon","name":"Balanga 230 kV Substation","location_report":"Bataan","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U001","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"Bataan – Cavite 500 kV Transmission Line","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U002","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"San Isidro – Palauig 500 kV Transmission Line","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U003","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"Milaor – Tublijon 500 kV Transmission Line","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U004","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"Binga – La Trinidad 230 kV Transmission Line","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U005","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"Bauang – Balaoan 230 kV Transmission Line Upgrading","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U006","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"Taguig – Muntinlupa 230 kV Transmission Line 2","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U007","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"Sagada – San Esteban 230 kV Transmission Line","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U008","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"Dinadiawan – Santiago 230 kV Transmission Line","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U009","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"Baler – Dinadiawan 230 kV Transmission Line","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U010","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"La Trinidad – Sagada 230 kV Transmission Line","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U011","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"Pasay – Limay 230 kV Transmission Line","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U012","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"Capas – Bolo 230 kV Transmission Line","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U013","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"Sorsogon - Masbate Interconnection Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U014","edition":2026,"table":"5.4","printed_page":91,"region":"Luzon","name":"Mexico – Clark 69 kV Transmission Line Upgrading","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U015","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Bacolor 500 kV Substation","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U016","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Santiago 500 kV Substation Expansion","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U017","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Alas — Asin 500 kV Substation","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U018","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Calatagan 500 kV Substation","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U019","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Alaminos 500 kV Substation","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U020","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Nagsaag 500 kV Substation Expansion","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":500.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U021","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"San Marcelino 230 kV Collector Station","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U022","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Calamba 230 kV Collector Station","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U023","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Bustos 230 kV Substation","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U024","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Real 230 kV Substation","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U025","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Guagua 230 kV Substation","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U026","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Apalit 230 kV Substation","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U027","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Valenzuela 230 kV Substation","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U028","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Presentacion 230 kV Substation","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U029","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"South Luzon Substation Upgrading 4","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-5.4-U030","edition":2026,"table":"5.4","printed_page":92,"region":"Luzon","name":"Matnog 230 kV Substation","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.1-001","edition":2026,"table":"6.1","printed_page":95,"region":"Visayas","name":"Cebu – Lapu-Lapu Transmission Project","location_report":"Cebu","table_horizon":"2026-2030","reported_ETC":"May 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.1-002","edition":2026,"table":"6.1","printed_page":95,"region":"Visayas","name":"Babatngon – Palo 230 kV Transmission Line Project (Initially Energized at 138 kV)","location_report":"Leyte","table_horizon":"2026-2030","reported_ETC":"Sep 