[{"project_id":"TDP-001","name":"Catarman–Mapanas–Oras 138 kV transmission line","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 6.6 Visayas outlook 2041–2050","source_key":"vis2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"V01","trace_source_vertices":10,"fit_rmse_projected_km":1.8764,"leave_one_out_rmse_projected_km":3.4179,"has_trace":true},{"project_id":"TDP-002","name":"Borongan–Taft 138 kV transmission line","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 6.6 Visayas outlook 2041–2050","source_key":"vis2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"V02","trace_source_vertices":4,"fit_rmse_projected_km":1.8764,"leave_one_out_rmse_projected_km":3.4179,"has_trace":true},{"project_id":"TDP-003","name":"San Jose–Nabas 138 kV transmission line","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 6.6 Visayas outlook 2041–2050","source_key":"vis2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"V03","trace_source_vertices":7,"fit_rmse_projected_km":1.8764,"leave_one_out_rmse_projected_km":3.4179,"has_trace":true},{"project_id":"TDP-004","name":"Palo–Sogod 230 kV transmission line","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 6.6 Visayas outlook 2041–2050","source_key":"vis2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"V04","trace_source_vertices":4,"fit_rmse_projected_km":1.8764,"leave_one_out_rmse_projected_km":3.4179,"has_trace":true},{"project_id":"TDP-005","name":"Siaton–Dumaguete 138 kV transmission line","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 6.6 Visayas outlook 2041–2050","source_key":"vis2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"V05","trace_source_vertices":6,"fit_rmse_projected_km":1.8764,"leave_one_out_rmse_projected_km":3.4179,"has_trace":true},{"project_id":"TDP-006","name":"Pusok–Cordova 230 kV interconnection","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 6.8 Metro Cebu outlook 2041–2050","source_key":"cebu2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"C01","trace_source_vertices":7,"fit_rmse_projected_km":0.7317,"leave_one_out_rmse_projected_km":1.479,"has_trace":true},{"project_id":"TDP-007","name":"Laray–Cordova 230 kV interconnection","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 6.8 Metro Cebu outlook 2041–2050","source_key":"cebu2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"C02","trace_source_vertices":5,"fit_rmse_projected_km":0.7317,"leave_one_out_rmse_projected_km":1.479,"has_trace":true},{"project_id":"TDP-008","name":"Naga Min–Salug 138 kV transmission line","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2033-07","horizon_start":2033,"horizon_end":2033,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M01","trace_source_vertices":5,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-009","name":"Naga Min–Ipil 69 kV transmission line","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2032-12","horizon_start":2032,"horizon_end":2032,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M02","trace_source_vertices":3,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-010","name":"Lala–Malabang–Sultan Kudarat 230 kV transmission line","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2032-12","horizon_start":2032,"horizon_end":2032,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M03","trace_source_vertices":7,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-011","name":"Lala–Sta. Clara–Tumaga 230 kV transmission line","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2034-07","horizon_start":2034,"horizon_end":2034,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M04","trace_source_vertices":16,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-012","name":"Sultan Kudarat–Tacurong 230 kV transmission line","design_voltage_kV":230,"initial_or_stage_energization_kV":138,"report_schedule":"2033-10","horizon_start":2033,"horizon_end":2033,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M05","trace_source_vertices":7,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-013","name":"Bunawan–Tagum 230 kV transmission line","design_voltage_kV":230,"initial_or_stage_energization_kV":138,"report_schedule":"2031-03","horizon_start":2031,"horizon_end":2031,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M06","trace_source_vertices":4,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-014","name":"Villanueva–Kinamlutan 230 kV transmission line","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2033-01","horizon_start":2033,"horizon_end":2033,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M07","trace_source_vertices":7,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-015","name":"Eastern Mindanao 230 kV transmission line","design_voltage_kV":230,"initial_or_stage_energization_kV":138,"report_schedule":"2032-10","horizon_start":2032,"horizon_end":2032,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M08","trace_source_vertices":13,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-016","name":"Culaman–General Santos 230 kV transmission line","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2035-12","horizon_start":2035,"horizon_end":2035,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M09","trace_source_vertices":5,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-017","name":"Zamboanga–Basilan