Interactive atlas

AGAPAY interactive atlas of mapped Philippine transmission and hydropower evidence

About this page

What you can find
Mapped transmission lines and substations by voltage class, report planning corridors traced from NGCP Transmission Development Plan figures, and hydropower inventory rows placed at a recorded point or a municipal search area. Filter by region, voltage and evidence type, select any feature for its source tags, and export the current selection as GeoJSON or CSV.
How the evidence was produced
Lines and substations come from an OpenStreetMap extract dated 5 July 2026 (3,282 lines, 856 substation records). Planning corridors are manual traces of NGCP report figures, georeferenced with affine fits. Hydropower rows come from AGAPAY V12’s source-only table built on the DOE awarded-contract list.
Limits
Mapped ways are not certified circuits, and no buses or circuit assignments have been electrically verified. Planning traces are depictions of report figures, not surveyed routes. Search areas are not plant locations. Satellite imagery is the 2016 Sentinel-2 cloudless mosaic and does not show current conditions.