2030","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":138.0,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.1-003","edition":2026,"table":"6.1","printed_page":95,"region":"Visayas","name":"Nabas – Caticlan – Boracay Transmission Line Project","location_report":"Aklan","table_horizon":"2026-2030","reported_ETC":"Aug 2026","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.1-004","edition":2026,"table":"6.1","printed_page":96,"region":"Visayas","name":"Amlan – Valencia (Dumaguete) 138 kV Transmission Line Project","location_report":"Negros Oriental","table_horizon":"2026-2030","reported_ETC":"Dec 2026","regulatory_status":"ERC-approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.1-005","edition":2026,"table":"6.1","printed_page":96,"region":"Visayas","name":"Panay – Guimaras 138 kV Interconnection Project","location_report":"Guimaras, Iloilo","table_horizon":"2026-2030","reported_ETC":"Dec 2026","regulatory_status":"ERC-approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.1-006","edition":2026,"table":"6.1","printed_page":97,"region":"Visayas","name":"Calbayog – Allen Transmission Line Project","location_report":"Samar","table_horizon":"2026-2030","reported_ETC":"Dec 2028","regulatory_status":"ERC-approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.1-007","edition":2026,"table":"6.1","printed_page":97,"region":"Visayas","name":"Lapu-lapu 230 kV Substation Project","location_report":"Cebu","table_horizon":"2026-2030","reported_ETC":"Dec 2027","regulatory_status":"ERC-approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.1-008","edition":2026,"table":"6.1","printed_page":97,"region":"Visayas","name":"Grid Protection Relay Replacement Project (Phase 3)","location_report":"Luzon, Visayas, Mindanao","table_horizon":"2026-2030","reported_ETC":"Jun 2028","regulatory_status":"ERC-approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.1-009","edition":2026,"table":"6.1","printed_page":98,"region":"Visayas","name":"Visayas Substation Upgrading Project 2","location_report":"Various provinces in the Visayas","table_horizon":"2026-2030","reported_ETC":"Jun 2028","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.1-010","edition":2026,"table":"6.1","printed_page":99,"region":"Visayas","name":"Visayas Regional PCB Replacement Project 1","location_report":"Cebu, Bohol, Negros Occidental, Iloilo","table_horizon":"2026-2030","reported_ETC":"Jan 2030","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.1-011","edition":2026,"table":"6.1","printed_page":99,"region":"Visayas","name":"Visayas Grid Reliability and Stability Support Project 1","location_report":"Samar","table_horizon":"2026-2030","reported_ETC":"Dec 2029","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.1-012","edition":2026,"table":"6.1","printed_page":99,"region":"Visayas","name":"Visayas Voltage Improvement Project 2","location_report":"Various provinces in the Visayas","table_horizon":"2026-2030","reported_ETC":"Stage 1: Aug 2027 Stage 2: Jun 2030","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.1-013","edition":2026,"table":"6.1","printed_page":100,"region":"Visayas","name":"Visayas Mobile Capacitor Bank Project","location_report":"Iloilo, Leyte","table_horizon":"2026-2030","reported_ETC":"Dec 2029","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-001","edition":2026,"table":"6.2","printed_page":101,"region":"Visayas","name":"Luzon – Visayas HVDC Bipolar Operation Project","location_report":"Quezon, Camarines Sur, Leyte","table_horizon":"2031-2040","reported_ETC":"Dec 2032","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-002","edition":2026,"table":"6.2","printed_page":102,"region":"Visayas","name":"Cebu – Negros 230 kV Interconnection Upgrading Project","location_report":"Negros, Cebu","table_horizon":"2031-2040","reported_ETC":"Sep 2034","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-003","edition":2026,"table":"6.2","printed_page":102,"region":"Visayas","name":"Barotac Viejo – Unidos 230 kV Transmission Line Project","location_report":"Panay","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-004","edition":2026,"table":"6.2","printed_page":103,"region":"Visayas","name":"Cebu – Leyte 230 kV Interconnection Lines 3 & 4 Project","location_report":"Cebu, Leyte","table_horizon":"2031-2040","reported_ETC":"Stage 1: Dec 2031 Stage 2: Apr 2033 Stage 3: Jun 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-005","edition":2026,"table":"6.2","printed_page":103,"region":"Visayas","name":"Babatngon – Calbayog 230 KV Transmission Line Project","location_report":"Samar, Leyte","table_horizon":"2031-2040","reported_ETC":"Dec 2036","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-006","edition":2026,"table":"6.2","printed_page":104,"region":"Visayas","name":"Cebu – Leyte 230 kV Interconnection Lines 5 and 6 Project","location_report":"Cebu, Leyte","table_horizon":"2031-2040","reported_ETC":"Dec 2036","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-007","edition":2026,"table":"6.2","printed_page":104,"region":"Visayas","name":"Ormoc – Babatngon 230 kV Transmission Line Project","location_report":"Leyte","table_horizon":"2031-2040","reported_ETC":"Dec 