interconnection","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"2031-12","horizon_start":2031,"horizon_end":2031,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M10","trace_source_vertices":4,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-018","name":"Nasipit–Butuan 69 kV transmission line","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2031-12","horizon_start":2031,"horizon_end":2031,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M11","trace_source_vertices":3,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-019","name":"Opol–Carmen 69 kV transmission line","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2031-12","horizon_start":2031,"horizon_end":2031,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M12","trace_source_vertices":4,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-020","name":"Agus 6–Kiwalan–Lugait 69 kV transmission line","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2032-10","horizon_start":2032,"horizon_end":2032,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M13","trace_source_vertices":4,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-021","name":"Nabunturan–Monkayo 69 kV transmission line","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2035-12","horizon_start":2035,"horizon_end":2035,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M14","trace_source_vertices":4,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-022","name":"Maco–Tagum 69 kV transmission line","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2032-12","horizon_start":2032,"horizon_end":2032,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M15","trace_source_vertices":3,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-023","name":"Siom–Sindangan–Salug 69 kV transmission line","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2035-12","horizon_start":2035,"horizon_end":2035,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M16","trace_source_vertices":7,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-024","name":"Placer–Luna 69 kV transmission line","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2031-12","horizon_start":2031,"horizon_end":2031,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M17","trace_source_vertices":7,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-025","name":"Placer–Madrid 69 kV transmission line","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2035-12","horizon_start":2035,"horizon_end":2035,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M18","trace_source_vertices":9,"fit_rmse_projected_km":2.8351,"leave_one_out_rmse_projected_km":6.6091,"has_trace":true},{"project_id":"TDP-026","name":"San Francisco–Tago 69 kV transmission line","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2038-12","horizon_start":2038,"horizon_end":2038,"source_figure":"Figure 7.3 Mindanao projects 2031–2040","source_key":"md2038","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M19","trace_source_vertices":6,"fit_rmse_projected_km":2.7368,"leave_one_out_rmse_projected_km":5.4937,"has_trace":true},{"project_id":"TDP-027","name":"San Francisco–Barobo 69 kV transmission line","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2036-12","horizon_start":2036,"horizon_end":2036,"source_figure":"Figure 7.3 Mindanao projects 2031–2040","source_key":"md2038","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M20","trace_source_vertices":5,"fit_rmse_projected_km":2.7368,"leave_one_out_rmse_projected_km":5.4937,"has_trace":true},{"project_id":"TDP-028","name":"Bislig–Baganga 138 kV transmission line","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2036-12","horizon_start":2036,"horizon_end":2036,"source_figure":"Figure 7.3 Mindanao projects 2031–2040","source_key":"md2038","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M21","trace_source_vertices":5,"fit_rmse_projected_km":2.7368,"leave_one_out_rmse_projected_km":5.4937,"has_trace":true},{"project_id":"TDP-029","name":"Baganga–Mati 138 kV transmission line","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2038-12","horizon_start":2038,"horizon_end":2038,"source_figure":"Figure 7.3 Mindanao projects 2031–2040","source_key":"md2038","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M22","trace_source_vertices":5,"fit_rmse_projected_km":2.7368,"leave_one_out_rmse_projected_km":5.4937,"has_trace":true},{"project_id":"TDP-030","name":"Placer–Tago 138 kV transmission line","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2043-12","horizon_start":2043,"horizon_end":2043,"source_figure":"Figure 7.3 Mindanao projects 2041–2050","source_key":"md2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M23","trace_source_vertices":7,"fit_rmse_projected_km":2.9177,"leave_one_out_rmse_projected_km":6.3523,"has_trace":true},{"project_id":"TDP-031","name":"Matanao–Tacurong 230 kV transmission line","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2041-12","horizon_start":2041,"horizon_end":2041,"source_figure":"Figure 7.3 Mindanao projects 2041–2050","source_key":"md2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M24","trace_source_vertices":5,"fit_rmse_projected_km":2.9177,"leave_one_out_rmse_projected_km":6.3523,"has_trace":true},{"project_id":"TDP-032","name":"Aurora–Oroquieta 138 kV transmission line","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2046-12","horizon_start":2046,"horizon_end":2046,"source_figure":"Figure 7.3 Mindanao