2036","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-008","edition":2026,"table":"6.2","printed_page":104,"region":"Visayas","name":"Calatrava – Granada 230 kV Transmission Line Project","location_report":"Negros Occidental","table_horizon":"2031-2040","reported_ETC":"Feb 2037","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-009","edition":2026,"table":"6.2","printed_page":105,"region":"Visayas","name":"Negros – Panay 230 kV Interconnection Upgrading Project","location_report":"Panay, Negros","table_horizon":"2031-2040","reported_ETC":"Nov 2037","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-010","edition":2026,"table":"6.2","printed_page":105,"region":"Visayas","name":"Bacolod – Kabankalan 230 kV Transmission Line Project","location_report":"Negros Occidental","table_horizon":"2031-2040","reported_ETC":"Feb 2038","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-011","edition":2026,"table":"6.2","printed_page":105,"region":"Visayas","name":"Leyte – Bohol 230 kV Interconnection Project (Initially Energized at 138 kV)","location_report":"Leyte, Bohol","table_horizon":"2031-2040","reported_ETC":"Apr 2038","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":230.0,"initial_energization_kV":138.0,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-012","edition":2026,"table":"6.2","printed_page":106,"region":"Visayas","name":"Maasin – Malinao (Sogod) 230 kV Transmission Line Project (Initially Energized at 138 kV)","location_report":"Leyte","table_horizon":"2031-2040","reported_ETC":"May 2038","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":230.0,"initial_energization_kV":138.0,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-013","edition":2026,"table":"6.2","printed_page":106,"region":"Visayas","name":"Panay – Guimaras 138 kV Interconnection Line 2 Project","location_report":"Guimaras, Iloilo","table_horizon":"2031-2040","reported_ETC":"Jun 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-014","edition":2026,"table":"6.2","printed_page":106,"region":"Visayas","name":"Corella – Ubay 138 kV Line 2 Stringing Project","location_report":"Bohol","table_horizon":"2031-2040","reported_ETC":"Nov 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-015","edition":2026,"table":"6.2","printed_page":107,"region":"Visayas","name":"Babatngon – Paranas 138 kV Transmission Line Upgrading Project","location_report":"Samar, Leyte","table_horizon":"2031-2040","reported_ETC":"Nov 2034","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-016","edition":2026,"table":"6.2","printed_page":107,"region":"Visayas","name":"Amlan-Bacolod 138 kV Transmission Corridor Upgrading Project","location_report":"Negros","table_horizon":"2031-2040","reported_ETC":"May 2036","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-017","edition":2026,"table":"6.2","printed_page":107,"region":"Visayas","name":"Victoria – Catarman 138 kV Transmission Line Project","location_report":"Samar","table_horizon":"2031-2040","reported_ETC":"Feb 2038","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-018","edition":2026,"table":"6.2","printed_page":107,"region":"Visayas","name":"Paranas – Taft 138 kV Transmission Line Project","location_report":"Samar","table_horizon":"2031-2040","reported_ETC":"Feb 2038","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-019","edition":2026,"table":"6.2","printed_page":108,"region":"Visayas","name":"Visayas 69 kV Transmission Line Upgrading Project 2","location_report":"Cebu, Samar, Leyte, Negros, Panay","table_horizon":"2031-2040","reported_ETC":"Jun 2031","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-020","edition":2026,"table":"6.2","printed_page":108,"region":"Visayas","name":"Barotac Viejo – Natividad 69 kV Transmission Line Project","location_report":"Iloilo","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-021","edition":2026,"table":"6.2","printed_page":108,"region":"Visayas","name":"Tabango – Biliran 69 kV Transmission Line Project","location_report":"Northern Leyte","table_horizon":"2031-2040","reported_ETC":"Jun 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-022","edition":2026,"table":"6.2","printed_page":109,"region":"Visayas","name":"La Carlota – Cubay 69 kV Transmission Line Project","location_report":"Negros Occidental","table_horizon":"2031-2040","reported_ETC":"Dec 2040","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-023","edition":2026,"table":"6.2","printed_page":109,"region":"Visayas","name":"Visayas Substation Upgrading Project 3","location_report":"Negros Occidental, Iloilo, Cebu, Samar","table_horizon":"2031-2040","reported_ETC":"Jun 2031","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-024","edition":2026,"table":"6.2","printed_page":109,"region":"Visayas","name":"Visayas Connection Requirements for Power Plant Project 1","location_report":"Leyte, Bohol, Negros, Panay","table_horizon":"2031-2040","reported_ETC":"Nov 2031","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-025","edition":2026,"table":"6.2","printed_page":110,"region":"Visayas","name":"Visayas Connection Requirements for Power Plant Project 2","location_report":"Leyte, Samar, Bohol, Negros, Panay","table_horizon":"2031-2040","reported_ETC":"Mar 2032","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-026","edition":2026,"table":"6.2","printed_page":110,"region":"Visayas","name":"Talisay (Granada) 230 kV Substation Project","location_report":"Negros Occidental","table_horizon":"2031-2040","reported_ETC":"Feb 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-027","edition":2026,"table":"6.2","printed_page":110,"region":"Visayas","name":"Sogod (Danao) 230 kV Substation Project","location_report":"Cebu","table_horizon":"2031-2040","reported_ETC":"Mar 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-028","edition":2026,"table":"6.2","printed_page":110,"region":"Visayas","name":"Visayas Substation Upgrading Project 4","location_report":"Leyte, Negros Occidental, Cebu","table_horizon":"2031-2040","reported_ETC":"Jun 2035","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-029","edition":2026,"table":"6.2","printed_page":111,"region":"Visayas","name":"Visayas Connection Requirements for Power Plants Project 3","location_report":"Samar, Negros, Panay","table_horizon":"2031-2040","reported_ETC":"Jul 2035","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-030","edition":2026,"table":"6.2","printed_page":111,"region":"Visayas","name":"Maghaway (Laray) 230 kV Substation Project (Initially Energized at 138 kV)","location_report":"Cebu","table_horizon":"2031-2040","reported_ETC":"Dec 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":138.0,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-031","edition":2026,"table":"6.2","printed_page":111,"region":"Visayas","name":"Argao 230 kV Substation Project","location_report":"Southern Cebu","table_horizon":"2031-2040","reported_ETC":"May 2036","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-032","edition":2026,"table":"6.2","printed_page":112,"region":"Visayas","name":"Mandurriao 230 kV Substation Project (Initially Energized at 138 kV)","location_report":"Iloilo","table_horizon":"2031-2040","reported_ETC":"Jun 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":138.0,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-033","edition":2026,"table":"6.2","printed_page":112,"region":"Visayas","name":"Gahit 230 kV Substation Project","location_report":"Negros Occidental","table_horizon":"2031-2040","reported_ETC":"Jul 2036","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-034","edition":2026,"table":"6.2","printed_page":112,"region":"Visayas","name":"San Fernando 230 kV Substation Project","location_report":"Southern Cebu","table_horizon":"2031-2040","reported_ETC":"Dec 2037","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-035","edition":2026,"table":"6.2","printed_page":113,"region":"Visayas","name":"Tigbauan 138 kV Substation Project","location_report":"Iloilo","table_horizon":"2031-2040","reported_ETC":"Sep 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-036","edition":2026,"table":"6.2","printed_page":113,"region":"Visayas","name":"La Carlota 138 kV Substation Project","location_report":"Negros Occidental","table_horizon":"2031-2040","reported_ETC":"Jan 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-037","edition":2026,"table":"6.2","printed_page":113,"region":"Visayas","name":"Malinao (Banga) 138 kV Substation Project","location_report":"Aklan","table_horizon":"2031-2040","reported_ETC":"Jan 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-038","edition":2026,"table":"6.2","printed_page":114,"region":"Visayas","name":"Sumangga 138 kV Substation Project","location_report":"Leyte","table_horizon":"2031-2040","reported_ETC":"Feb 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-039","edition":2026,"table":"6.2","printed_page":114,"region":"Visayas","name":"Bool 138 kV Substation Project","location_report":"Bohol","table_horizon":"2031-2040","reported_ETC":"Dec 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-040","edition":2026,"table":"6.2","printed_page":114,"region":"Visayas","name":"Sta. Rita 138 kV Substation Upgrading Project","location_report":"Samar","table_horizon":"2031-2040","reported_ETC":"Sep 2037","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-041","edition":2026,"table":"6.2","printed_page":114,"region":"Visayas","name":"Visayas Regional PCB Replacement Project 2","location_report":"Various Provinces in the Visayas","table_horizon":"2031-2040","reported_ETC":"Oct 2036","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.2-042","edition":2026,"table":"6.2","printed_page":115,"region":"Visayas","name":"Visayas Voltage Improvement Project 3","location_report":"Various Provinces in the Visayas","table_horizon":"2031-2040","reported_ETC":"Jan 2035","regulatory_status":"Awaiting ERC Approval","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.3-001","edition":2026,"table":"6.3","printed_page":116,"region":"Visayas","name":"Corella – Ubay 230 kV Transmission Line Project","location_report":"Bohol, Leyte","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.3-002","edition":2026,"table":"6.3","printed_page":116,"region":"Visayas","name":"Poblacion – Macapso 230 kV Interconnection Project","location_report":"Cebu, Negros","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.3-003","edition":2026,"table":"6.3","printed_page":116,"region":"Visayas","name":"Negros – Guimaras 230 kV Backbone Project","location_report":"Negros