projects 2041–2050","source_key":"md2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M25","trace_source_vertices":7,"fit_rmse_projected_km":2.9177,"leave_one_out_rmse_projected_km":6.3523,"has_trace":true},{"project_id":"TDP-033","name":"General Santos–Maasim 138 kV transmission line","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2042-12","horizon_start":2042,"horizon_end":2042,"source_figure":"Figure 7.3 Mindanao projects 2041–2050","source_key":"md2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M26","trace_source_vertices":5,"fit_rmse_projected_km":2.9177,"leave_one_out_rmse_projected_km":6.3523,"has_trace":true},{"project_id":"TDP-034","name":"Bunawan–Tagum: energization at 230 kV","design_voltage_kV":230,"initial_or_stage_energization_kV":230,"report_schedule":"2041-12","horizon_start":2041,"horizon_end":2041,"source_figure":"Figure 7.3 Mindanao projects 2041–2050","source_key":"md2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M27","trace_source_vertices":4,"fit_rmse_projected_km":2.9177,"leave_one_out_rmse_projected_km":6.3523,"has_trace":true},{"project_id":"TDP-035","name":"Eastern Mindanao: energization at 230 kV","design_voltage_kV":230,"initial_or_stage_energization_kV":230,"report_schedule":"2042-12","horizon_start":2042,"horizon_end":2042,"source_figure":"Figure 7.3 Mindanao projects 2041–2050","source_key":"md2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Manual schematic trace, affine-georeferenced","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":"M28","trace_source_vertices":11,"fit_rmse_projected_km":2.9177,"leave_one_out_rmse_projected_km":6.3523,"has_trace":true},{"project_id":"TDP-036","name":"Bolo–Laoag 500 kV backbone","design_voltage_kV":500,"initial_or_stage_energization_kV":null,"report_schedule":"2028-03","horizon_start":2028,"horizon_end":2028,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-037","name":"Nagsaag–Kabugao 500 kV backbone","design_voltage_kV":500,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-038","name":"Western Luzon 500 kV backbone: Stage 2","design_voltage_kV":500,"initial_or_stage_energization_kV":null,"report_schedule":"2025-12","horizon_start":2025,"horizon_end":2025,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-039","name":"Metro Manila 500 kV backbone loop","design_voltage_kV":500,"initial_or_stage_energization_kV":null,"report_schedule":"2031–2040","horizon_start":2031,"horizon_end":2040,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-040","name":"Batangas–Mindoro interconnection: Stage 1","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"2027-09","horizon_start":2027,"horizon_end":2027,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-041","name":"Batangas–Mindoro interconnection: Stage 2","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"2030-12","horizon_start":2030,"horizon_end":2030,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-042","name":"Luzon–Visayas HVDC bipolar operation","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"2032-12","horizon_start":2032,"horizon_end":2032,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-043","name":"Palawan–Mindoro interconnection","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"2033-02","horizon_start":2033,"horizon_end":2033,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-044","name":"Mindoro–Panay 230 kV interconnection","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"National overview calls Mindoro–Panay 230 kV; regional Figure 6.6 calls Panay–Mindoro HVDC. Preserve both; do not reconcile without engineering source.","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-045","name":"Cebu–Negros–Panay 230 kV backbone","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"Completed in source","horizon_start":null,"horizon_end":null,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Completed in source overview only","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-046","name":"Metro Cebu 230 kV backbone loop","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2024–2050","horizon_start":2024,"horizon_end":2050,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-047","name":"Cebu–Bohol–Leyte 230 kV backbone","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2024–2050","horizon_start":2024,"horizon_end":2050,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-048","name":"Mindanao–Visayas interconnection","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"Completed in source","horizon_start":null,"horizon_end":null,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Completed in source overview only","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-049","name":"Mindanao 230 kV backbone","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"Completed in source","horizon_start":null,"horizon_end":null,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Completed in source overview only","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-050","name":"Western Mindanao 230 kV backbone","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2031–2040","horizon_start":2031,"horizon_end":2040,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-051","name":"Eastern Mindanao 230 kV backbone","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2032","horizon_start":2032,"horizon_end":2032,"source_figure":"National transmission