Occidental","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.3-004","edition":2026,"table":"6.3","printed_page":117,"region":"Visayas","name":"Panay – Guimaras 230 kV Backbone Project","location_report":"Panay, Guimaras","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.3-005","edition":2026,"table":"6.3","printed_page":117,"region":"Visayas","name":"Barotac Viejo – Sta. Barbara 230 kV Transmission Line Project","location_report":"Panay","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.3-006","edition":2026,"table":"6.3","printed_page":118,"region":"Visayas","name":"Sta. Rita – Quinapondan 138 kV Transmission Line Project","location_report":"Samar","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.3-007","edition":2026,"table":"6.3","printed_page":118,"region":"Visayas","name":"Valencia (Dumaguete) – Siaton 138 kV Transmission Line Project","location_report":"Negros Oriental","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.3-008","edition":2026,"table":"6.3","printed_page":118,"region":"Visayas","name":"Daanglungsod Substation Upgrading Project","location_report":"Cebu","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.4-U001","edition":2026,"table":"6.4","printed_page":120,"region":"Visayas","name":"Palo – Malinao (Sogod) 230 kV Transmission Line Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.4-U002","edition":2026,"table":"6.4","printed_page":120,"region":"Visayas","name":"Maghaway (Laray) – Sirao (Bonbon) 230 kV Transmission Line Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.4-U003","edition":2026,"table":"6.4","printed_page":120,"region":"Visayas","name":"Pusok – Cordova 230 kV Interconnection Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.4-U004","edition":2026,"table":"6.4","printed_page":120,"region":"Visayas","name":"Catarman – Mapanas – Taft 138 kV Transmission Line Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.4-U005","edition":2026,"table":"6.4","printed_page":120,"region":"Visayas","name":"Quinapondan (Borongan) – Taft 138 kV Transmission Line Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.4-U006","edition":2026,"table":"6.4","printed_page":120,"region":"Visayas","name":"Bayawan – Sipalay 138 kV Transmission Line Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.4-U007","edition":2026,"table":"6.4","printed_page":120,"region":"Visayas","name":"Siaton – Bayawan 138 kV Transmission Line Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.4-U008","edition":2026,"table":"6.4","printed_page":120,"region":"Visayas","name":"San Jose – Nabas 138 kV Transmission Line Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.4-U009","edition":2026,"table":"6.4","printed_page":120,"region":"Visayas","name":"Visayas 69 kV Transmission Line Upgrading Project 3","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.4-U010","edition":2026,"table":"6.4","printed_page":120,"region":"Visayas","name":"Visayas Substation Upgrading Project 5","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.4-U011","edition":2026,"table":"6.4","printed_page":120,"region":"Visayas","name":"Sipalay 138 kV Substation Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-6.4-U012","edition":2026,"table":"6.4","printed_page":120,"region":"Visayas","name":"Dumangas 138 kV Substation Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.1-001","edition":2026,"table":"7.1","printed_page":123,"region":"Mindanao","name":"San Francisco – Tago 138 kV Transmission Line Project","location_report":"Agusan del Sur, Surigao del Sur","table_horizon":"2026-2030","reported_ETC":"Oct 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.1-002","edition":2026,"table":"7.1","printed_page":124,"region":"Mindanao","name":"Tacurong – Kalamansig 69 kV Transmission Line Project","location_report":"Sultan Kudarat","table_horizon":"2026-2030","reported_ETC":"Jun 2026","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.1-003","edition":2026,"table":"7.1","printed_page":124,"region":"Mindanao","name":"Mindanao Substation Upgrading 2 Project (MSU2P)","location_report":"Lanao Del Norte, Bukidnon, Agusan Del Norte, Misamis Oriental, Davao del Sur , Sultan Kudarat, Zamboanga del Sur, Surigao del Sur","table_horizon":"2026-2030","reported_ETC":"Stage 1: Dec 2027 Stage 2: Jun 2028 Stage 3: Dec 2029","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.1-004","edition":2026,"table":"7.1","printed_page":125,"region":"Mindanao","name":"Mindanao Substation Expansion 3 Project (MSE3P)","location_report":"Zamboanga del Sur, Surigao del Norte, Agusan del Sur, Davao del Sur","table_horizon":"2026-2030","reported_ETC":"Apr 2028","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.1-005","edition":2026,"table":"7.1","printed_page":125,"region":"Mindanao","name":"Laguindingan 230 kV Substation Project","location_report":"Misamis Oriental","table_horizon":"2026-2030","reported_ETC":"Energized","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.1-006","edition":2026,"table":"7.1","printed_page":125,"region":"Mindanao","name":"Kabacan 138 kV Substation Project","location_report":"Cotabato","table_horizon":"2026-2030","reported_ETC":"Phase 1: Feb 2028 Phase 2: Feb 2028","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.1-007","edition":2026,"table":"7.1","printed_page":126,"region":"Mindanao","name":"Mindanao Substation Expansion 4 Project (MSE4P)","location_report":"Zamboanga Del Sur, Zamboanga Del Norte, Lanao Del Norte, Bukidnon, Davao del Norte, Davao Occidental, Maguindanao Del Norte, Agusan del Norte","table_horizon":"2026-2030","reported_ETC":"Oct 2026","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.1-008","edition":2026,"table":"7.1","printed_page":126,"region":"Mindanao","name":"Nasipit Substation Bus-in Project","location_report":"Agusan del Norte","table_horizon":"2026-2030","reported_ETC":"Dec 2026","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.1-009","edition":2026,"table":"7.1","printed_page":126,"region":"Mindanao","name":"Eastern Mindanao Voltage Improvement Project (EMVIP)","location_report":"Agusan del Norte, Agusan del Sur, Davao de Oro, Davao del Norte, Davao Oriental","table_horizon":"2026-2030","reported_ETC":"Dec 2027","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.1-010","edition":2026,"table":"7.1","printed_page":127,"region":"Mindanao","name":"Opol Substation Bus-in Project","location_report":"Misamis Oriental","table_horizon":"2026-2030","reported_ETC":"Oct 2030","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.1-011","edition":2026,"table":"7.1","printed_page":127,"region":"Mindanao","name":"Mindanao-Visayas Interconnection Project (MVIP) Stage 2","location_report":"Cebu, Lanao del Norte","table_horizon":"2026-2030","reported_ETC":"Apr 2030","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-001","edition":2026,"table":"7.2","printed_page":128,"region":"Mindanao","name":"Bunawan – Tagum 230 kV Transmission Line Project","location_report":"Davao del Sur, Davao Del Norte, Davao de Oro","table_horizon":"2031-2040","reported_ETC":"Dec 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-002","edition":2026,"table":"7.2","printed_page":128,"region":"Mindanao","name":"Eastern Mindanao 230 kV Transmission Line Project","location_report":"Agusan del Sur, Agusan del Norte, Davao del Sur, Davao de Oro","table_horizon":"2031-2040","reported_ETC":"Jun 2035","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-003","edition":2026,"table":"7.2","printed_page":129,"region":"Mindanao","name":"Villanueva – Kinamlutan 230 kV Transmission Line Project","location_report":"Misamis Oriental, Agusan Del Norte","table_horizon":"2031-2040","reported_ETC":"Jun 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-004","edition":2026,"table":"7.2","printed_page":129,"region":"Mindanao","name":"Sultan Kudarat – Tacurong 230 kV Transmission Line Project","location_report":"Maguindanao del Norte, Sultan Kudarat","table_horizon":"2031-2040","reported_ETC":"Oct 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-005","edition":2026,"table":"7.2","printed_page":130,"region":"Mindanao","name":"Lala – Sta. Clara – Tumaga 230 kV Transmission Line Project","location_report":"Lanao del Norte, Zamboanga Sibugay, Zamboanga del Sur","table_horizon":"2031-2040","reported_ETC":"Sep 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-006","edition":2026,"table":"7.2","printed_page":130,"region":"Mindanao","name":"Matanao – General Santos 230 kV Transmission Line Project","location_report":"South Cotabato, Davao del Sur","table_horizon":"2031-2040","reported_ETC":"Dec 2032","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-007","edition":2026,"table":"7.2","printed_page":131,"region":"Mindanao","name":"Polanco – Oroquieta 138 kV Transmission Line Project","location_report":"Misamis Occidental, Zamboanga del Norte","table_horizon":"2031-2040","reported_ETC":"Jan 2031","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-008","edition":2026,"table":"7.2","printed_page":131,"region":"Mindanao","name":"Maco – Mati 138 kV Transmission Line Project","location_report":"Davao Del Norte, Davao Oriental","table_horizon":"2031-2040","reported_ETC":"Nov 2031","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-009","edition":2026,"table":"7.2","printed_page":131,"region":"Mindanao","name":"Agus 6 – Kiwalan – Lugait 69 kV Transmission Line Project","location_report":"Lanao del Norte, Misamis Oriental","table_horizon":"2031-2040","reported_ETC":"Jun 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-010","edition":2026,"table":"7.2","printed_page":132,"region":"Mindanao","name":"Sultan Kudarat – Pinaring 69 kV Transmission Line","location_report":"Maguindanao del Norte","table_horizon":"2031-2040","reported_ETC":"Dec 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-011","edition":2026,"table":"7.2","printed_page":132,"region":"Mindanao","name":"Maco – Tagum 69 kV Transmission Line Project","location_report":"Davao del Norte","table_horizon":"2031-2040","reported_ETC":"Dec 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-012","edition":2026,"table":"7.2","printed_page":132,"region":"Mindanao","name":"Baungon 230 kV Substation","location_report":"Bukidnon, Misamis Oriental","table_horizon":"2031-2040","reported_ETC":"Jun 2034","regulatory_status":"Awaiting ERC Approval CEPNS","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-013","edition":2026,"table":"7.2","printed_page":133,"region":"Mindanao","name":"Tumaga 138 kV Substation Project","location_report":"Zamboanga