outlook","source_key":"overview","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-052","name":"La Trinidad–Sagada 230 kV transmission line","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 5.11 North Luzon outlook 2041–2050","source_key":"north","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-053","name":"Kabugao 500 kV substation","design_voltage_kV":500,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 5.11 North Luzon outlook 2041–2050","source_key":"north","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-054","name":"Baler–Dinadiawan 230 kV transmission line","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 5.11 North Luzon outlook 2041–2050","source_key":"north","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-055","name":"Capas–Bolo 230 kV transmission line","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 5.12 Central Luzon outlook 2041–2050","source_key":"central","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-056","name":"Limay–Pasay 230 kV transmission line","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 5.13 Metro Manila outlook 2041–2050","source_key":"manila","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-057","name":"Alaminos 500 kV substation","design_voltage_kV":500,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 5.14 South Luzon outlook 2041–2050","source_key":"south","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-058","name":"Naga–Tublijon 500 kV transmission line","design_voltage_kV":500,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 5.15 Bicol regional outlook 2041–2050","source_key":"bicol","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-059","name":"Matnog 230 kV substation","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 5.15 Bicol regional outlook 2041–2050","source_key":"bicol","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-060","name":"Nabas–Caticlan–Boracay transmission line","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"2026-08","horizon_start":2026,"horizon_end":2026,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-061","name":"Barotac Viejo–Unidos 230 kV transmission line: Stage 1","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2029-12","horizon_start":2029,"horizon_end":2029,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-062","name":"Barotac Viejo–Natividad 69 kV transmission line","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2028-02","horizon_start":2028,"horizon_end":2028,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-063","name":"Panay–Guimaras 138 kV interconnection","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2026-04","horizon_start":2026,"horizon_end":2026,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-064","name":"Panay–Guimaras 138 kV interconnection: Line 2","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2028-07","horizon_start":2028,"horizon_end":2028,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-065","name":"Tigbauan 138 kV substation","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2029-08","horizon_start":2029,"horizon_end":2029,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-066","name":"Granada 230 kV substation","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2030-06","horizon_start":2030,"horizon_end":2030,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-067","name":"Amlan–Dumaguete 138 kV transmission line","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2026-01","horizon_start":2026,"horizon_end":2026,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-068","name":"Bobolosan–Mapanas 138 kV transmission line (69 kV energized)","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2030-12","horizon_start":2030,"horizon_end":2030,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-069","name":"Calbayog–Allen transmission line","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"2027-12","horizon_start":2027,"horizon_end":2027,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-070","name":"Taft–Oras 138 kV transmission line (69 kV energized)","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2030-12","horizon_start":2030,"horizon_end":2030,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-071","name":"Babatngon–Palo 230 kV transmission line (138 kV energized)","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2030-12","horizon_start":2030,"horizon_end":2030,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-072","name":"Relocation of transmission towers in Leyte","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"2028-06","horizon_start":2028,"horizon_end":2028,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-073","name":"Cebu–Leyte 230 kV interconnection: Lines 3 and 4 Stage 1","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2029-12","horizon_start":2029,"horizon_end":2029,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-074","name":"Corella–Ubay 138 kV Line 2 stringing","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2030-09","horizon_start":2030,"horizon_end":2030,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-075","name":"Bool 138 kV substation","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2030-12","horizon_start":2030,"horizon_end":2030,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-076","name":"Cebu–Bohol 230 kV interconnection","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2024-12","horizon_start":2024,"horizon_end":2024,"source_figure":"Figure 6.1 Visayas outlook 2024–2030","source_key":"vis2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-077","name":"Cebu–Lapu-Lapu transmission project","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"2025-12","horizon_start":2025,"horizon_end":2025,"source_figure":"Figure 6.2 Metro Cebu outlook 2024–2030","source_key":"cebu2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-078","name":"Lapu-Lapu 230 kV substation","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2026-07","horizon_start":2026,"horizon_end":2026,"source_figure":"Figure 6.2 Metro Cebu outlook 2024–2030","source_key":"cebu2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-079","name":"Visayas substation reliability project II","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"2024-09","horizon_start":2024,"horizon_end":2024,"source_figure":"Figure 6.2 Metro Cebu outlook 2024–2030","source_key":"cebu2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-080","name":"Laray 230 kV substation","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2028-11","horizon_start":2028,"horizon_end":2028,"source_figure":"Figure 6.2 Metro Cebu outlook 2024–2030","source_key":"cebu2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-081","name":"Colon substation upgrading: Visayas substation upgrading 3","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"2027-10","horizon_start":2027,"horizon_end":2027,"source_figure":"Figure 6.2 Metro Cebu outlook 2024–2030","source_key":"cebu2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-082","name":"Nivel Hills 230 kV substation","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2030-12","horizon_start":2030,"horizon_end":2030,"source_figure":"Figure 6.2 Metro Cebu outlook 2024–2030","source_key":"cebu2030","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-083","name":"Panay–Mindoro HVDC interconnection","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 6.6 Visayas outlook 2041–2050","source_key":"vis2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"National overview calls Mindoro–Panay 230 kV; regional Figure 6.6 calls Panay–Mindoro HVDC. Preserve both; do not reconcile without engineering source.","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-084","name":"Sipalay 138 kV substation","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 6.6 Visayas outlook 2041–2050","source_key":"vis2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-085","name":"Visayas regional PCB replacement project 3","design_voltage_kV":null,"initial_or_stage_energization_kV":null,"report_schedule":"2041–2050","horizon_start":2041,"horizon_end":2050,"source_figure":"Figure 6.6 Visayas outlook 2041–2050","source_key":"vis2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-086","name":"Tumaga 230 kV substation","design_voltage_kV":230,"initial_or_stage_energization_kV":null,"report_schedule":"2032-01","horizon_start":2032,"horizon_end":2032,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-087","name":"Malaybalay 138 kV substation","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2032-12","horizon_start":2032,"horizon_end":2032,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-088","name":"Marawi–Malabang 69 kV transmission line","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2032-12","horizon_start":2032,"horizon_end":2032,"source_figure":"Figure 7.2 Mindanao projects 2031–2040","source_key":"md2035","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-089","name":"Naga Min–Malangas 69 kV substation","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2036-12","horizon_start":2036,"horizon_end":2036,"source_figure":"Figure 7.3 Mindanao projects 2031–2040","source_key":"md2038","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-090","name":"Aurora–Kapatagan 69 kV substation","design_voltage_kV":69,"initial_or_stage_energization_kV":null,"report_schedule":"2036-12","horizon_start":2036,"horizon_end":2036,"source_figure":"Figure 7.3 Mindanao projects 2031–2040","source_key":"md2038","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-091","name":"Midsayap 138 kV substation","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2038-12","horizon_start":2038,"horizon_end":2038,"source_figure":"Figure 7.3 Mindanao projects 2031–2040","source_key":"md2038","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false},{"project_id":"TDP-092","name":"Maasim 138 kV substation","design_voltage_kV":138,"initial_or_stage_energization_kV":null,"report_schedule":"2042-12","horizon_start":2042,"horizon_end":2042,"source_figure":"Figure 7.3 Mindanao projects 2041–2050","source_key":"md2050","schedule_meaning":"Historical report schedule; present implementation/completion not verified","operational_status":"Planning or reinforcement in supplied report; current status unverified","geometry_status":"Register only; no verified route geometry","source_edition":"Supplied TDP 2024–2050 figures; edition date not established from image alone","conflict_note":"","interpretation_note":"This is a traced planning depiction, not an as-built route, tower alignment or electrical connectivity model.","trace_id":null,"trace_source_vertices":null,"fit_rmse_projected_km":null,"leave_one_out_rmse_projected_km":null,"has_trace":false}]