del Sur","table_horizon":"2031-2040","reported_ETC":"Dec 2033","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-014","edition":2026,"table":"7.2","printed_page":133,"region":"Mindanao","name":"Tigbao 138 kV Substation Project","location_report":"Zamboanga del Sur","table_horizon":"2031-2040","reported_ETC":"Jun 2036","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-015","edition":2026,"table":"7.2","printed_page":134,"region":"Mindanao","name":"Malaybalay 138 kV Substation Project","location_report":"Bukidnon","table_horizon":"2031-2040","reported_ETC":"Dec 2034","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-016","edition":2026,"table":"7.2","printed_page":134,"region":"Mindanao","name":"Tupi 138 kV Substation Project","location_report":"South Cotabato","table_horizon":"2031-2040","reported_ETC":"Jun 2031","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-017","edition":2026,"table":"7.2","printed_page":134,"region":"Mindanao","name":"Zamboanga – Basilan 69 kV Interconnection Project","location_report":"Zamboanga, Basilan Island","table_horizon":"2031-2040","reported_ETC":"Apr 2037","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.2-018","edition":2026,"table":"7.2","printed_page":135,"region":"Mindanao","name":"Claver – Siargao 69 kV Interconnection Project","location_report":"Siargao, Surigao Del Sur","table_horizon":"2031-2040","reported_ETC":"Feb 2033","regulatory_status":"ERC-Approved CEPNS","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-001","edition":2026,"table":"7.3","printed_page":136,"region":"Mindanao","name":"Lala – Malabang – Sultan Kudarat Transmission Line Project","location_report":"Lanao del Norte, Lanao del Sur, Maguindanao","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-002","edition":2026,"table":"7.3","printed_page":136,"region":"Mindanao","name":"Kinamlutan – Placer 230 kV Transmission Line Project","location_report":"Surigao del Norte, Agusan del Norte","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-003","edition":2026,"table":"7.3","printed_page":137,"region":"Mindanao","name":"Nagamin – Salug 138 kV Transmission Line Project","location_report":"Zamboanga Sibugay, Zamboanga del Norte","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-004","edition":2026,"table":"7.3","printed_page":137,"region":"Mindanao","name":"Polanco – Roxas 69 kV Transmission Line Project","location_report":"Zamboanga Del Norte, Misamis Occidental","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-005","edition":2026,"table":"7.3","printed_page":138,"region":"Mindanao","name":"Placer – Luna 69 kV Transmission Line Project","location_report":"Surigao del Norte","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-006","edition":2026,"table":"7.3","printed_page":138,"region":"Mindanao","name":"Opol – CDO 69 kV Transmission Line Project","location_report":"Misamis Oriental","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-007","edition":2026,"table":"7.3","printed_page":138,"region":"Mindanao","name":"Davao – Toril 69 kV Transmission Line Project","location_report":"Davao del Sur","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-008","edition":2026,"table":"7.3","printed_page":138,"region":"Mindanao","name":"Maco – Mati 69 kV Transmission Line Project","location_report":"Davao de Oro, Davao Oriental","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-009","edition":2026,"table":"7.3","printed_page":139,"region":"Mindanao","name":"Nagamin – Ipil 69 kV Transmission Line Project","location_report":"Zamboanga Sibugay","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-010","edition":2026,"table":"7.3","printed_page":139,"region":"Mindanao","name":"Marawi – Malabang 69 kV Transmission Line Project","location_report":"Lanao del Sur","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-011","edition":2026,"table":"7.3","printed_page":139,"region":"Mindanao","name":"Nabunturan – Monkayo 69 kV Transmission Line Project","location_report":"Davao de Oro","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-012","edition":2026,"table":"7.3","printed_page":139,"region":"Mindanao","name":"Placer – Madrid 69 kV Transmission Line Project","location_report":"Surigao del Norte","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-013","edition":2026,"table":"7.3","printed_page":140,"region":"Mindanao","name":"SIOM – Sindangan – Salug 69 kV Transmission Line Project","location_report":"Zamboanga del Norte","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-014","edition":2026,"table":"7.3","printed_page":140,"region":"Mindanao","name":"San Francisco – Barobo 69 kV Transmission Line Project","location_report":"Agusan del Sur, Surigao del Sur","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-015","edition":2026,"table":"7.3","printed_page":140,"region":"Mindanao","name":"Nagamin – Malangas 69 kV Transmission Line Project","location_report":"Zamboanga del Sur","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-016","edition":2026,"table":"7.3","printed_page":141,"region":"Mindanao","name":"Aurora – Kapatagan 69 kV Transmission Line Project","location_report":"Zamboanga del Sur, Lanao del Norte","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-017","edition":2026,"table":"7.3","printed_page":141,"region":"Mindanao","name":"Bislig – Barobo 69 kV Transmission Line Project","location_report":"Surigao del Sur","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-018","edition":2026,"table":"7.3","printed_page":141,"region":"Mindanao","name":"Butuan - Nasipit 69 kV Transmission Line Project","location_report":"Davao de Oro, Davao Oriental","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":69.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-019","edition":2026,"table":"7.3","printed_page":142,"region":"Mindanao","name":"Matanao 230/138 kV Transformer Project","location_report":"Davao del Sur","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-020","edition":2026,"table":"7.3","printed_page":142,"region":"Mindanao","name":"Mindanao Substation Expansion 5 Project (MSE5P)","location_report":"Various substations in Mindanao","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-021","edition":2026,"table":"7.3","printed_page":142,"region":"Mindanao","name":"Mindanao Substation Expansion 6 Project (MSE6P)","location_report":"Various substations in Mindanao","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-022","edition":2026,"table":"7.3","printed_page":142,"region":"Mindanao","name":"Mindanao Substation Expansion 7 Project (MSE7P)","location_report":"Various substations in Mindanao","table_horizon":"2031-2040","reported_ETC":"2031-2040","regulatory_status":"For Filing","design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.3-023","edition":2026,"table":"7.3","printed_page":142,"region":"Mindanao","name":"Midsayap 138 kV Substation Projects","location_report":"North Cotabato","table_horizon":"2031-2040","reported_ETC":"2031-2040 230 / 138 / 69 kV","regulatory_status":"For Filing","design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Structured text extraction; field review required","current_operation":"Unknown; ETC and ERC approval do not establish commissioning","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U001","edition":2026,"table":"7.4","printed_page":143,"region":"Mindanao","name":"Lala – Malabang – Sultan Kudarat 230 kV Transmission Line Project (230 KV Energization)","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U002","edition":2026,"table":"7.4","printed_page":143,"region":"Mindanao","name":"Sultan Kudarat – Tacurong 230 kV Transmission Line Project (230 KV Energization)","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U003","edition":2026,"table":"7.4","printed_page":143,"region":"Mindanao","name":"Matanao – Tacurong 230 kV Transmission Line Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U004","edition":2026,"table":"7.4","printed_page":144,"region":"Mindanao","name":"Bunawan – Tagum 230 KV Transmission Line Project (230 KV Energization)","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U005","edition":2026,"table":"7.4","printed_page":144,"region":"Mindanao","name":"Eastern Mindanao 230 KV Transmission Line Project (230 KV Energization)","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":230.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U006","edition":2026,"table":"7.4","printed_page":144,"region":"Mindanao","name":"Polanco – Oroquieta 138 kV Transmission Line Project (138 kV Energization)","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U007","edition":2026,"table":"7.4","printed_page":144,"region":"Mindanao","name":"Aurora – Oroquieta 138 kV Transmission Line Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U008","edition":2026,"table":"7.4","printed_page":144,"region":"Mindanao","name":"Placer – Tago 138 kV Transmission Line Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U009","edition":2026,"table":"7.4","printed_page":144,"region":"Mindanao","name":"Gen. Santos – Maasim 138 kV Transmission Line Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U010","edition":2026,"table":"7.4","printed_page":144,"region":"Mindanao","name":"Bislig – Baganga 138 kV Transmission Line Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U011","edition":2026,"table":"7.4","printed_page":144,"region":"Mindanao","name":"Baganga – Mati 138 kV Transmission Line Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U012","edition":2026,"table":"7.4","printed_page":144,"region":"Mindanao","name":"Mindanao Substation Expansion 8 Project (MSE8P)","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U013","edition":2026,"table":"7.4","printed_page":144,"region":"Mindanao","name":"Mindanao Substation Expansion 9 Project (MSEP9)","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":null,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"},{"project_id":"NGCP-2026-7.4-U014","edition":2026,"table":"7.4","printed_page":144,"region":"Mindanao","name":"Maasim 138 kV Substation Project","location_report":null,"table_horizon":"2041-2050","reported_ETC":"2041-2050","regulatory_status":null,"design_voltage_kV":138.0,"initial_energization_kV":null,"source_url":"https://www.ngcp.ph/Attachment-Uploads/TDP%202026-2050%20Report_Aug17-2026-08-19-08-10-53.pdf","extraction_status":"Unnumbered long-horizon title; manual review required","current_operation":"Unknown; proposed horizon only","geometry_link_status":"Unlinked to physical OSM assets"}]